15 March 2006
Dear Councillor,
In pursuance of the provisions of the Local
Government Act, 1993 and the Regulations thereunder, notice is hereby given
that a POLICY REVIEW COMMITTEE MEETING of
Penrith City Council is to be held in the Passadena Room, Civic Centre, 601
High Street, Penrith on Monday 20 March 2006 at 7:00PM.
Attention is directed to the statement
accompanying this notice of the business proposed to be transacted at the
meeting.
Yours Faithfully
Alan Travers
General Manager
BUSINESS
1. APOLOGIES
2. LEAVE OF ABSENCE
Leave of absence has been granted to:
Councillor Rumble - 13 March 2006 to 29 March 2006 inclusive.
Councillor Simat - 13 March 2006 to 24 March 2006 inclusive.
3. CONFIRMATION OF MINUTES
Policy Review Committee Meeting - 27 February 2006.
4. DECLARATIONS OF INTEREST
Pecuniary Interest (The
Act requires Councillors who declare a pecuniary interest in an item to leave
the meeting during discussion of that item)
Non-Pecuniary Interest
5. ADDRESSING THE MEETING
6. MAYORAL MINUTES
7. NOTICES OF MOTION
8. ADOPTION OF REPORTS AND
RECOMMENDATION OF COMMITTEES
9. MASTER PROGRAM REPORTS
10. URGENT REPORTS (to
be dealt with in the master program to which the item relates)
11. QUESTIONS WITHOUT NOTICE
12. COMMITTEE OF THE WHOLE
Monday 20 March 2006
table of contents
meeting calendar
confirmation of minutes
master program reports
MEETING CALENDAR
March 2006 - December
2006
|
TIME |
MAR |
APRIL |
MAY |
JUNE |
JULY |
AUG |
SEPT |
OCT |
NOV |
DEC |
|
||
Mon |
Mon |
Mon |
Mon |
Mon |
Mon |
Mon |
Mon |
Mon |
Mon |
|
||||
Ordinary Meetings |
7.00 pm |
|
3 |
1v |
5 |
3 |
7 |
4ü |
9 |
6 |
4 |
|
||
|
24 |
15 # |
19* |
17 |
21#+ |
18 25^ |
23 |
20 # |
11 |
|
||||
Policy Review Committee |
7.00 pm |
20@ |
|
22 |
26 |
24 |
28 |
11@ |
16 |
13 |
|
|
||
|
#
Meetings at which the Management Plan quarterly reviews are presented. |
v Meeting at which the Draft Management Plan is adopted
for exhibition |
||||||||||||
|
#+
General Manager’s presentation – half year and end of year review |
*
Meeting at which the Management Plan
for 2006/2007 is adopted |
||||||||||||
|
@ Strategic
Program progress reports (only business) |
ü Meeting at which the
2005/2006 Annual Statements are presented |
||||||||||||
|
|
^ Election of Mayor/Deputy Mayor (only business) |
||||||||||||
·
Council has two Ordinary
Meetings per month where practicable.
·
Extraordinary Meetings are held
as required.
·
Policy Review Meetings are held
monthly where practicable.
·
Members of the public are
invited to observe meetings (Ordinary & Policy Review) of the Council.
Should you wish to address Council, please contact the Executive Officer,
Glenn McCarthy on 47327649.
UNCONFIRMED MINUTES
OF THE POLICY
REVIEW COMMITTEE MEETING OF PENRITH CITY COUNCIL HELD IN THE PASSADENA ROOM,
PENRITH
ON MONDAY 27 FEBRUARY 2006 AT 7:08PM
PRESENT
His Worship the Mayor Councillor John Thain, Councillors Kaylene Allison, David Bradbury (arrived 7:50PM), Lexie Cettolin, Mark Davies, Ross Fowler, Karen McKeown, Susan Page, and Steve Simat.
APOLOGIES |
PRC 1 RESOLVED on the MOTION of Councillor Ross Fowler seconded Councillor Mark Davies that apologies be received and accepted from Councillor David Bradbury. |
LEAVE OF ABSENCE |
PRC 2 RESOLVED on the MOTION of Councillor Ross Fowler seconded Councillor Mark Davies that leave of absence be granted to Councillors Jim Aitken OAM, Kevin Crameri OAM, Greg Davies, Jackie Greenow, Garry Rumble, and Pat Sheehy AM, who are attending the Floodplain Management Authorities Conference in Lismore. |
CONFIRMATION OF MINUTES - Policy Review Committee Meeting - 14 November 2005 |
PRC 3 RESOLVED on the MOTION of Councillor Ross Fowler seconded Councillor Mark Davies that the minutes of the Policy Review Committee Meeting of 14 November 2005 be confirmed. |
DECLARATIONS OF INTEREST
There were no declarations of interest
MASTER PROGRAM REPORTS
The
City as a Social Place
1 Penrith Bicentennial Performing Arts
Centre Ltd - 2004/05 Annual Report and Board of Directors 961/13 |
Councillor Fowler requested that the relevant
financial statements be circulated to all Councillors. |
PRC 4 RESOLVED on the MOTION of Councillor Susan
Page seconded Councillor Lexie Cettolin That: 1. The
information contained in the report on Penrith Bicentennial Performing Arts Centre
Ltd - 2004/05 Annual Report and Board of Directors be received 2. Council congratulate the Board of the Penrith Bicentennial Performing Arts Centre Ltd for the results over the twelve months to end of June 2005 3. Mr Mario Bellantonio OAM be reappointed to fill the vacancy that occurred at the Seventeenth Annual General Meeting of the Penrith Bicentennial Performing Arts Centre Ltd 4. Council
agree to underwrite the operations of the Penrith Bicentennial Performing
Arts Centre Ltd until the presentation to Council of the Penrith Bicentennial
Performing Arts Centre Ltd Annual Report for 2005/06. |
2 Penrith Regional Gallery and Lewers
Bequest Ltd - 2004/05 Annual Report and Board of Directors 1043/11 |
PRC 5 RESOLVED on the MOTION of Councillor
Kaylene Allison seconded Councillor Ross Fowler That: 1. The
information contained in the report on Penrith Regional Gallery and Lewers Bequest
Ltd - 2004/05 Annual Report and Board of Directors be received 2. Council congratulate the Board
of the Penrith Regional Gallery and Lewers Bequest Ltd for the results over
the twelve months to end of June 2005 3. Mrs Tanya Crothers and Mrs Darani Lewers be reappointed to fill
the vacancies that occurred at the Third Annual General Meeting of the
Penrith Regional Gallery and Lewers Bequest Ltd. 4. Council
agree to underwrite the operations of the Penrith Regional Gallery and Lewers
Bequest Ltd until the presentation to Council of the Penrith Regional Gallery
and Lewers Bequest Ltd Annual Report for 2005/06. |
3 Penrith City Children's Services
Co-operative Ltd 1343/2 |
PRC 6 RESOLVED on the MOTION of Councillor Ross
Fowler seconded Councillor Kaylene Allison That: 1. The
information contained in the report on Penrith City Children's Services
Co-operative Ltd be received 2. Council continue to underwrite the operations of Penrith City
Children’s Services Co-operative to 30 June 2007 subject to receipt of Annual
Budgets. |
Leadership
and Organisation
4 Financial Settings for the 2006-2007
Management Plan 36/47 |
PRC 7 RESOLVED on the MOTION of Councillor Steve
Simat seconded Councillor Lexie Cettolin That: 1. The
information contained in the report on Financial Settings for the 2006-2007 Management
Plan be received 2. Council make initial identification of particular matters to be considered in the preparation of the Draft 2006-2007 Management Plan 3. Preparation
of the Draft 2006-2007 Management Plan continue in the terms discussed in
this report. |
5 Alignment of the Organisation 36/39 |
Councillor David Bradbury arrived at the
meeting the time being 7:50PM PRC 8 RESOLVED on the MOTION of Councillor Susan
Page seconded Councillor Kaylene Allison That: 1. The
information contained in the report on Alignment of the Organisation be received 2. The proposed changes to Director
accountabilities for certain Issues and Manager accountability for Term
Achievements be endorsed. |
6 Draft Salary Packaging Policy
|
PRC 9 RESOLVED on the MOTION of Councillor Ross
Fowler seconded Councillor Susan Page That: 1. The
information contained in the report on Draft Salary Packaging Policy be received 2. That the Policy is implemented from 1 April 2006 3. A
series of information sessions be held for staff. |
7 Service Specification Program 36/35 |
PRC 10 RESOLVED on the MOTION of Councillor Steve
Simat seconded Councillor Ross Fowler That: 1. The
information contained in the report on Service Specification Program be received 2. The specification for the Building Maintenance service be adopted 3. The specification for the Children’s Services Managed by Council service be adopted 4. The specification for the Children’s Services Managed by the Penrith City Children’s Services Cooperative service be adopted 5. The
specification for the Emergency Management service be adopted. |
8 Local Government Amendment Act 2005 754/10 |
PRC
11
RESOLVED on the MOTION of Councillor Ross Fowler seconded Councillor
Steve Simat that the information contained in the report on Local Government Amendment Act
2005 be received. |
There being no further business the Chairperson declared the meeting closed the time being 8:20PM.
Item Page
Leadership
and Organisation
1 2005-2009
Strategic Program - Progress to December 2005
1
THIS
PAGE HAS BEEN LEFT BLANK INTENTIONALLY
Leadership
and Organisation
Item Page
1 2005-2009
Strategic Program - Progress to December 2005
1
20 March 2006 |
|
Leadership and
Organisation |
|
Leadership and Organisation
1 |
2005-2009
Strategic Program - Progress to December 2005 |
|
Compiled by: Ross
Kingsley, Corporate Development Manager
Authorised by: Alan Stoneham, Director City Strategy
Strategic Program
Term Achievement: A commonly shared long-term
vision for the City underpins strategic collaboration and community engagement.
Critical Action: Prepare, implement and review Strategic Plans and processes.
Purpose:
To review progress
in the initial six months of Council's 2005-2009 Strategic Program and discuss
with Council the plans for delivery of the program. The report recommends that
the information provided be received and that certain amendments to the
Strategic Program be adopted.
Background
The Strategic Plan is Council’s principal policy document. As such it contains Council’s vision
statement and strategic directions for the City. The Plan is expressed in six
Master Programs, which together constitute a complete conceptual model of the
City and identify those Issues that Council has chosen to address. Longer Term
Goals are enunciated for each of those Issues.
Council has also adopted a Strategic Program for the period 2005-2009
comprising Term Achievements that define what Council wants to achieve in this
term. At the next level of detail, the
program identifies a small number of Critical Actions that are to be delivered
in order to secure that Term Achievement.
The Strategic Program is of particular importance as annual Management
Plans are in essence derived from it.
To achieve Council’s 2005-2009 Strategic Program, accountability for
securing the ambitions of each Issue has been allocated to individual Directors
as ‘stewards’ of these strategic goals in keeping with their broad function
areas.
In addition, responsibility has been allocated to Managers for
delivering each Term Achievement and for the Critical Actions that attach to
those outcomes. This followed an organisational review of accountabilities that
was recently endorsed by Council.
Key
Themes of the Strategic Program
In December 2004, Council adopted the 2005-2009 Strategic Plan for the
City and the Strategic Program to deliver it. The present report comments on
the first six months of that program.
In developing the Strategic Plan, Council highlighted certain key
themes for emphasis in the organisation’s response to the four year program.
While recognising that Council’s new strategy continues and builds on many of
the principal directions set by previous Councils, it was also seen to reflect
a number of new or strengthened themes, such as:
· The City considered in a broader context and in its metropolitan role, leadership, collaboration and partnering with government, other advocates and the City’s people;
· Managing the growth, development and change of places so that they are sustainable and satisfying for those who choose to live there, recognising this need not only for new areas but for our older neighbourhoods;
· Quality of life for residents, including accessible cultural, social, economic services and access to readily suitable employment;
· Securing and providing the infrastructure which a growing regional City needs and managing it in a sustainable way;
· Equipping and managing the organisation to deliver Council’s program effectively in a context of generational change in its workforce, increasing demand for services from Local Government and increasing insistence for local communities to be more involved in decisions which affect them.
These themes were to be used to develop responses to Council’s strategy across Master Programs and to test draft Management Plan proposals as they emerge.
Progress
Reporting
According to Council’s established practice, it is intended to provide six-monthly progress reports to Council on the Strategic Program. Two Policy Review Committee meetings each year will be reserved for the purpose of providing this report, making appropriate accompanying presentations and discussing key strategic issues with Council. This would normally be directed to March and September of each year, depending on Council’s calendar.
Tonight’s report and an accompanying presentation by the Directors is the first such progress report on the 2005-2009 Strategic Program.
Format
of the Report
The progress review is provided as an Attachment to this report, which will also be published as a separate booklet and made available to the public including through Council’s website.
Given the lifting of Director accountabilities to the Issue level in this Strategic Program and the greater involvement of Managers through their new accountabilities and in the teams which have analysed Term Achievement requirements, these changes are be reflected in the nature of the Strategic Program report.
The report is made by:
· Directors at Issue level
· Managers (authorised by Directors) at Term Achievement level
As the first six-monthly report on Council’s four year program, the focus of the review is less on the deliverables achieved to date and more on detailing for Council’s consideration the direction being pursued for each element of the program.
In addition to progress commentary on the 34 Issues and 83 Term Achievements, a section has been added discussing the Context of each Term Achievement and its key challenges as assessed by the organisation. This is drawn from the action plans for the delivery of each Term Achievement which have been established by each of the Term Achievement ‘Cluster’ teams of Directors and Managers, a new arrangement which has recently been discussed with Council.
A comprehensive assessment of the requirements of this Strategic Program has been undertaken by the organisation since its adoption, in greater depth than ever before. This has informed the planning of operations for the remaining term of the program, as well as the Capacity Review process that is presently being discussed with Council through the next Management Plan development.
These approaches are serving to define the task ahead for the organisation to secure Council’s strategy for the period to June 2009 and, through the longer term goals, the future well being of the City.
Commentary
from Directors
Each Director has provided a commentary in the report Attachment on
progress, issues and directions within their responsibility areas.
This approach has in recent years proven its worth in allowing Council
to identify the parts of its platform which needed to be given particular
emphasis, accelerated or further funded.
The Directors have sought through their commentary on each Issue to
indicate in summary what needs to be achieved to satisfy Council’s intent in
this area and the approach being taken to address this purpose. An overview is
given of key aspects of progress and major challenges.
As previously recognised, these reports serve to emphasise that the
Directors’ principal function is about delivering strategic outcomes rather
than managing operational detail.
The General Manager’s recent report to the Policy Review Committee on alignment of the organisation identified three changes to Director accountability. These changes have not been applied for the purposes of the progress review. Directors have reported on the Issues for which they were formally accountable as at 31 December 2005.
Managers’
Reporting on Term Achievements
Council recently endorsed the assignment of accountability for Term Achievements in its Strategic Program to Managers. The present report reflects those new accountabilities and a further lifting of the strategic focus and authority of Managers. This has been a direction consistently pursued by Council over recent years in order to fashion a better aligned organisation and one which is well placed to deal with generational change.
Directors responsible for the Issue in which the Term Achievement resides have provided their seasoned appreciation of the priorities addressed and approved the relevant Manager’s report. This flexibility across traditional reporting lines also reflects the strategy-driven nature of the organisation.
All Managers will be in attendance at the meeting, in order to benefit from this discussion with Council as well as to, as appropriate, respond to matters that may be raised by Council relating to particular Term Achievements.
Presentations
on Master Programs
Following an introduction by the General Manager, a brief presentation will be made by each Director summarising the main points of Council’s strategic directions by Master Program and providing an opportunity for discussion with Council.
Directors have accountabilities for Issues across Master Programs,
however to be practical the presentation has been assigned to a particular
Director for each Master Program. This was the model followed for the
presentation to Council of the final performance report on the previous Strategic
Program.
Given the scale of the Strategic Program, the presentation needs to be
crisp and succinct, with time allowed for discussion with Council. The key
points in each Issue are in general based on the Term Achievements and how we
will deliver them.
The assignment to Directors for the presentation is:
The
City in its Broader Context Director
~ City Strategy
The
City as a Social Place [in two parts]
~
Services Issues Director
~ City Services
~
Planning Issues Director
~ City Planning
The
City as an Environment Director
~ City Planning
The
City as an Economy Director
~ City Strategy
The
City Supported by Infrastructure Director
~ City Operations
Leadership
& Organisation Chief
Financial Officer
Introduction
of Strategic Plan DVD
Councillors would be aware that the organisation has been preparing a
DVD production on the City of Penrith, based on the themes of the Strategic
Plan, which will be used to promote the City and inform our partners.
This DVD, Penrith City: the Competitive Edge is almost completed
and it is proposed tonight to provide a brief introductory viewing of
appropriate elements of the DVD as a lead in to the meeting.
Proposed
Amendments to the Program
In the intensive consideration by management of the requirements of the
Strategic Program and the resulting development of delivery plans, a small
number of areas has been identified where a revision is suggested in order to
clarify Council’s purpose or to respond more strongly to matters of clearly
high priority.
It is proposed that, subject to Council’s endorsement tonight, it would
be appropriate to make these adjustments to the Term Achievements and Critical
Actions subsequent to the period covered by the present report, that is, to
take effect from 1 January 2006.
These suggested amendments are detailed in Appendix A,
with an explanation of each.
Conclusion
The commentary provided in tonight’s report can be elaborated on by the
responsible Director if required. The comprehensive written report is framed to
allow Council to be able to look in more detail at the delivery of its program
and provide feedback on directions proposed, as well as testing the initial
progress towards key deliverables. The presentation format will provide a
natural focus for this discussion.
The scale and depth of this first progress report to Council on its
2005-2009 Strategic Program demonstrates the imperative for the organisation to
lift to the next level of strategic outcome delivery for the City. It also
evidences the organisation’s growing capacity to do so, in response to
Council’s leadership. This capability has been further enhanced by the new
accountabilities that have been endorsed by Council and the management team
arrangements put in place to coordinate strategic planning and delivery in each
area of the program.
That: 1. The information contained in the report on the 2005-2009 Strategic Program - Progress to December 2005 be received 2. The proposed amendments to Term Achievements and Critical Actions as detailed in Appendix A to the report be adopted from 1 January 2006. |
1.
View |
Proposed Amendments to Term Achievements
and Critical Actions |
3 Pages |
Appendix |
Strategic Program Review Report - December 2005 |
146 Pages |
Attachment |
20 March 2006 |
|
Appendix 1 - Proposed Amendments to
Term Achievements and Critical Actions |
|
|
|
|
|
Appendix A
Proposed Amendments to Term
Achievements and Critical Actions
The City in its Broader Context
Issue 4. Regional Growth (DCS)
Term Achievement 4.1 The community and City organisations are informed on issues
relevant to metropolitan growth and development that affect the City and the
reasons for Council’s response to them.
(EPM)
Critical Action 4.1C Develop a City-wide Integrated Local Plan. (LPM)
PROPOSED CHANGE:
Lift this Critical Action to a separate additional Term Achievement:
New TA 4.5 Council’s agreed strategies, where they
relate to planning provisions, are implemented through the new Citywide
‘Penrith Local Plan’ and ‘Penrith Development Control Plan’. (LPM)
REASON: To reflect the level of importance of the
Local Plan requirement in the Strategic Program. This response to the
Government’s planning reforms is a major undertaking for Council in the life of
the program.
Term Achievement 4.2 Joint responses and initiatives are regularly developed with
neighbouring Councils and regional organisations around metropolitan and
regional issues. (EPM)
Critical Action 4.2A Establish a forum with Blue Mountains and Hawkesbury
Councils to identify opportunities aimed at promoting the sub-region as an
attractive, vibrant place to live, work and visit. (EDCMM)
PROPOSED
CHANGE: Merge this Critical Action with
CA1.3C and place under Issue 1.
Critical Action
1.3C is: “Establish a working agreement
with Blue Mountains and Hawkesbury Councils and tourism organisations to
develop and market a region incorporating Penrith Valley, the Blue Mountains
and Hawkesbury City areas” (EDCMM).
Reword this as: Establish a
working agreement with Blue Mountains and Hawkesbury Councils and tourism
organisations to develop and market a region incorporating Penrith Valley, the
Blue Mountains and Hawkesbury City areas as an attractive place to live, work
and visit.
REASON:
The two Critical Actions are
effectively duplicates and can be dealt with as one. This also involves the
recommended change to Critical Action 4.2B as noted below.
Critical Action 4.2B Establish a program of regular meetings with Blacktown
City Council to identify and develop approaches to contemporary regional
issues, including infrastructure and service provision, employment creation and
housing development. (EPM)
PROPOSED CHANGE:
Reword this Critical Action as:
Establish a program of regular meetings with neighbouring Councils, in
particular Blacktown City Council, to identify and develop approaches to
contemporary regional issues, including infrastructure and service provision,
employment creation and housing development.
REASON:
To reflect the program requirements more effectively. As evidenced in
the present report, this program of relationships with neighbouring Councils is
underway and shaped by the sub-regional planning requirements of the
Metropolitan Strategy.
The City as a Social Place
Issue 7. Community Well Being and Social
Justice (DS)
Term Achievement 7.5 Council’s
planning approach to the provision of housing across the City addresses the
supply, choice, affordability, social and economic diversity and workplace
location needs of the community. (LPM)
With present Critical Actions 7.5A and
7.5B [unchanged]
PROPOSED CHANGE:
Transfer this Term Achievement to Issue 14. Managing Redevelopment as the first
Term Achievement in that Issue. No other change to content.
REASON: Further assessment of these Issues has
identified that the best placement of the present TA 7.5 is in Issue 14. That
Issue seeks to ensure that (TA 14.1) redevelopment of existing areas
contributes to safe, sustainable affordable and satisfying living environments
and cohesive communities, and (TA 14.2) new housing in established areas is
coordinated by comprehensive neighbourhood plans developed in partnership with the
local community and development industry.
The City as an Economy
Issue 20. Access to Quality Employment
Opportunities (DCS)
Issue 21. Partnering for Economic Growth (DCS)
Issue 22. Growing Economic Centres (DCS)
A number of changes are proposed across these Issues to clarify and
streamline the Economy Master Program. The areas affected are detailed below:
Term Achievement 20.2 Businesses intending to relocate from other parts of Sydney are
systematically identified and are being encouraged to locate to the City, or
nearby. (LEDPM)
Critical Action 20.2A Develop an
understanding of the criteria that are viewed as important to businesses under
pressure to relocate from other parts of Sydney. (LEDPM)
Term Achievement 21.2 Networks and clusters of
similar economic activity are developing in areas where the City and nearby
locations have a competitive advantage. (LEDPM)
Critical Action 21.2A Industry
sectors, well suited to the City's competitive advantages, are being encouraged
to locate to the City or nearby. (LEDPM)
Term Achievement 21.4 The means of attracting
economic contributors to the City have been incorporated into relevant programs.
(LEDPM)
Critical Action 21.4A An
assessment has been undertaken of what attracts economic contributors to the City
and the findings have been incorporated in relevant programs and policies.
(LEDPM)
Term Achievement 22.3 Council is working with the
Centre Associations to identify and cultivate market and development
opportunities. (LEDPM)
Critical Action 22.3A Consolidate a commercial niche, capable of attracting
and supporting a cluster of knowledge intensive business services in Penrith
City Centre in partnership with the Centre Associations. (LEDPM)
Critical Action 22.3A Identify and develop a demand driven commercial
opportunity that appeals to the broader regional and metropolitan marketplace
in partnership with the Centre Associations. (LEDPM)
PROPOSED CHANGES:
1) Replace these
Critical Actions with a single revised Term Achievement 20.2 and Critical
Action 20.2A as below:
TA20.2 Businesses
intending to relocate from other parts of Sydney are systematically identified
and programs are being developed and implemented to encourage businesses
to locate to the city or nearby.
CA20.2A: Undertake
an assessment of the key drivers of investment and business locational
factors and develop and implement
programs to attract businesses consistent with the City's regional status and
suited to its competitive advantage.
2)
Incorporate the present Term Achievement 22.3 (as above) as a new Critical
Action under the revised Term Achievement 20.2.
REASON: All of the Critical Actions are about
assessing a range of opportunities for investment and attracting
such investment to the City. The proliferation of requirements in different
areas of the program makes the requirements of Council’s strategy less clear and coherent. Careful assessment by the Director and the
relevant Cluster team has indicated no disadvantage to the Strategic Program
and a definite gain in understanding and clarity.
The relevant
Term Achievements are unchanged with the exception of the specific change to TA
22.3 proposed.
ATTACHMENTS
Date of Meeting: Monday
20 March 2006
Master Program: Leadership
and Organisation
Issue: Leadership
Report Title: 2005-2009
Strategic Program - Progress to December 2005
Attachments: Strategic Program Review
Report - December 2005
20 March 2006 |
|
Attachment 1 - Strategic Program
Review Report - December 2005 |
|
|
|
|
|
Strategic Plan 2005 – 2009
Penrith City – The Competitive
Edge
STRATEGIC PROGRAM PROGRESS
REPORT
AS AT 31 DECEMBER 2005
This
document is referred to in Council’s Business Paper
Policy
Review Committee 20 March 2006
Contents
Council’s Vision and the
Organisation’s Mission 2
Master Programs
§
THE CITY IN ITS BROADER CONTEXT
THE CITY AS A SOCIAL PLACE
THE CITY SUPPORTED BY INFRASTRUCTURE
LEADERSHIP AND ORGANISATION
Explanatory Notes
Responsibility Codes (as at 31 December 2005)
Council’s Vision…
Is one of a sustainable and
prosperous region with a harmony of urban and rural qualities with a strong
commitment to environmental protection and enhancement.
It would offer both the
cosmopolitan and cultural lifestyles of a mature city and the casual character
of a rural community.
The Organisation’s Mission…
Is to implement Council’s strategy
and program. It will do this through
skilled and responsive management, by valuing its staff, partnerships and
community involvement, by providing quality customer service and upholding
ethical standards and behaviour.
The City of Penrith
is linked with many other places through shared environmental, social and
economic systems and structures. The most apparent of these links are with
neighbouring and nearby cities across Sydney’s Greater West. The City of
Penrith is also integral to the Greater Sydney Region. It has developed
cultural and economic interests internationally.
The City will continue to
play a critical and energetic role in Greater Western Sydney’s endeavours to
obtain equity with more established parts of the Metropolitan Region. It will
do that by continued collaboration with the communities and organisations of
the Greater West.
The City has a vital
metropolitan role to play. Its population and housing supply will continue to
grow. It will gain importance as the principal centre of the outer
north-western edge of Sydney, particularly through the range and scope of
services it provides to that sub-region.
That will consolidate the
special associations it has with Blue Mountains and Hawkesbury and presents a
unique opportunity.
Hawkesbury has its
historical heritage, Blue Mountains its iconic international image and
cosmopolitan qualities and Penrith its central place urban role, location, its
river and the potential of Penrith Lakes. Taken together these qualities will
allow it to flourish as a creative, dynamic, diverse place, a magnetic place of
first choice within Sydney able to compete nationally and internationally.
The City has demonstrated
through the programs of Council and through the programs conducted by business,
and its learning institutions, both the merit and capacity for national and
international cultural and economic engagement. Council is determined to see
that national and international potential of the City more fully realised and
recognised.
Sydney’s rural lands are
increasingly being appreciated for their intrinsic value and the agricultural
productivity they bring to the growing metropolitan area. Penrith will work
with other communities on Sydney’s fringe to secure those rural qualities.
ISSUE 1: PENRITH
VALLEY’S RECOGNITION (DCS)
Longer
Term Goal: Penrith Valley is
recognised and distinguished nationally and internationally.
DIRECTOR COMMENTS ON THIS
ISSUE:
There are three term achievements that underpin the delivery of this
issue. They deal with the establishment
of an institution or event, Penrith Lakes and the effective marketing of
Penrith Valley as a recognised locality.
In relation to
the international event or institution, we have evolved two ideas for an
institution and one for an event and these are being actively pursued.
We have been working with the University of Western Sydney on both the
potential institutions with the objective of developing centres of excellence
in partnership with the University.
A National Water
Institute based in Penrith Valley is being explored, drawing on Penrith’s two
significant fresh-water assets – Nepean River and Penrith Lakes. The concept is that the institute would
become a national centre of excellence for research and technological
development in the use, reuse and conservation of water and the maintenance of
national river health. The site
proposed is Penrith Lakes. A report on
this initiative is being prepared for Council’s consideration.
The second
institute being explored is that of a Centre of Universal Design. This is an exciting concept which
contradicts the traditional approach of providing separate facilities depending
on the abilities of users. An
Australian foundation for universal design could provide a national base for
gathering and disseminating information on universal design, facilitating
education and training, research investigating innovative universal solutions
to the built environment and providing the development of important state and
national planning standards for a more accessible and sustainable future for
people of all ages and abilities.
Again, productive meetings have been held with the University on this
concept and will be the subject of a report to Council shortly.
The third
initiative being explored is a water-based event. We have recently been approached by a representative of the
Roland Corporation, which is interested in underwriting a solar boat challenge
on Penrith Lakes. The concept proposed
is similar to that of the solar car challenge across Australia, which attracts
international interest. This proposed
event embodies principles of sustainability which are fundamental to Council’s
Strategic Plan. It is proposed that the inaugural challenge be run in
conjunction with Council’s ‘Activate’, which is to be held in October. It is expected that from 2007 onwards, the solar boat challenge would be a
stand-alone event.
In relation to
Penrith Lakes, there are two substantial opportunities which will serve to
differentiate Penrith from other places in Metropolitan Sydney. Firstly, the parklands will provide
innovative recreation and entertainment opportunities through water and
land-based events. This, combined with
the high quality living environment, will add to the diversity of housing choice
in the City and potentially prestigious opportunities to attract a range of
business executives and other professionals to our City. The Lakes also provide an excellent
opportunity to demonstrate best practice and sustainable community development
and recreation. Substantial headway has
been made on the planning for the proposed urban area.
However, the same
cannot be said at this point in time about the parklands. This is of concern as the scheme is
scheduled for completion in 5 or 6 years and we do not have a confirmed
management arrangement for the parklands, sustainable funding solutions nor
agreed plans for realising the exciting opportunities that it presents. These are actions which we will need to remain
vigilant on over the next 6–12 months.
Penrith’s
recognition both locally and throughout Sydney as a vibrant, innovative and
attractive city is a longer-term objective.
Results of marketing research previously undertaken confirm that Penrith
was recognised as having these qualities when compared to other areas in
Western Sydney. That research also
showed that Penrith residents had a higher esteem about the City than residents
in other areas of Western Sydney.
Our City marketing initiatives continue to build on the positive
trends, including marketing of the Penrith Valley brand and targeting markets
within and outside the City. Penrith
Lakes has the potential to further distinguish the City. A number of programs are being developed
those partnerships, including a tourism partnership with the Penrith Valley
Economic Development Corporation (PVEDC).
TERM ACHIEVEMENT 1.1 (EDCMM) |
A
DECISION HAS BEEN SECURED FROM RELEVANT GROUPS TO DEVELOP A NOMINATED
INSTITUTION OR EVENT THAT HAS THE STATUS TO CAUSE PENRITH VALLEY TO BE WIDELY
RECOGNISED LOCALLY, THROUGHOUT THE STATE, NATIONALLY AND THROUGHOUT THE
WORLD. |
This will require an assessment of the types of
institution or event that would be able to deliver this level of recognition,
identifying partners who would work with Council in developing such an
institution or event and securing the commitment of those partners. |
CONTEXT/ISSUES:
This term
achievement relates to the longer-term goal that “Penrith Valley is recognised
and distinguished nationally and internationally”. This objective, by its
nature, is a longer-term initiative, however, it is anticipated that the
framework for moving towards this outcome will be established during the term
of the current Strategic Plan.
The institute or event
should build on Penrith Valley’s innate strengths and unique assets to make a
powerful statement about the City in a global context. The establishment of such a framework will
include a number of steps, as follows:
· Consultations
both within Council and externally to canvas potential themes for an
institution or event that might meet the longer-term goal.
· An initial
assessment of the ideas coming forward to determine which would best meet the
longer term goal and identification of potential partners who could potentially
contribute towards the development of the nominated institution or event.
At this point it
would be necessary to conduct a detailed feasibility analysis of the proposed
institution or event in conjunction with potential partners leading to the
development of a business plan confirming feasibility, investment required,
return on investment and benefits to the City including national and
international brand exposure. This will
require the assistance of an external business consultant with experience in
providing advice on such projects. The
business plan would need to be adopted by the identified partners and a
strategy prepared to implement the business plan for the selected institution
or event.
If an event was selected as
the most appropriate vehicle for achieving the longer term goal this would need
to be integrated with Council’s event strategy.
This term achievement is an
enhanced service in the 2005-09 Strategic Plan and is clearly seen by Council
as a high priority.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The development
of an institution or event that has the status to cause Penrith Valley to be
widely recognised locally, throughout the State, Nationally and throughout the
world is, by its nature, a longer-term initiative. The institute or event should relate broadly to the intent and
thrust of Council's Strategic Plan and should be unique to Penrith Valley
whilst building on the area's innate strengths and assets.
To this end,
consultations have been undertaken with various stakeholders to consider ideas for
the development of an appropriate institution or event. Three potential areas are currently being
explored with various stakeholders. The
first relates to the development of an Institute for Universal Design. The discipline of universal design is a holistic
approach to the design of products and facilities, which combines provision for
all people in the design. This is an
area of emerging research interest.
A Centre of
Universal Design currently exists in the United States of America at Bradford Woods
and is attached to the University of Indiana, however, no such centre or
institute exists in the Southern hemisphere.
Hence an opportunity exists for the development of such an institute in
Penrith, which would be quite unique in this part of the world. Such a centre could provide a national base
for gathering and disseminating information on universal design, facilitating
education and training, conducting research, investigating innovative universal
design solutions to the built environment and promoting the development of
improved state and national planning standards for a more accessible and
sustainable future for people of all ages and abilities.
Consultations
with representatives from the University of Western Sydney have been positive
and they are interested in exploring the concept. In the first instance work is occurring with university staff to
integrate principles of universal design into coursework for their Industrial
Design Course. Council staff are
working with university staff on practical universal design projects that would
have benefits within the City. The
development of such an institute has a close alignment to Council's Strategic
Program in that an outcome of the PLANS Study was to pursue the creation of an
institute of universal design.
The second
relates to the development of an institute relating to Water Management. Consultations have taken place with
representatives from the University of Western Sydney to discuss such a
concept. UWS are already involved in a
Cooperative Research Centre (CRC) for Irrigation Futures along with a number of
other universities and organisations.
This CRC is not based in Penrith.
The consultations have indicated that there may be interest in working
with Penrith City Council on some of their initiatives. CRC's are funded by the Federal Government
and participating organisations.
Investigations have revealed that there are already a number of other
CRC's and research organisations involved in water management, hence the
development of such an institute would not be unique to Penrith.
The final relates
to the development of a water themed event.
Penrith Valley's branding of "River, Mountains, Lakes" and its
tourism positioning around aquatic recreation and outdoor activities logically
points towards the development of a water themed event to build on our innate
strengths and assets. This of course is
reinforced by the presence of two water based international standard sporting
facilities in the City, the Penrith Whitewater Stadium and the International
Regatta Centre which are both located at Penrith Lakes. Penrith Lakes of course in its own right
will increasingly become a unique identifying feature of Penrith Valley as it
nears completion.
These facilities
already attract a range of significant State, National and International events
to the City predominantly in the sporting disciplines of rowing, canoeing and
slalom canoe. Council works with the
facility operators and event organisers to leverage city marketing advantage
through these events. Clearly an
important strategy is to continue to work with these groups to attract such
events to the City. There is also the
opportunity to build on these events to add another dimension to major events
coming to these facilities. Discussions
have occurred with the CEO of Australian Canoeing along these lines.
An exciting
proposal being progressed is the concept of a Solar Boat Challenge to be
conducted at Penrith Lakes. This is
being pursued in conjunction with the Roland Corporation, which is an
international technology company who has expressed an interest in underwriting
such an event. The vision for the event ultimately is of a similar scope to the
Solar Car Challenge across Australia, which gains significant international exposure. Such an event embodies principles of
sustainability and environmental protection, which are so prominent in
Council's Strategic Programme. In the
first instance it has been agreed to run this event as part of Council's
Activate Programme in 2006. In future
years there is the opportunity for the Solar Boat Challenge to anchor a broader
aquatic based festival around a sustainability theme.
*****
TERM ACHIEVEMENT 1.2 EPM |
PENRITH LAKES IS DEVELOPING
AND BEING USED IN A WAY THAT ESTABLISHES IT AS A PRINCIPAL SYDNEY
DESTINATION. |
This will involve working
with parties involved in planning the precinct to encourage provision of
facilities for a range of uses in the precinct master plan including a
regional centre for water based recreation, elite sports, entertainment,
events and enterprise. It will also
involve working with appropriate bodies to market Penrith Lakes for these
uses. |
CONTEXT/ISSUES:
This Term
Achievement recognises the substantial opportunity, which can be afforded by
the Penrith Lakes development to distinguish the site and Penrith in its
regional setting. That unique setting
is differentiated from other places in Penrith and is reinforced by the natural
attributes of the adjacent Nepean River corridor, Blue Mountains escarpment and
the Castlereagh rural landscape to the north.
Penrith Lakes has the potential to become a principal Sydney destination
with innovative recreation and entertainment opportunities, world renowned
water-based sporting venues and a high quality living environment which will
add to the diversity of housing choices in the City, in particular, a prestige
address attractive to business executives and other professionals. It will provide an excellent means of
establishing best practice in sustainable community development and
recreation.
The established
world class sporting venues and the unfolding of a new regional parkland
facility are significant community legacies, the planning for which needs to
provide for the realisation of the site’s potential.
The planning
process to date has indicated a range of opportunities including employment
based uses which would contribute to new job creation. However, the planning for the parklands has
not yet advanced where clarity on the range of new recreation opportunities has
been effectively canvassed. The State
Government also has not yet established a Management Authority who would have
control of the operation and management of the Lakes and the Parkland
activities.
It will be
imperative to determine sustainable financial models and related funding
mechanisms, as well as ongoing Government commitment to delivering and managing
the parkland facilities and Lakes over time.
The Department of
Planning has indicated that a Development Control Plan for the Parkland will be
advanced in 2005/06. It is not yet
clear whether this Development Control Plan will be the adopted blueprint for
the parkland or only extend to the concept masterplan stage. Delays in the formulation of the REP
amendment have occurred in relation to achieving a clear outcome in regard to
the flood impacts affecting the site and the need for a Regional Flood
Evacuation Strategy to be endorsed by Government. This issue is perhaps the most significant one to address prior
to the exhibition of the new REP and negotiations concluding in regard to the
developer’s financial arrangements.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term Achievement recognises the substantial opportunity, which can
be afforded by the Penrith Lakes development to distinguish the site and
Penrith in its regional setting. That
unique setting is differentiated from other places in Penrith and is reinforced
by the natural attributes of the adjacent Nepean River corridor, Blue Mountains
escarpment and the Castlereagh rural landscape to the north. Penrith Lakes has the potential to become a
principal Sydney destination with innovative recreation and entertainment
opportunities, world renowned water-based sporting venues and a high quality
living environment which will add to the diversity of housing choices in the
City, in particular, a prestige address attractive to business executives and
other professionals. It will provide an
excellent means of establishing best practice in sustainable community
development and recreation.
To this end, we
have actively engaged with the Department of Planning (DoP) and Penrith Lakes
Development Corporation (PLDC) on a range of issues emerging from the State
Government's development of a new Regional Environmental Plan for Penrith
Lakes. In particular, focus has been
given to flood evacuation and flood planning levels
for the area and ensuring that best practice water management arrangements are
pursued in the establishment of the lakes system. We have continued to pursue Government to establish a separate
Management Authority for the parklands to enable its effective operation and
the delivery of a wide range of recreational opportunities for the
community. We have also urged the
Government develop a sustainable funding strategy for the ongoing operation of
the parkland. The established world
class sporting venues and the unfolding of a new regional parkland facility are
significant community legacies, the planning for which needs to provide for the
realisation of the site’s potential.
We have urged DoP to pursue the preparation of a Development Control
Plan for the parklands, which will provide a platform for determining
recreation opportunities, activity precincts and development opportunities. DoP have developed a consultant brief and
sought expressions of interest to advance this process. A range of major community events are being
planned including the Commonwealth Games Queens Baton Relay and Australia Day
celebrations. The Whitewater and
Regatta Centres continue to be used for
national and international events.
*****
TERM ACHIEVEMENT 1.3 (EDCMM) |
PENRITH VALLEY IS
RECOGNISED LOCALLY AND THROUGHOUT SYDNEY AS VIBRANT, INNOVATIVE AND
ATTRACTIVE, DISTINGUISHED FROM THE REST OF SYDNEY, WITH A RANGE OF SERVICES
AND EXPERIENCES, COMPLEMENTED BY THOSE AVAILABLE IN THE BLUE MOUNTAINS AND
HAWKESBURY. |
Penrith Valley is
recognised locally and throughout Sydney as a vibrant, innovative place,
distinguished from the rest of Sydney by its attractive natural assets, the
economic, social and cultural services it provides to outer northwest Sydney
and which are complemented by Blue Mountains’ iconic world heritage
landscapes and parks and by the natural attraction and history of the
Hawkesbury region. |
CONTEXT/ISSUES:
This term achievement
relates to the longer-term goal that “Penrith Valley is recognised and
distinguished nationally and internationally”.
During the life of Council’s
previous strategic plan the branding “Penrith Valley – River; Mountains, Lakes”
was adopted for the region. A City
Marketing Program was developed to market and promote Penrith Valley to a wide
audience. This was rolled out in the
lead up to the Sydney 2000 Olympic Games to gain international exposure for
Penrith and its role in hosting the rowing, canoeing and slalom canoe programs
during the Olympics. A City Marketing
Program has continued to be implemented since that time.
It is intended
under this term achievement to maintain a City Marketing Program that presents
Penrith Valley as the attractive, vibrant centre of outer North-West Sydney,
designed to distinguish it from other parts of Sydney and attract visitors.
The City Marketing Program
will include:
§ Prepare,
implement and monitor annual City Marketing Plan.
§ Maintain, develop
and promote the Penrith Valley Web Site and position it as a major city
marketing tool.
§ Promote the City
Marketing Program and brand to local businesses and other partners.
§ Publish Penrith
Valley Views bi monthly newsletter.
§ Implement a
Sydney Image Improvement Program utilising the media.
§ Provide
assistance and advice for event organisers and manage the event sponsorship
program.
§ Publish and distribute
the Penrith Valley Experience visitors guide
§ Maintain a
Conference Market Development Network and promotional program, including
publication of a tour ideas kit and participation in families and promotions.
§ Source, maintain
and distribute statistical information on tourist visitation to Penrith Valley.
§ Promote the value
of the city marketing and Penrith Valley assets to local residents.
§ Maintain a farm
tourism program.
§ Maintain
marketing relationships and programs with the education and health sectors.
§ Co-ordinate a
special visits network to encourage international educational tours.
§ Respond to
approaches from advertising representatives.
§ Participate in
Economic Development Program marketing activities.
§ Encourage
investment in tourism and other marketable infrastructure.
§ Contribute to the
staging of the 2006 LGSA Tourism Conference in Penrith Valley.
A survey was
conducted in 2002-03 to gain an understanding of the perceptions of residents
of Greater Sydney to Penrith Valley as an innovative, vibrant and attractive
place. It is intended to repeat this
base survey in 2008-09 to determine how the City Marketing Program has
contributed to changes in perception that may have occurred over that time.
Penrith Valley’s assets as
the regional capital of outer North-Western Sydney, is complemented by the
iconic natural features of the Blue Mountains and the historical and natural
features of the Hawkesbury region.
To build on these
complementary assets it is intended to establish a working agreement with the
Councils and tourism organisations in these areas to cooperatively market those
assets to provide common benefits to all three regions.
This will involve agreeing
on an approach with representatives of the other regions and then together
developing a program of cooperative activities.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This is an
ambitious outcome and is a longer-term objective to realise wide recognition of
Penrith for these qualities. Market
research has been previously undertaken to determine if residents in Sydney
recognised Penrith as innovative, vibrant and attractive and distinguished from
the rest of Sydney. Results of the
research showed that Penrith was recognised as having these qualities when
compared to other areas in Western Sydney.
The research also showed that Penrith residents generally had higher
esteem about their City than residents of other areas in Western Sydney. City marketing programmes will continue to
build on the positive trends shown in the research. These programmes include greater exposure to the Penrith Valley
brand and associated promotional materials to target markets within and outside
the City. Of particular significance is
the development and promotion of the Penrith Valley Website as our major city
marketing tool and the continued publication and wide distribution of the
Penrith Valley Experience.
It is critical to
continue to work with others both inside and outside the City to achieve our
city marketing goals. To this end
networks continue to be developed and maintained, including the Penrith Valley
International Special Visits Network and the Conference Market Development
Network. Joint city marketing
programmes also continue to be developed and implemented with the Tourism Task
Group of the Penrith Valley Economic Development Corporation. It has also been recognised that there is potentially
significant mutual benefits in working closely with tourism and Local
Government interests in the Blue Mountains and Hawkesbury areas to undertake
joint initiatives to market this sub-region.
A series of positive consultations is progressing this initiative. It is intended towards the end of the
current Strategic Plan to conduct further market research to measure against
the previous benchmark research the progress towards this term achievement from
the ongoing rollout of City Marketing Programmes.
*****
ISSUE
2: PENRITH CITY CENTRE’S METROPOLITAN
ROLE (DCS)
Longer
Term Goal: Penrith
City Centre is the principal urban centre of Outer
Western Sydney as reflected in its economic, cultural and social diversity.
DIRECTOR COMMENTS ON THIS
ISSUE:
Penrith City
Centre has for some considerable period of time provided a range of higher
order economic, human and lifestyle services to outer Western Sydney and the
Central West. Penrith’s recognition
within the Metropolitan Strategy as a regional centre brings with it an
expectation that the State Government would have greater interest in its
planning and development. The extent to
which that will occur in the short term is a matter that we are seeking
clarification on, particularly in the context of our current city centre
planning.
Our draft
strategies for the city centre were endorsed by Council in December for public
exhibition which will occur in the first quarter of 2006. That strategy was underpinned by a
substantial consultation program and a suite of studies on economic, urban
design, access and parking, and social facility needs.
An extensive
consultation program is planned so that we broadly canvas community and
stakeholders views on the draft strategy.
The draft
strategy identified a preferred landuse pattern and suggested controls for
building form and density. It also
canvasses an approach to access and parking management, including the concept
of a satellite carpark and a shuttle bus service. It is hoped that this strategy will be finalised mid year and
that will facilitate the preparation of strategic plans and supporting
documentation.
A detailed
implementation plan will also be prepared guiding delivery of the strategy’s
recommendations including access and parking initiatives and public domain
enhancements.
Accessing the
city centre will be further addressed through the Integrated Transport and
Landuse Plan, which have now been funded by the Department of Planning. This Plan, which is being prepared as part
of the Penrith Urban Lands Strategy and Urban Work, is scheduled to commence in
the later part of 2006.
TERM ACHIEVEMENT 2.1 (LPM) |
PENRITH CITY CENTRE
PROVIDES A COMPREHENSIVE RANGE OF ECONOMIC AND HUMAN AND LIFESTYLE SERVICES
TO OUTER WESTERN SYDNEY AND CENTRAL WESTERN NEW SOUTH WALES. |
This will include retail,
commercial, professional and human services, including social support,
government programs and education; lifestyle services, including cultural,
sports programs, social amenities and entertainment all to a standard and
scope reflecting the Centre's regional role. |
CONTEXT/ISSUES:
This Term
Achievement recognises Penrith City Centre’s significant role in the long-term
sustainability of the City and the region, particularly the Centre’s role in
contributing to active and cohesive communities, and a strong economy.
The Penrith City Centre
Strategy will position it as the principal retail, commercial, cultural and
social centre of the City and a key focus within the region, and will identify
the Centre as a vibrant, attractive and safe place to live, learn, play, shop,
socialise, visit and conduct business.
The City also needs to be
able to successfully establish and market itself as a distinct (regional) place
by developing a strong and attractive positioning and image for the community,
and delivering the City’s products and services in an efficient accessible
way. The provision of regional centre
services and facilities must be pursued in this context of place building and
promoting a successful regional place.
Enhancing the City’s recreation and cultural facilities and
opportunities is also vital in building on Penrith’s unique character and
strengths.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The City Centres'
Review aims to ensure the vitality and viability of the City's two key Centres
over the next twenty to thirty years, by requiring exceptional design responses
for our buildings and public domain, recognising our unique cultural and social
values, creating accessible places for people and vehicles, and encouraging
economic investment.
The Term
Achievement will be realised over the next four years by completing the City
Centre Strategies, and then facilitating the implementation of the adopted
actions (including the incorporation of planning controls in the new Local
Plan). It will also rely on enhancing
the City’s recreation and cultural facilities and opportunities, and marketing
Penrith’s unique character and strengths.
In this regard, the Review has progressed with precinct planning
undertaken, draft planning controls prepared, and the 3D model developed. In December 2005, Council endorsed the
public exhibition of the draft Strategies for each of the Centres, and a
communication program to ensure broad community feedback (including specific
forums, presentations, discussions, and all information available on the City
Centres website) is being delivered.
The exhibition closes 31 March 2006.
Work has also continued with commencement of the redevelopment of the
Penrith Football Stadium, an expanded cultural program being implemented at the
JSPAC, and capital improvements planned for the Penrith Regional Gallery and
Lewers Bequest. Initial benchmarking of
the Centre's sporting, leisure, cultural and business facilities has been clarified
through the Metropolitan Strategy's identification of the 27 key centres
(including the 2 harbour cities, and Penrith as one of the 3 regional
cities). This provides a framework
against which we can pursue more detailed consideration of the Centre's
available services and facilities, and its market position. A greater understanding of Penrith's
identified regional role will also be gained through the current Sub Regional
Planning process.
*****
TERM ACHIEVEMENT 2.2 (DTAM) |
A COMPONENT OF A CITYWIDE
LAND USE AND TRANSPORT PLAN ADDRESSING PENRITH CITY CENTRE AND NEARBY PLACES
OF REGIONAL IMPORTANCE OR ATTRACTION IS BEING IMPLEMENTED. |
That component will
address means of accessing the City Centre by road, public transport the
particular needs of the various Penrith City Centre user groups and transit
links with the City Centre, Penrith Stadium/Panthers, Nepean Hospital, UWS
and Penrith Lakes. |
CONTEXT/ISSUES:
Penrith City Centre is
recognised as an emerging Regional City.
The establishment of core regional transit corridors, and regional
services that provide improved intra-regional access, will support access to
and within the City, including the Penrith City Centre. Such a network will provide greater accessibility
within the region, reduce growth in private vehicle mode-share and congestion,
promote an efficient and balanced transport system and provide the backbone for
concentration of employment and population growth.
This Term Achievement
recognises that a comprehensive response is needed to deliver a coordinated and
integrated transport system for the City, with components being implemented
through the development of release areas and the vitalisation of the City
Centres. That response will include
access to, from and within the City by road, pathway networks, and all forms of
public transport, and also involve local transit links with Penrith
Stadium/Panthers, Nepean Hospital, UWS and Penrith Lakes.
The Metropolitan Strategy has
provided a broad framework of land uses (including the identification of 27 key
Centres, and areas for employment, enterprise, residential development,
biodiversity protection, and rural activities) across the region. This broad Strategy is currently being
considered in greater detail through the Sub Regional Planning process, managed
by the Department of Planning, and is expected to be finalised by June
2006. The North-West Sub Region
includes Baulkham Hills, Blacktown, Hawkesbury, Blue Mountains, and Penrith
Council areas. These Councils were
successful in receiving $125,000 (as a group) from the Planning Reform Fund
Program to assist in resourcing the current Sub Regional planning exercise.
The
Sub Regional Planning Framework will focus on the capacity of each sub-region
to deliver the Department's identified employment and housing targets. One of the key elements under consideration
in this process will be transport, including existing systems and future
needs. That process, once concluded,
provides a sound basis on which Council can then undertake its more detailed
Integrated Transport and Land Use Study, which will focus on the transport
needs of the City's communities, businesses, workers and visitors. Given the timeframes for the Sub Regional
Planning process, it is now anticipated that the Integrated Transport and Land
Use Study will commence, concurrently with the Residential Review, from July
2006.
The
study will address train and bus services and interchanges as well as commuter
parking, bike and pedestrian networks, travel demand management and CBD/Town
Centre access. The road network component part of this study has already been
addressed in consultation with RTA with the development of the Penrith Arterial
Roads Study, which is dealt with in Term Achievement 24.2.
Concerns
raised, in the past, regarding the preparation of this Study, have centred on
Council's capacity to require the active participation and commitment of the
relevant state agencies to both the process and its outcomes. The Memorandum of Understanding (for the
funding) has identified this issue, and sought assistance from the Department
of Planning in ensuring appropriate state agency involvement. This is an issue that may need to be closely
monitored, and further assistance may be needed to ensure the process is
robust, and State Government commitment is achieved. Significant benefits could also be achieved by working with our
neighbouring Councils, particularly those in the North West Sub Region, to seek
agreed transport solutions.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council's
regional importance has been confirmed in the recently announced Metropolitan
Strategy. This Strategy has also
confirmed that Penrith will be subject to the development of an Integrated
Transport & Land Use Plan. Funding
for the development of this Plan has been provided as part of the funding
package for the Penrith Urban Lands Study & Strategy preparation. Work on the Urban Lands Study is
progressing, as is the studies for the City Centres Review. These studies will be an integral part in
the preparation of the Integrated Transport & Land Use Plan.
The timing of the
City Centres Review will see the studies for the Integrated Plan commencing
later this year. The timing will also
mean that implementation of any capital works resulting from the City Centres
study is not likely to occur until next year (subject to funding). A City Centres Strategy Implementation Group
has been formed to commence the development of an implementation plan and to
identify a program of city centre improvements that may be able to be commenced
in the short term. This will enable a
draft program of works to be identified for funding considerations.
A study is also progressing that is
addressing the service levels of bus services in the LGA and this will be used
as a background study for the development of the Integrated Transport &
Land Use Plan. Whilst Council is now
co-ordinating the citywide Integrated Transport & Land Use Plan, continued
pressure needs to be brought to the relevant agencies to ensure that they both
commit to participate in the development of the Plan and accept the outcomes of
the Plan.
*****
ISSUE 3: ST
MARYS’ REGIONAL ROLE (DCS)
Longer Term Goal: St Marys offers a broad range of district level retail and service businesses and a lively urban village lifestyle reflective of its historic traditions.
DIRECTOR COMMENTS ON THIS
ISSUE:
St. Marys Town Centre has a significant role as a district centre
supporting retail, commercial, government, professional, social and cultural
needs of the surrounding communities.
The City Centre
studies have confirmed that St. Marys is a successful urban village with its
own unique range of shopping and cultural experiences to complement the City’s
regional role.
The draft
strategy for St. Marys was endorsed for public exhibition and comment in
December. This is scheduled for the
first quarter of 2006. The strategy
provides substantial opportunity for additional residential development in and
around the centre and this will require quality design responses to buildings
and enhancements to the public domain.
Improved access
from the carparks to Queen Street was identified as a priority action, together
with facilitating improved links between the village shopping centre and the
Queen Street strip.
As with Penrith,
the St. Marys strategy, when endorsed, will facilitate the preparation of
appropriate statutory plans and supporting documents. An implementation plan will also be prepared, guiding the
delivery of the strategy’s recommendations including access and parking and
public domain enhancements.
St Marys'
district role will be complemented by the further development of the Penrith
Valley Cultural Precinct. Council has endorsed an extensive range of
improvements for the precinct and implementation has commenced.
St Marys will
also be included in the Integrated Transport and Landuse investigation which is
scheduled to commence later in 2006.
Recommendations from that study will need to be incorporated in the
implementation plan.
TERM ACHIEVEMENT 3.1 (DTAM) |
A COMPONENT OF A CITYWIDE
LAND USE AND TRANSPORT PLAN ADDRESSING ST MARYS TOWN CENTRE IS BEING
IMPLEMENTED. |
That component addresses
means of accessing the Centre by road and public transport, the needs of its
various user groups, links to nearby activity centres including the ADI
development and UWS, and the Centre’s role as a major transport focus. |
CONTEXT/ISSUES:
St Marys is recognised as a
major urban village and, as such, warrants specific inclusion in the Citywide
Integrated Transport and Land Use Plan.
The establishment of core regional transit corridors, and regional
services that provide improved intra-regional access, will support access to
and within the City, including St Marys Town Centre. Such a network will provide greater accessibility within the
region, reduce growth in private vehicle mode-share and congestion, promote an
efficient and balanced transport system and provide the backbone for
concentration of employment and population growth.
This Term
Achievement recognises that a comprehensive response is needed to deliver a
coordinated and integrated transport system for the City, with components being
implemented through the development of release areas and the vitalisation of
the City Centres. That response will
include access to, from and within the City by road, pathway networks, and all
forms of public transport, and also involve local transit links with nearby
activity centres including the ADI development and UWS, and the Centre’s role
as a major transport focus.
The
Metropolitan Strategy has provided a broad framework of land uses (including
the identification of 27 key Centres, and areas for employment, enterprise,
residential development, biodiversity protection, and rural activities) across
the region. This broad Strategy is
currently being considered in greater detail through the Sub Regional Planning
process, managed by the Department of Planning, which is expected to be
finalised by June 2006. The North-West
Sub Region includes Baulkham Hills, Blacktown, Hawkesbury, Blue Mountains, and
Penrith Council areas. These Councils
were successful in receiving $125,000 (as a group) from the Planning Reform
Fund Program to assist in resourcing the current Sub Regional planning
exercise.
The
Sub Regional Planning Framework will focus on the capacity of each sub-region
to deliver the Department's identified employment and housing targets. One of the key elements under consideration
in this process will be transport, including existing systems and future needs. That process, once concluded, provides a
sound basis on which Council can then undertake its more detailed Integrated
Transport and Land Use Study, which will focus on the transport needs of the
City's communities, businesses, workers and visitors. Given the timeframes for the Sub Regional Planning process, it is
now anticipated that the Integrated Transport and Land Use Study will commence,
concurrently with the Residential Review, from July 2006.
The
study will address train and bus services and interchanges as well as commuter
parking, bike and pedestrian networks, travel demand management and CBD/Town
Centre access. The road network component part of this study has already been
addressed in consultation with RTA with the development of the Penrith Arterial
Roads Study, which is dealt with in TA 24.2.
Concerns
raised, in the past, regarding the preparation of this Study, have centred on
Council's capacity to require the active participation and commitment of the
relevant state agencies to both the process and its outcomes. The Memorandum of Understanding (for the
funding) has identified this issue, and sought assistance from the Department
of Planning in ensuring appropriate state agency involvement. This is an issue that may need to be closely
monitored, and further assistance may be needed to ensure the process is
robust, and State Government commitment is achieved. Significant benefits could also be achieved by working with our
neighbouring Councils, particularly those in the North West Sub Region, to seek
agreed transport solutions.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council's
regional importance has been confirmed in the recently announced Metropolitan
Strategy. This Strategy has also
confirmed that Penrith will be subject to the development of an Integrated
Transport & Land Use Plan. Funding
for the development of this Plan has been provided as part of the funding
package for the Penrith Urban Lands Study & Strategy preparation. Work on the Urban Lands Study is
progressing, as are the studies for the City Centres Review. These studies will be an integral part in
the preparation of the Integrated Transport & Land Use Plan. The timing of the City Centres Review will
see the studies for the Integrated Plan commencing later this year. The timing will also mean that
implementation of any capital works resulting from the City Centres study is
not likely to occur until next year (subject to funding). A study is also progressing that is
addressing the service levels of bus services in the LGA and this will be used
as a background study for the development of the Integrated Transport &
Land Use Plan. Whilst Council is now
co-ordinating the City-wide Integrated Transport & Land Use Plan, continued
pressure needs to be brought to the relevant agencies to ensure that they both
commit to participate in the development of the Plan and accept the outcomes of
the Plan.
*****
TERM ACHIEVEMENT 3.2 (FOM) |
THE PENRITH VALLEY CULTURAL
PRECINCT IS COMPLETED AND CONTRIBUTING TO A VIBRANT URBAN VILLAGE LIFESTYLE
IN ST MARYS. |
This will be
achieved by implementing Council’s vision and master plan for the Precinct
and developing sustainable programs for the local community and beyond. |
CONTEXT/ISSUES:
The Penrith Valley
Cultural Precinct is that area of land situated at St Marys bounded by the
Great Western Highway, Mamre Road, Swanston and Collins Streets. In 1996 Council engaged specialists to
assist Council in its investigations of land use opportunities for this area of
Council-owned land. The idea of a
cultural precinct was drawn from those investigations. Further specialist work was done in 2000
regarding the development of a Precinct Masterplan. Council subsequently adopted a Masterplan, which will guide the
future development of this ‘cultural precinct’. This large area of Council-owned land forms part of the St Marys
Town Centre and is situated at its south-eastern corner.
The development of the
Penrith Valley Cultural Precinct is a major project and has an implementation
program over an extended period but its completion could be realistically
achieved within the terms of this strategic program.
The current masterplan
includes the following vision statement:
“An inviting
community arts and cultural centre that meets the diverse needs of Penrith’s
and St Marys’ many cultural and community groups in a comfortable, safe and
attractive setting through the flexible use and management of a range of
community spaces and public spaces, coordinated and shared in a manner that
promotes social interaction, mutual respect and community strength, health and
well-being.”
An implementation
strategy has been developed but its successful completion will depend upon
resources. When completed the precinct
will be an active and vibrant community arts and cultural centre occupied by
many community-based arts/cultural groups applying a range of activities and
programs.
The St Marys Town
Centre has been the subject of a comprehensive planning review out of which
will emerge a range of programs and strategies that will ensure the economic,
social and environmental sustainability of the Town Centre. The Penrith Valley Cultural Precinct has a
part to play in the success of that major strategy and how the Precinct ‘unfolds’
should be guided by the Town Centre strategies.
This Term
Achievement will be achieved by implementing Council’s vision and masterplan
for the Precinct and developing sustainable programs for the local community
and beyond.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The development
of this cultural precinct, as a major Council project, was first envisaged as
an element of Council's previous strategic program. During that period Council lead the development and adoption of a
precinct masterplan and implementation of the initial stage. Some slippage has occurred. An extensive program of further capital
improvements and other initiatives for the precinct has been endorsed by
Council and its implementation commenced.
Investigations have commenced on the future precinct management structure
and funding strategies. A comprehensive
planning review of St Marys Town Centre has been completed and strategies will
be developed from that review that will have an influence on how the cultural
precinct will 'take shape' and programs that will add value to the St Marys
urban village.
TERM ACHIEVEMENT 3.3 (LPM) |
ST MARYS OFFERS A RANGE OF
DISTRICT LEVEL RETAIL AND SERVICE BUSINESSES TO ITS SURROUNDING LOCALITIES. |
This includes retail,
commercial, government, professional and social and entertainment services,
all to a standard and scope reflecting the Centre’s important role. |
CONTEXT/ISSUES:
This Term Achievement
recognises St Marys Town Centre’s significant role in the long-term
sustainability of the City, particularly as a District Centre that contributes
to active and cohesive communities, and a strong economy.
The St Marys Town Centre
Strategy will position it as the principal district centre of the City, and
will identify it as a vibrant, attractive and safe place to live, learn, play,
shop, socialise, visit and conduct business.
The City also needs to be able to successfully establish and market
itself as a distinct place by developing a strong and attractive positioning
and image for the community, and delivering the City’s products and services in
an efficient accessible way.
This Term
Achievement is also intrinsically linked with the City’s ability to
successfully establish and market itself as a distinct place by developing a
strong and attractive positioning and image for the community and delivering
the city’s products and services in an efficient accessible way. A marketing campaign that promotes St Marys
attractiveness and benefits to ensure that potential users are fully aware of
the advantages is critical to achieving this status amongst place buyers.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The City Centres' Review aims to ensure the
vitality and viability of the City's two key Centres over the next twenty to
thirty years, by requiring exceptional design responses for our buildings and
public domain, recognising our unique cultural and social values, creating
accessible places for people and vehicles, and encouraging economic
investment. The St Marys Town Centre
Strategy will position it as the principal District Centre of the City, and
will identify it as a vibrant, attractive and safe place to live, learn, play,
shop, socialise, visit and conduct business.
The City also needs to be able to successfully establish and market
itself as a distinct place by developing a strong and attractive positioning
and image for the community, and delivering the City’s products and services in
an efficient accessible way.
The Term
Achievement will be realised over the next four years by completing the City
Centre Strategies, and then facilitating the implementation of the adopted
actions (including the incorporation of planning controls in the new Local
Plan). It will also rely on enhancing
the Town Centre’s cultural facilities and opportunities, and marketing
Penrith’s unique character and strengths.
The Review has progressed, with precinct planning undertaken, draft
planning controls prepared, and the 3D model developed. In December 2005, Council endorsed the
public exhibition of the draft Strategies for each of the Centres, and a
communication program to ensure broad community feedback (including specific
forums, presentations, discussions, and all information available on the City
Centres website) is being delivered.
The exhibition closes 31 March 2006.
The Metropolitan Strategy's identification of the 27 key centres (which
does not include the St Marys Town Centre) provides a framework against which
we can pursue more detailed consideration of the Centre's available services
and facilities, and its market position.
A greater understanding of St Mary's role will also be gained through
the current Sub Regional Planning process.
*****
ISSUE 4: REGIONAL
GROWTH (DCS)
Longer Term
Goal: The
City positively influences policy and decisions on metropolitan and regional growth and development
that affects it.
DIRECTOR COMMENTS ON THIS
ISSUE:
The metropolitan
strategy has confirmed Penrith’s vital role in Sydney’s Greater West. In deed, that strategy proposes that Greater
Western Sydney accommodate a substantial share of Sydney’s future housing and
employment requirements.
Penrith will be
called upon to play its role in responding to the region’s growth needs and
this will have substantial implications for our City. This further compels the development of effective communication
strategies that advise our community about the consequences of our regional
role. To this end, we have embarked on a program of consultation with key city
partners with further meetings scheduled for the New Year.
In order to
effectively respond to the challenges canvassed by the Metropolitan Strategy,
we will need to work closely with our neighbouring Councils, WSROC, Greater
Western Sydney Economic Development Board and GROW. We have been active in establishing a partnership with the Department
of Planning, WSROC and the North West Councils on our approach to the
preparation of a Sub Regional Plan.
Work on that Plan is due to commence early in 2006 with anticipated
completion around the middle of the year.
Our participation
in the Sub Regional Plan will enable us to effectively argue for the delivery
of agreed services and facilities consistent with our growth requirements. This is a matter that we have been pursuing
with other Councils in the Sub Region so that we are able to take a common
voice to the Department of Planning in this process.
We have also, in
company with WSROC, been promoting the need for a Regional Employment
Strategy. Given the vast number of jobs
required across Western Sydney, both within and outside the new sectors, we
believe it imperative that some form of strategy be agreed between all levels
of government on how those employment outcomes are to be achieved.
The Mayor has
initiated meetings with the Mayors and senior staff of adjoining Councils for
the purpose of outlining some of the principal objectives of our Strategic Plan
that have relevance to our neighbours.
These meetings are scheduled for the New Year.
As reported
elsewhere, the Department has funded an Integrated Transport and Landuse Plan
for our City. This Plan, which is
scheduled for commencement in 2006, will provide a blueprint for the City’s
transport needs and will require commitment of various government agencies for
its delivery.
We continue to
meet regularly with the local State Members of Parliament in order to convey
Council’s preferred positions and priorities for which the State Government is
responsible. The last such meeting
occurred just prior to Christmas.
We have also met
with the local Federal Members and the Member for Macarthur, the Federal
Government spokesperson for Western Sydney, to appraise them of those matters
within our Strategic Plan of relevance to the Federal Government
TERM ACHIEVEMENT 4.1 (EPM) |
THE COMMUNITY AND CITY ORGANISATIONS ARE INFORMED
ON ISSUES RELEVANT TO METROPOLITAN GROWTH AND DEVELOPMENT THAT AFFECT THE
CITY AND THE REASONS FOR COUNCIL’S RESPONSE TO THEM. |
That will be achieved
through engaging the community in discussions and developing responses to
those issues, dialogue with individual City organisations around particular
issues and development of joint City partnership forums and community forums. |
CONTEXT/ISSUES:
The City has a
vital metropolitan role to play and incorporates a range of facilities of
regional importance including JSPAC, Nepean Hospital, UWS, WSI TAFE, Lewers
Gallery, SIRC and the White Water facility.
The significant role Penrith is assuming in the context of Western
Sydney and our surrounding catchment is being recognized by Government and is
likely to assume Regional City status in its impending Metropolitan
Strategy. The role Penrith and St Marys
centres will play is also of increasing importance as the hubs of commercial,
recreation and cultural activities for our community.
Penrith continues
to grow and will change over the next 15 to 20 years to a more cosmopolitan
city, one which is increasingly more vibrant and active. From recent research, it is apparent that
some two-thirds of population growth over the next 20 or so years will be
generated by natural population increase.
New urban communities will emerge and will be deliver a wide range of
housing types, some different and more dense in form than currently
experienced. Our population profile is
changing with households becoming smaller and a growing number of one and two
people requiring housing. Although a
large group within our community remains families with children, there is an
increasing proportion of older people requiring special consideration, tailored
housing requirements and social facilities.
The reasons for
Penrith’s growth and gaining a greater acceptance from the community to the
changes that new growth will bring will be a focus in this TA. This dictates the need for a clear
Communication Strategy, which will provide a principal means of explaining the
influences that are shaping the future of our City. This will also engage Council in exploring the implications of
regional development and the external changes which will influence the City
over time, particularly the new major urban growth centre proposals adjacent
our boundaries being advanced by State Government.
The growth of the
City needs to be sensitively managed, given that this will create additional
infrastructure demands beyond which exists and in some cases infrastructure
such as transport networks will extend beyond the LGA to neighbouring
areas. Over the long-term, it is
desirable that the City positively influences policy and decisions on
metropolitan and regional growth and development that affects it.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Our community and
City organisations need to be kept abreast of these changes and the increasing
regional role for our City. We actively
participated in community forums relating to the Government's proposals for the
North West Growth Centre and made submissions to DoP on behalf of
residents. We are also planning a
series of forums with business groups early next year to discuss the
Metropolitan Strategy implications for Penrith and the emerging role for the
Penrith City Centre. Information is
being included in Council's community newsletter on urban growth issues in the
City, including the progress being made with major release areas and the City's
emerging regional role. Preparation of
the City's new Integrated Local Plan has commenced, with the initial focus
being on the development of planning responses for the City's rural areas, city
centres and employment areas.
*****
TERM ACHIEVEMENT 4.2 (EPM) |
JOINT RESPONSES AND INITIATIVES ARE REGULARLY DEVELOPED WITH
NEIGHBOURING COUNCILS AND REGIONAL ORGANISATIONS AROUND METROPOLITAN AND
REGIONAL ISSUES. |
These include initiatives
to consolidate its competitive advantage of the outer western sub-region,
co-ordinating approaches to the provision of growth generated infrastructure
and services and collaborating with these groups to secure mutually
beneficial outcomes. |
CONTEXT/ISSUES:
Penrith will continue to
gain importance as the principal centre for outer north-western Sydney,
particularly through the range and scope of services it provides to that
sub-region.
This Term Achievement will
see us continuing to establish a structured approach to regular dialogue with
Blacktown Council around regional issues of mutual interest, that agenda will
incorporate opportunities for greater accessibility to employment locations,
regional facilities and a range of cross-boundary issues including road and
transport initiatives, recreation and conservation matters relating to the
major creek corridors.
New associations with Blue
Mountains and Hawkesbury Councils are required to be developed to explore
opportunities which promote the sub-region as an attractive and vibrant place
to live and visit. Themes that will be
incorporated in that agenda are identifying the relative strengths of each LGA
and the synergies between commercial, cultural and recreation opportunities
afforded by an emerging regional city, the significant natural values and
recreation environment of the World Heritage area, the diversity in living
opportunities in the mountains, and the historic and agricultural values of the
Hawkesbury.
Our significant engagement
with WSROC and other peak regional organisations such as the GWSEDB and GROW
will continue and will establish new initiatives and joint responses on issues
of regional significance, including those identified in WSROC’s FutureWest
which includes the MACROC Councils’ area.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Discussions with
Blacktown Council are being arranged for early next year.
New associations with Blue Mountains and
Hawkesbury Councils are required to be developed to explore opportunities,
which promote the sub-region as an attractive and vibrant place to live and
visit. A series of positive consultants
have occurred with tourism organisations and Council representatives in both
areas. Further discussions are being
arranged which will explore themes such as the relative strengths of each LGA
and the synergies between commercial, cultural and recreation opportunities
afforded by an emerging regional city, the significant natural values and
recreation environment of the World Heritage area, the diversity in living
opportunities in the mountains, and the historic and agricultural values of the
Hawkesbury.
Our significant
engagement with WSROC and other peak regional organisations such as the GWSEDB
and GROW has continued and is focusing on new initiatives and joint responses
on issues of regional significance, including those identified in WSROC’s
FutureWest such as Regional Employment Strategy, joint submissions to
Government on its Metropolitan Strategy initiatives and engagement with WSROC
and the other Councils in the North West sub-region in the development of a new
sub-regional plan with DoP.
*****
TERM ACHIEVEMENT 4.3 (EPM) |
AGREEMENT HAS BEEN REACHED
WITH STATE GOVERNMENT AGENCIES TO PROVIDE MUTUALLY AGREED SERVICES AND
FACILITIES TO THE CITY CONSISTENT WITH ITS GROWING REQUIREMENTS. |
The agreement will address
services and facilities needed to allow the city to perform its metropolitan
and regional roles successfully, including civil infrastructure, roads and
transport infrastructure, public transport programs, health, education and
social services, cultural and recreational services, economic programs
(including local government agency presence) and environmental management
programs. |
CONTEXT/ISSUES:
Whilst ambitious,
this term achievement recognises the importance of ensuring that there is
adequate infrastructure delivered to our City to meet its urban growth
requirements. Implicit in this is the
recognition that Council’s continuing support for new urban growth to occur
within the City must be predicated on reaching appropriate agreements with
Government over infrastructure delivery, both ‘hard and soft’.
There will be a need to
develop a definitive specification of the principal services and facilities
required to meet the growth requirements of the City. Initially that should focus on the positive responses we are
working on which reflect the emerging regional City role of Penrith, including
planning for the continued growth and vitality of the City’s centres, planning
for new urban communities and the identification and planning of growth
corridors consistent with the emerging principles form the Government’s
Metropolitan Strategy.
This is particularly
critical given the Government’s recognition of Penrith in its wider regional
context will require the direction of Government services, infrastructure and
support for private sector, as well as public, initiatives to promote and
reinforce the role our City will play in the wider sub-region which we
serve. This categorisation lends weight
to our previous arguments for improved infrastructure delivery to Penrith and
is important in recognising the implications and impacts which will be created
by the Government’s North West and South West Growth Centre proposals which
abut our City.
Key services and facilities
infrastructure which supports the emerging regional context of Penrith will
also need to be identified in the forthcoming North West Sub-Region Planning
Strategy process in concert with neighbouring councils and the Department of
Planning. A strategy for its ongoing
effective roll-out will be a pivotal requirement for agreements with
Government.
Council has not been successful
to date in having the State Government to recognise the fundamental importance
of transport infrastructure in Penrith such as new arterial links, bus service
and other public transport improvements, and road upgrades. This would need to continue to be a focus,
however it is recognised that this aspect is also canvassed under Issue 24
dealing with accessible public transport and regional road network.
Whilst there is some
incentive now being picked up by the private sector through developer contributions
at both the local and regional level, it will be necessary to continue to lobby
the Government to acknowledge its fair share.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Our initial focus
has been on identifying the emerging infrastructure requirements to support
Penrith's Regional City role, including planning for the continued growth and
vitality of the City’s centres, planning for new urban communities and the
identification and planning of growth corridors consistent with the emerging principles
form the Government’s Metropolitan Strategy.
Council has made
submissions to the Government's Metropolitan Strategy and the proposed North
West and South West Growth Centre plans.
These have, amongst other things, made special reference to the lack of
a clearly articulated and funded infrastructure strategy, which effectively
links Penrith to surrounding new urban places and enhances accessibility to
jobs for our community. This is
particularly critical given the Government’s recognition of Penrith in its
wider regional context will require the direction of Government services,
infrastructure and support for private sector, as well as public, initiatives
to promote and reinforce the role our City will play in the wider sub-region
which we serve.
The need for an
effective Government response to the delivery of key services and facilities
infrastructure which supports the emerging regional context of Penrith has been
raised to Local Members and further submissions to relevant Ministers will be
required pressing for funding commitments.
Emphasis has been given to major transport facilities such as the UWS
Railway Station, Werrington Arterial, the EPEA/M7 road link, and ensuring
effective service delivery for the established areas and responding to urban
consolidation pressures.
*****
TERM ACHIEVEMENT 4.4 (EPM)
|
COUNCIL’S PREFERRED
POSITIONS AND PRIORITIES RELEVANT TO WESTERN SYDNEY GROWTH AND DEVELOPMENT
ARE CONSIDERED BY GOVERNMENTS, REGIONAL FORUMS AND REGIONAL ORGANISATIONS IN
THEIR OWN POLICY DEVELOPMENT. |
This will be achieved
through a structured program of advocacy and dialogue with elected
representatives, government agencies, WSROC and other regional associations. |
CONTEXT/ISSUES:
The emphasis in
this Term Achievement is for Council to influence Government and regional
organisations’ policy development concerning Western Sydney’s future
growth. That will require Council
developing more regular dialogue with Government, both State and Federal, key
regional partners and infrastructure providers who make decisions with regard
to the region’s development.
As outlined at Term
Achievement 4.3, emphasis is required to be given in the continued lobbying of
the State Government to the infrastructure needs required to support Penrith’s
emerging Regional City role. However,
we should also consider opportunities which can be pursued following the
publication of the Federal Senate Committee’s ‘Sustainable Cities’ Report to
enliven a wider urban regional response at the Commonwealth level and promote
opportunities where the Government has some influence, such as the future of
Commonwealth owned lands, economic development, university research funding and
major road infrastructure. This would
see us move to a stronger engagement with Local and other relevant Federal
Members.
This Term Achievement will
also see us participating at the sub-regional planning level with neighbouring
Councils and the Department of Planning to develop specific and targeted
responses to the Government’s Metropolitan Strategy directions which will be
implemented at the local level.
Council will need to
continue to respond to State Government Metropolitan Strategy and related
regional planning policies as they are developed and emerge.
There is also the need to
ensure that we communicate with peak regional organisations and Government
agencies, the development industry and the Penrith Valley business community,
and new, regular forums will be required to be established to undertake this
dialogue.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The emphasis in
this Term Achievement is for Council to influence Government and regional
organisations’ policy development concerning Western Sydney’s future
growth. That will require Council
developing more regular dialogue with Government, both State and Federal, key
regional partners and infrastructure providers who make decisions with regard
to the region’s development.
To this end,
lobbying has continued on a range of infrastructure needs including discussions
with Local members which addressed a broad range of issues including
established areas, urban consolidation implications and transport
infrastructure delivery. Following the
release of the Metropolitan Strategy, we have been engaged with WSROC, DoP and
the Councils comprised in the North West sub-region to establish a
collaborative approach to developing the North West sub-regional strategy. Regular communication has commenced with the
Penrith Valley business community and will be further strengthened as part of
Council's broader partnership program, which is being finalised.
*****
ISSUE 5: ACCESS
TO AND EQUITY OF SERVICES (DCS)
Longer Term
Goal: Access
to services in the City is equivalent to or better than that in other areas of Sydney.
DIRECTOR COMMENTS ON THIS
ISSUE:
Penrith’s role as
a regional City under the Metropolitan Strategy serves to confirm the range and
scope of services it needs to provide not only to service the City of Penrith
but to the wider sub-region. Implicit in
this is that our residents' access to social services is equivalent or better
than that in other areas of Sydney.
This necessitates a much closer understanding of our social profile, as
well as benchmarking with other relevant areas the appropriate levels of social
and other services.
The work
completed last year by the Urban Frontiers Program of the University of Western
Sydney has enabled us to establish the likely population and social profile of
existing and future residents. This,
together with the community profile currently being finalised by Id Forecasting
will provide Council with enhanced understanding of the socio-economic
characteristics of the City’s population.
Analysis of SEIFA
(Socio-Economic Indicators for Advantage and Disadvantage) and health
indicators has enabled Council to identify Cranebrook and North St Marys as
high priority areas for neighbourhood renewal.
Participation in social planning partnerships with key government and
community partners confirmed that these were appropriate areas and have
resulted in additional State Government funding for enhanced social service
provision.
Recent work
undertaken by Elton Consulting on the neighbourhood renewal planning and review
process has confirmed that to achieve sustainable outcomes for local
communities, renewal programs are required to be in place for between 5–20
years. A presentation on the
neighbourhood renewal planning and review process will be made to Council in
the New Year.
Some research and
consultation with service providers has been undertaken on the City’s social
needs. Existing service levels, as well
as unmet needs, have not been benchmarked with other Local Government areas at
this time. In this regard, we are
exploring a collaborative approach to identifying the unmet social needs of the
City to enable us to pursue appropriate government responses to meeting those
needs. This currently occurs to some
extent through Council’s meetings with the local State Members and can be complemented
by a more targeted advocacy with relevant Ministers as required.
TERM ACHIEVEMENT 5.1 (CDM) |
A PLAN AS A COMPONENT OF
COUNCIL’S OVERARCHING AGREEMENT WITH GOVERNMENT IS IN PLACE SUPPORTING
COUNCIL’S CLAIM FOR SERVICE EQUITY FOR THE CITY. |
That will establish
benchmarks for acceptable levels of equity for residents around social and
health characteristics, acceptable levels of provision of nominated services
and priorities for Government action and/or Council’s advocacy including
issues such as health, education, community services and public transport. |
CONTEXT/ISSUES:
Penrith will gain importance
as the principal centre of Sydney’s outer north-west, particularly through the
range and scope of services it provides to not only its community but to that
wider sub-region. Implicit in this is
ensuring that our residents’ access to social services is equivalent to or
better than that in other areas of Sydney.
This will require us to have a much closer understanding of what our
future population and social profile will be, as well as benchmarking with
other relevant areas the appropriate levels of social and other services.
The first step is to
establish the likely population and social profile of existing and future
residents. That work is largely
complete with the Randolph work on Penrith Urban Growth Study. Together with the community profile
currently being finalized by Id Forecasting, Council will have an enhanced
understanding of the socio-economic characteristics of the City’s population.
The need for a Community Atlas was identified as assisting in the visual
representation of socio-economic disadvantage on a small area level.
Some research and
consultation with service providers has been undertaken on the City’s social
needs. However, these social needs
principally relate to unmet service demand or gaps in service provision that
are principally funded by government and delivered by local non-government
agencies.
Some of the identified needs
are population target group based (eg. young people) or suburb/place based. An
example of Council’s response to the former is the Youth Needs Audit, which was
adopted by Council in 2002. The actions in the Audit were developed from
extensive consultations with young people, service providers, as well as the
available socio-economic data. Suburb/place based responses have used similar
tools, including health indicators and the SEIFA index, to ensure that
Council’s actions (eg. Neighbourhood Renewal) are targeted and address issues
of equity across the City. Further detail on health inequities is provided in
Term Achievement 7.2. Thus there is
some overlap in this Term Achievement with TAs 7.1, 7.2 and 13.1.
However existing service
levels as well as the unmet needs have not been benchmarked with other LGAs.
Benchmarking of human
services, however, is a complex issue, particularly given data access
difficulties and the way Government agencies roll out programs across the
regions. Obtaining social service data
at an LGA level may not be possible.
However, a comparative analysis of the extent to which other comparable
local government areas in Western Sydney are equipped to deliver needed
services to their communities would be required. An added complication is the difficulty in benchmarking social and
other services that are delivered at a suburban or subregional (more than one
LGA) level. Access to data to support
benchmarking is unlikely to be available.
Another challenge is that in
the provision of recurrent allocations to fund services through a targeted
program, government social service departments invariably respond to emerging
social issues through a broad program response (e.g. youth services, children’s
early intervention services, Aboriginal services) as well as on a broad
catchment basis. Sydney West Area
Health and the MetWest Region of the NSW Department of Community Services cover
multiple LGAs – recurrent program resources, if they have sufficient priority,
are delivered across a region. It is
the region’s needs that are the focus, not one LGA.
An alternative approach is
to identify the priority unmet social and related needs of the City and
advocate for positive government responses to the needs identified and
prioritised. This currently occurs
through Council’s meeting with State Members and can be complemented with more
targeted advocacy of relevant Ministers as required.
Given the focus under Issue
4: Regional Growth, particularly Term Achievements 4.2 and 4.3, for provision
of regional infrastructure, services and facilities needed to allow our City to
perform its metropolitan and regional roles, there is the opportunity to
differentiate Term Achievement 5.1 to apply principally to establishing and
advocating for equity of social services for our City. This connects closely with Issue 7,
Community Well Being and Social Justice, particularly Term Achievements 7.1 and
7.2.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The final Stage 2
Urban Growth Management Study for Penrith City was presented to Council in
August 2005. The findings establish the likely population and social profile of
the future community in Penrith given the projected dwelling and population
growth proposed for Penrith in the Department of Planning Metropolitan
Strategy.
The findings will
also inform the review of Council's Residential Strategy and Council's
responses to the social and related impacts of growth, redevelopment and
change.
Preparations with
id profile are also well advanced to accommodate the timely inclusion and
consideration of 2006 Census data in Council's assessment of service equity.
A meeting was
held with State members in December to advocate to Government on the impacts of
urban consolidation on established areas.
*****
ISSUE 6: SUSTAINABLE
RURAL LANDS (DCP)
Longer Term
Goal: Council’s
strategy to achieve sustainable, productive use
of rural lands and preservation of the City’s rural qualities is secured.
DIRECTOR COMMENTS ON THIS
ISSUE:
The State Government has directed Councils to prepare a single Local
Plan. The conversion of Council’s adopted Rural Land Strategy into a Landuse
Plan was delayed because the Local Plan framework was not yet defined. The rural land planning controls have now
been scheduled for inclusion into the first instalment of the City’s Local
Plan. This will be completed by July 2007.
Implementation of other rural strategy actions occurred. These included the sewering of some
villages, monitoring of on-site sewerage systems, exhibition of the Open Space
Action Plan and the development of a natural area reserves network across the
City.
There are tremendous challenges to rural lands across metropolitan
Sydney. They will not be adequately
confronted if approached at an individual Council level. For this reason, we have been active in
commenting on the Metropolitan Strategy and will do likewise with the
Sub-Regional Planning processes that are now commencing. We have advocated for a co-ordinated
strategic regional planning approach for rural lands that recognises and
preserves the value of these lands.
Council also participated with other Councils in the study of rural
lands. This identified their value, as
well as the issues and trends facing agriculture on the Metropolitan
fringe. The report’s findings have been
delivered to the Department of Planning (DoP) for inclusion in the Sub Region
Plans.
Work continued on the Penrith City Landscape Strategy. This will be completed for adoption in July
of this year. Community involvement and
education on the landscape and natural values of the rural areas are a central
theme of the strategy.
The Farmers’ Market commenced providing marketing and sales opportunity
for rural producers. Regrettably, the
markets are not attracting sufficient patronage to sustain them in the long
term. Strategies to correct this are
being considered.
Funding submissions were made for a number of activities to support
agricultural businesses. An
agricultural business survey was also conducted identifying issues that will
affect the performance and viability of agricultural businesses in the
City. Some of the issues included
compliance cots, succession planning, land affordability, lack of control of
supply chains and problems faced by market gardeners from NESB. Responses are being developed.
TERM ACHIEVEMENT 6.1 (LPM) |
COUNCIL’S ADOPTED STRATEGY IS BEING IMPLEMENTED
AS THE BASIS FOR FUTURE RURAL LAND USE DECISIONS. |
A Rural Lands Strategy has
been implemented through a new rural Local Environment Plan and related
policy responses providing the basis for future rural land use decisions.
Effectively communicating the intent of the new plans will be the next
challenge in order to gain broad community support for the Strategy’s intent. |
CONTEXT/ISSUES:
Penrith City
contains extensive rural lands, which have significant agricultural,
environmental and landscape values.
Council has been under increasing pressure to identify and promote
appropriate land-uses in the rural areas and thus give a level of certainty for
the residents about the future of their area.
In order to preserve the distinctive character and environmental values
of Penrith’s rural areas, careful management is essential.
The Rural Lands Study, which took two years, involved
a comprehensive assessment of the City’s rural areas and rural issues, sought
extensive community input and gained the support of relevant agencies. The outcomes of the Rural Lands Study formed
the basis for the Rural Lands Strategy, which has identified the planning
directions for Penrith’s rural lands for the next 15 or so years. Council adopted the Rural Lands Strategy on
29 September 2003. In endorsing the
Rural Lands Strategy, Council also reinforced its strong commitment to the
conservation of the City’s rural lands, and limits to rural subdivision.
The adoption of the Rural Lands Strategy highlights a
significant step in the achievement of one of Council’s major planning
responses. The Strategy also outlines
other key actions to ensure the future viability of the City’s rural areas,
including facilitating economic development opportunities that promote sustainable
and commercially viable land uses, and improved approaches to land management.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term
Achievement will be realised over the next four years by the development of
rural planning controls in the Penrith Local Plan, and implementation of other
Strategy actions such as sustainable rural activities. It will also rely on the facilitation of
economic development opportunities that promote leading practice rural land use
and sustainable, commercially viable agriculture activities. In this regard, draft 'rural' planning
controls for the first 'chapter' of the new Local Plan and Development Control
Plan, are currently being developed. As
the State Government's release of the Local Plan template has been delayed (now
expected end March 2006), the earliest that this 'rural chapter' could now be
delivered to the Department of Planning for gazettal is December 2006. Consultations with statutory authorities and
agencies, however, have been finalised, and workshops held with Council's
internal team.
Implementation of
other Rural Strategy actions include the sewering of the villages, continuing
to monitor on-site effluent disposal systems, exhibiting the Open Space Action
Plan, and progressing the development of a system of natural area reserves
across the City. Council's approach to
promoting agriculture has also received strong support from the NSW Department
of Primary Industries. Opportunities to
develop joint projects, and seek funding for initiatives, will continue.
This Term
Achievement recognises that the value of the agricultural sector resides in the
commercial and employment opportunities it provides as well as in its intrinsic value in differentiating Penrith's
rural landscape and lifestyle that distinguishes the city form other regions in
Metropolitan Sydney. This contribution that the agricultural sector makes will
be continuously reinforced in promoting the city's livability image and will
underpin Council's newly adopted investment theme - "Penrith Valley where
business meets lifestyle".
An agricultural
business survey conducted by Council clearly identified a number of issues that
will affect future performance and viability of agricultural businesses in the
City. Some of these issues included succession planning, compliance issues, the
lack of control over supply chains which encourages predatory pricing by major
buyers, specific issues confronting market gardeners from non-English speaking
backgrounds and the general attitude of all levels of government towards
agriculture.
Council's
intentions to promote urban agricultural businesses have received strong
support from the NSW Department of Primary Industries. A major submission for
funding supported by the Department and NSW Farmers Association to undertake a
number of activities to support agricultural businesses has been made to the
Commonwealth under its Building Entrepreneurship in Small Business Program. The
business arm of the state government in Western Sydney, the Greater Western
Sydney Economic Development Board, has also proposed to consult with farmers
from the broader region to identify some key issues that could be canvassed by
the Board.
TERM ACHIEVEMENT 6.2 (DTAM) |
THE CITY’S RURAL LANDS ARE VALUED BY THE CITY’S
COMMUNITIES FOR THE NATURAL AND LANDSCAPE VALUES THEY CONTRIBUTE TO THE
CITY’S CHARACTER. |
This will be
assisted through completion of the City-wide Landscape Strategy and through
the positive engagement of major landowners and government agencies in
improving the natural landscape. |
CONTEXT/ISSUES:
Rural areas
contribute open vistas, landscapes, and a sense of space vital in an increasing
urban environment. Rural lands provide
fresh food and goods from agricultural activities and rural industries, and
provide significant areas of bushland, native vegetation, and habitat
corridors.
Its rural setting provides
Penrith with a unique character, and the aesthetic value of the ‘rural’ nature
of Penrith is continually referenced by
our communities. The City’s rural
landscapes surround the urban areas, and provide opportunities for leisure
activities.
Penrith City contains
extensive rural lands, which have significant agricultural, environmental and
landscape values. Council has been
under increasing pressure to identify and promote appropriate land-uses in the
rural areas and thus give a level of certainty for the residents about the
future of their area. In order to
preserve the distinctive character and environmental values of Penrith’s rural
areas, careful management is essential.
The Rural Lands Study, which
took two years, involved a comprehensive assessment of the City’s rural areas
and rural issues, sought extensive community input and gained the support of
relevant agencies. The outcomes of the
Rural Lands Study formed the basis for the Rural Lands Strategy, which has
identified the planning directions for Penrith’s rural lands for the next 15 or
so years. Council adopted the Rural
Lands Strategy on 29 September 2003. In
endorsing the Rural Lands Strategy, Council also reinforced its strong
commitment to the conservation of the City’s rural lands, and limits to rural
subdivision.
The adoption of
the Rural Lands Strategy highlights a significant step in the achievement of
one of Council’s major planning responses.
It provides a ‘blueprint’ for the rural ‘chapter’ of the new Local
Plan. The Strategy also outlines other
key actions to ensure the future viability of the City’s rural areas, including
facilitating economic development opportunities that promote sustainable and
commercially viable land uses, and improved approaches to land management.
Including recognition of the
City’s rural and landscape values in Council’s promotional materials will also
assist in emphasizing promotion of the City’s rural assets.
The fundamental purpose of
the Landscape Strategy, which is described in more detail in 'The Look of the
City' (CA19.1B and CA19.2A), is to provide guidance regarding Council's
administration and activities that affect the City's landscape character. This Critical Action specifically focuses on
the City's rural landscapes relating to open space or the public domain that is
not owned by Council, including significant private landholdings and government
authority lands.
A Landscape Strategy Forum
will be established as part of the community consultation in the Strategy's
implementation phase and will bring together key agencies, institutions,
landholders and community groups. This
component of the Strategy development will primarily be outsourced and progress
will be subject to Council funds.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
A consultant has
been engaged to assist in the preparation of the Citywide Landscape
Strategy. A draft of this Strategy has
been received from the consultant and it is proposed that the consultation
phase of the Strategy development will occur later this year. This will provide the opportunity for the
engagement of the community and in particular key landowners in improving the
natural landscape of their holdings.
Notwithstanding
the delay in the development of the strategy, other activities have occurred to
enhance the value of the rural landscape.
Concurrently with the development of the Strategy, engagement of the
community in the appreciation of the natural landscape has occurred. This is a continuing focus, currently
delivered through policy advice and discussions with landowners. An audit of existing publications was
developed, to explore options for future promotions.
A review of
Council's maintenance standards for rural roads is also being undertaken. This is particularly focussed on enhanced
litter patrols and roadside verge mowing.
The review will also identify resource implications and funding
opportunities for the enhanced service.
*****
TERM ACHIEVEMENT 6.3 (EHM) |
A NETWORK IS ADVANCING BEST PRACTICE COMMERCIAL RURAL LAND USE. |
A network comprising rural residents, landowners
and appropriate stakeholders is developing leading practice commercial and
rural land uses across the City. |
CONTEXT/ISSUES:
Council’s longer-term goal is that “a strategy to
achieve sustainable, productive use of rural lands and preservation of the
City’s rural qualities is secured”.
Penrith City contains
extensive rural lands, which have significant agricultural, environmental and
landscape values. Council has been
under increasing pressure to identify and promote appropriate land-uses in the
rural areas and thus give a level of certainty for the residents about the
future of their area. In order to
preserve the distinctive character and environmental values of Penrith’s rural
areas, careful management is essential.
The Rural Lands Study, which
took two years, involved a comprehensive assessment of the City’s rural areas
and rural issues, sought extensive community input and gained the support of
relevant agencies. The outcomes of the
Rural Lands Study formed the basis for the Rural Lands Strategy, which has
identified the planning directions for Penrith’s rural lands for the next 15 or
so years. Council adopted the Rural
Lands Strategy on 29 September 2003. In
endorsing the Rural Lands Strategy, Council also reinforced its strong
commitment to the conservation of the City’s rural lands, and limits to rural
subdivision.
The adoption of the Rural
Lands Strategy highlights a significant step in the achievement of one of
Council’s major planning responses. It
provides a ‘blueprint’ for the rural ‘chapter’ of the new Local Plan. The Strategy also outlines other key actions
to ensure the future viability of the City’s rural areas, including
facilitating economic development opportunities that promote sustainable and
commercially viable land uses, and improved approaches to land management.
A significant portion of the
City’s rural lands is not being used for productive agricultural enterprises.
Support is needed to ensure that additional opportunities are provided and
networks established so that these farmers have a future in the City. The
support needed might vary from information and educational material to the
establishment of new marketing opportunities. The adoption of best practice
rural land use will ensure that these farms are not only productive into the
future, but also minimise their impact on the environment.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
A range of
activities has started which will lead to long-term improvements in commercial
rural landuse practice in the City. The South Creek Sustainable Agriculture
Project in partnership with the Department of Environment and Conservation and
other Councils in the catchment has developed resource material that will be of
assistance to farmers, particularly those of a non-English speaking
background. The project officer has
also developed a network of people to provide support.
A survey of
agricultural business activity was undertaken which will help to identify where
Council might be able to provide assistance or better target its
resources. The Department of Primary
Industries has given good support to this project. Council also participated in
a Rural Resource Lands study with a group of western Sydney councils to develop
a planning framework around which the future of these lands might be protected
and managed. Initiatives from this study will be explored including improved
marketing opportunities and retention strategies.
A Farmers Market
has started on a trial basis at the Penrith Paceway site to assess its
longer-term viability. This market has provided additional market opportunities
for local producers.
*****
An underlying
principle of Council’s vision for a sustainable City is that of an equitable
place where its people can each realise their potential and enjoy satisfying,
safe, secure, healthy lifestyles.
Council will seek
to secure social well being by being alert when designing its own programs to
issues of social justice and by championing the City’s case for others who have
responsibility to adequately and equitably service its needs.
Council’s long
established attention to the needs of children and families will continue as a
major dimension of its strategy.
Within the City
there exist localities of comparative disadvantage. There are indicators that
in some older suburbs less obvious disadvantage also occurs. The factors
contributing to these conditions need to be understood and the issues addressed
through well planned coordinated initiatives among those with relevant
responsibilities.
The City’s
ongoing development will create new places and change other places. Eight new places are being planned. These
will be guided to develop as diverse satisfying communities, and as places with
their individual character.
A number of
established localities will continue to change as they renew and redevelop.
That is perplexing to many now living there. A dialogue with those communities
about the need for and benefits of that renewal will continue. The renewal of
these localities will be carefully guided to produce attractive places, and
preserve their established community fabric.
New housing will
be more varied than before to meet the changing needs and preference of the
City’s more diverse population. That will include apartment style housing, in
its major centres. Suburbs not affected
by redevelopment nonetheless change their social make up and age. Programs will
be developed to rejuvenate these places and enhance their existing community
structure and facilities.
As the City’s
make up becomes more diverse and its interests more cosmopolitan, and as it
assumes more importance as the sub region’s central place, more varied and
richer social, recreational and cultural experiences will become accessible to
its people.
Recreation is a key service provided by Council. As the age profile of
the City’s community changes, different preferences for recreation emerge. Council
will through its own programs maintain its emphasis on access to fulfilling
recreation and leisure opportunities.
ISSUE 7: COMMUNITY
WELL BEING AND SOCIAL JUSTICE (DS)
Longer Term
Goal: The
social well being and health of individuals and communities within the City has been maintained and
improved.
DIRECTOR COMMENTS ON THIS
ISSUE:
This is a large
program (given the City’s stage of development) that seeks to maintain and
improve the social well being and health of individuals and communities across
the City. Social justice is about
Council managing change (and quite often with others) to make sure that all
persons in the City have equitable access to the diverse range of social
services and facilities that people need.
Council is committed to the principles of social justice and works hard
to make sure that everyone has the opportunity to engage, take part in and
contribute to their community.
Cities are about
people and it is crucial that Council has a sound understanding of the impacts
of urban development and change. Council’s social planning contributes to the
integrated “developing communities not just estates” approach to planning for
new release areas. Equally the social
and related needs of the established areas are important social planning and
community development priorities.
Given the
complexity of many of the issues and challenges that are beyond Council’s
direct ability to manage, partnership approaches with government agencies,
community organisations and local communities are pursued.
In planning for
and managing grant programs such as CDSE and WSAAS, funding is distributed to a
range of community organisations and groups to assist meeting identified
priority community needs.
Council strives
with others for an improvement in the health and well being of individuals and
hence, communities across the City.
Joint responsibility is addressed by a partnership project with Sydney
West Area Health Service. There is
emphasis on health promotion programs targeted at the community. Any adverse health influences are addressed
either through health promotion or if required regulatory responses. Safe and healthy practices are promoted by a
comprehensive surveillance program of identified premises.
This current
program builds on the firm foundation that has developed with Aboriginal and
Torres Strait organisations and residents in the City. This has involved Council listening to the
issues and priorities of elected representatives and Aboriginal community
controlled organisations.
Self-determination for Aboriginal people and mutual respect are
important principles of Council’s partnership.
Aboriginal and Torres Strait Islander partners identified Indigenous
homelessness as a local priority issue and the Aboriginal community will
benefit from Council auspicing the Indigenous Homelessness project. An examination of the benefit of sponsoring
the attendance of Aboriginal observers at the NSW Local Government Association
Conference is underway (this was a first in NSW). Consultation is paramount here.
Council’s NAIDOC Week activities (which increase and improve each time)
and the partnerships that support these are significant contributors to the
strengthening of mutual understanding and working towards a City that provides
justice and equity for all.
Under the Local
Government Act, Council is required to identify and address the needs of groups
of people in the community that may encounter obstacles to participation in
community life in this City. There are
7 target groups i.e. people with disabilities, women, children, young people,
older people, people from a culturally and linguistically diverse background
and Aboriginal and Torres Strait Islander people. Council is required to report annually to the Department of Local
Government on access and equity activities and outcomes. The aim of this requirement is to improve
access to those social services and facilities provided across the City by
Council and others. The profile of
Penrith City’s residents from a range of culturally and linguistically diverse
backgrounds is constantly changing.
Emerging communities include refugees from Bosnia, Sudan, Iraq and
Ethiopia. These residents as well as those
from more established migrant communities face challenges in accessing services
and participating fully in this City’s civic life. Council works closely with Penrith Migrant Interagency, Nepean
Migrant Access and other peak bodies to develop a range of programs to assist
participation and enhance service access.
Council is approaching
the end of the current Disability Action Plan which identified a range of
priorities for Council involvement and action.
Council’s Disability Access Committee continues to play a key advisory
role to Council on access and related policy issues. A new Plan needs to be prepared with an identification of
required resourcing. The present
part-time Disability Access Officer is funded until February 2007.
A further element of this program is that Council’s planning approach
to housing provision across the City addresses supply, affordability, economic,
social choice and workplace location needs of the community. Council seeks to sustainably manage the
effects of population growth (estimate of 19,000 new dwellings over the next 15
years or so) through the Penrith Residential Strategy. Work in the time ahead will focus around
reviewing the effectiveness and relevance of the Residential Strategy and to
develop a policy framework for Council that informs the provision of housing
choice across the City.
TERM ACHIEVEMENT 7.1 (CDM) |
||
EFFECTIVE RESPONSES ARE
MADE TO THE SOCIAL IMPACTS OF GROWTH, REDEVELOPMENT AND CHANGE. |
||
This will require a
thorough understanding of the processes driving change, including demographic
changes across the City. Action
plans, programs and partnerships will be developed to respond to the social
needs of the City’s diverse communities. |
||
|
|
|
CONTEXT/ISSUES:
The Penrith LGA has experienced considerable
growth and development with the population increasing by over 60% in the last
20 years. The City is expected to grow by another 45,000 people in the next 20
years. Social planning contributes to
ensuring that Council stays focused on addressing the needs and aspirations of
the local community in an efficient, fair and equitable manner. Social planning
is required to respond to the planning agenda for new release areas if these
areas are to develop as communities that are attractive and supportive of the
diverse needs of individuals and families. Social planning input is required for
areas undergoing redevelopment to contribute to these communities remaining
cohesive and so that the social and other needs of the existing and new
residents are responded to.
In order to effectively respond to the social
impacts of change, Council will continue to resource, support and partner with
local community based organizations and other levels of government in order to
respond to identified needs and priorities.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term
Achievement incorporates the social planning function. Social planning advice was provided in
relation to a number of new release areas including Waterside Green, the
Glenmore Park Southern Expansion Area and the WELL Precinct. This advice
contributes to Council's integrated approach to building communities.
In developing
responses Council's partnerships with key government social service agencies
are important. Through participation in multi-agency planning processes for
Families First, Better Futures and the Aboriginal Child Youth and Family
Strategy Council delivers enhanced responses targeting areas of high need. Families First Strengthening Communities
projects in Cranebrook and North St Marys are examples that result in additional
funds for local family support and early intervention programs.
The opening of
the new North St Marys Neighbourhood Centre has also resulted in enhanced local
service delivery for residents. For example St Marys Community Health Centre
now provides some outreach services from the new facility. In its social planning and co-ordination
role Council ensures that issues of growth, redevelopment and change are
considered in the priorities for funding under the Community Development
Support Expenditure Scheme (CDSE) and the Western Sydney Area Assistance
Scheme. As part of the CDSE Scheme over $400,000 was allocated to community
projects in August 2005.
*****
TERM ACHIEVEMENT 7.2 (CDM) |
STRATEGIES ARE IN PLACE TO
RESPOND TO THE SOCIAL AND HEALTH NEEDS OF THE COMMUNITY. |
These strategies will be
informed by indicators of social and health well being and delivered with the
support of relevant Government agencies and community organizations. |
CONTEXT/ISSUES:
Council’s social planning
and community development resources are focused on addressing the priority
social needs of different population target groups as well as addressing
particular suburbs or neighbourhoods that experience high relative levels of
socio-economic disadvantage and poor health indicators.
For Council to meet its
reporting obligations under the Social Planning regulation, Council must
identify and address the priority social needs of the seven mandatory target
groups. These are children, young people, women older people, people with a
disability, Aboriginal and Torres Strait Islander people, and people from
culturally and linguistically (CALD) backgrounds.
Council’s strategic
responses to the social and health needs of the community are invariably
developed in partnership with Federal and State social service departments, the
local community organizations they fund to deliver services and programs, and
local communities.
In some of these strategic
responses Council may be the leaders with other partners, or there may be
another lead agency. In some cases Council may be an advocate on behalf of the
community in relation to a particular issue.
A key challenge
is continuing to deliver existing initiatives and addressing some of the
priority neighbourhoods/suburbs experiencing significant socio-economic
disadvantage.
Some strategies developed in
the previous Strategic Program are also still current.
Over a number of
years research has been undertaken by Sydney West Area Health Service in
conjunction with Penrith City Council to measure the health status of
communities within the city. The study used health and population data and
specific health indicators to assess health status across the area and between
suburbs.
This research
found that if you live in this area you have a “25% greater chance of premature
mortality (deaths before 75 years) which is equivalent to 190 deaths a year”.
(WAHS 2003) Coronary heart disease and
mortality in adult males, followed by hospitalisation for asthma and injury and
poisoning in males 15-24 have the largest potential for improvement.
Issues such as
anxiety, depression and mental health issues, particularly in youth, have led
to problems with substance abuse, a culture of alcoholism and an increase in
suicide, self inflicted injuries and coronary heart disease particularly in
males. Mental health disorders have been indicated as above the NSW rates in a
number of suburbs and 146 deaths were recorded in the 25-74 age group in the
WAHS area due to suicide (1996-2000).
In the 5-14 age
group 13% of hospital separations were due to behavioural and mental health
disorders. These mainly relate to attention deficit disorders, conduct disorder
and emotional disorders. Of note is that the rates of hospitalisation for these
conditions are higher than the NSW rates and significantly higher in males than
females. Funding for specific and targeted programs could address the growing
incidence of such mental health issues in our community.
Mortality from lung cancer
in Penrith for females is significantly above the NSW rate and further action
needs to be taken to address smoking in general and particularly for this
gender.
Coronary heart disease was
the second leading cause of mortality with certain suburbs including St Marys
with rates significantly above NSW rates. This could be attributed in part to
poor nutrition and overall smoking rates in the area.
Health
improvement programs need to be implemented in partnership with WSAH and others
to address the significant issues of health inequity identified in the City.
These inequities can only be reduced by long-term strategies.
Council also has
important statutory responsibilities to protect the health of the community
through regulatory programs. Surveillance and registration of regulated health
premises must be maintained to minimise the risk to the community associated
with poor public health practices. Health education and promotion programs are
also an important adjunct to regulatory programs.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term
Achievement incorporates public health functions and a range of community
development population target group and project functions. A program of audits and inspections aimed at
protecting public health was completed in line with performance indicators.
Health promotion programs were coordinated with key partners and included a
focus on healthy weight and the prevention of smoking. Immunisation clinics
were provided on a programmed basis at both St Marys and Penrith.
The Healthy
People Partnership Project with Sydney West Area Health continued to successfully
integrate health policies with Council's activities. Key activities included
research and identification of opportunities for the inclusion of health
principles into planning policy. Health principles were developed for the City
Centres Review. Health programs continued to be integrated through the Social
Planning Framework.
A number of local
suburb initiatives focussing on prevention of smoking, and nutrition education
have been implemented to improve the health of local communities. The Healthy People Partnership with Sydney
West Area Health Service is meeting agreed objectives. Enhanced co-ordination of social service
delivery by community organisation partners in the youth, migrant, aged,
disability and area-based interagency networks has progressed delivering better
outcomes for local communities.
Community
facility capital projects are progressing including at Claremont Meadows and
Castlereagh Hall with improved capacity for local community groups and
residents. The development of design options
for the South Penrith Community Facilities precinct is also on target. Social Planning statutory reporting
requirements have been met and the preparation of a scoping paper on an Aging
Strategy for the City has also advanced.
Council also
hosted a planning workshop for the Penrith Community Care Forum to inform the
Department of Aging, Disability and Home Care’s resource allocation process for
local service enhancements.
Twenty-three local projects were also funded through the Community
Assistance Program Planned Component for 2005/06. Projects were funded across the City and targeted people with a
disability, young people, women, children, older people, Aboriginal and Torres
Strait Islander people, people from culturally and linguistically diverse
backgrounds as well as the general community.
*****
TERM ACHIEVEMENT 7.3 (CDM) |
COUNCIL CONTINUES TO OFFER
LEADERSHIP IN DEVELOPING A BETTER UNDERSTANDING OF AND CO-OPERATION WITH
ABORIGINAL AND TORRES STRAIT ISLANDER ORGANIZATIONS AND PEOPLE. |
This will be achieved
through continued recognition of the unique status of Aboriginal and Torres
Strait Islander peoples and cultures and through joint initiatives that
support increased understanding and co-operation. |
CONTEXT/ISSUES:
Three and a half thousand
Aboriginal and Torres Strait Islander residents live in the Penrith LGA (2001
Census). This is the fourth highest population in NSW by LGA. This population includes Aboriginal and
Torres Strait Islander people from many “nations”. Aboriginal and Torres Strait Islander residents in Penrith City
have, compared to the rest of the population, a significantly younger age
profile. Aboriginal and Torres Strait
Islander people, because of dispossession and discrimination continue to
experience significant health, education and socio-economic disadvantage.
Unemployment levels are substantially higher in the City’s Indigenous community
than the overall community.
Council continues to offer
leadership in developing a better understanding of and co-operation with
Aboriginal and Torres Strait Islander organizations and people.
Council has well-established
partnerships with local and regional Aboriginal community controlled
organizations. A key principle
informing these partnerships is Aboriginal self-determination.
Council has also taken a
number of steps to express its recognition of the unique status of Aboriginal
and Torres Strait Islander people as the original owners and custodian of lands
and waters. This includes flying the
Aboriginal flag at the Civic Centre as well as in the Council Chambers. Statements of acknowledgement and
recognition are included in Council Ordinary Meeting protocols as well as in
Citizenship ceremonies.
A key challenge for Council
in building on its existing partnerships is the current “situation” in
Aboriginal and Torres Strait Islander elected structures – at a Federal level
the abolition of the directly elected Aboriginal and Torres Strait Islander
Commission with its state regional structure and processes, and the continued management
and administration of the NSW Aboriginal Land Council by an appointed
Administrator rather than elected Councillors. This “situation” impacts on
local Aboriginal community controlled organizations insofar as addressing
issues beyond core service delivery places significant strain on resources,
both people and capacity.
This “situation” therefore
also influences Council’s approach to partnerships and common issues – what
appear to Council as priorities may not be priorities for Aboriginal organizations.
At the same time Council can
continue to enhance its service delivery functions to be more responsive to the
needs of Aboriginal organizations and residents in the City. These services
include the range of children’s services, identifying priority social needs for
funding through the available State and other funding programs, land and
cultural heritage management, and opportunities for employment with Council.
A key challenge will also be
to provide support to ensure that the Aboriginal Catholic Ministry currently
housed in the Old Council Chambers can continue to have a central service
delivery location that is accessible to the Aboriginal volunteers that run the
service and their clients.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
NAIDOC Week
activities held in July 2005 were very successful with highlights including a
Civic Reception and Flag-raising Ceremony at the Joan Sutherland Performing
Arts Centre. Special guests were Mayor
Ted Simpson from Brewarrina Shire Council and Badger Bates whose art work was
exhibited at the JSPAC during NAIDOC Week.
The Family Fun Day at Jamison Oval was also successful with
approximately 2000 participants including Council staf,f participating in the netball round robin.
NAIDOC Week continues to contribute to positive relationship building with
Aboriginal partner organisations and Aboriginal and Torres Strait Islander
residents.
Partnerships with
Aboriginal organisations continued with advice and support provided to the
Deerubbin Local Aboriginal Land Council, the Cranebrook Penrith Aboriginal and
Torres Strait Islander project and the Western Sydney Aboriginal Corporation
(CDEP). Enhanced service delivery for local Aboriginal residents and local
economic development has resulted.
Council also continued to support the Penrith Police Command Aboriginal
Consultative process. A successful Indigenous Homelessness Project forum was
also held with over 30 participants providing feedback to the presentation on
project findings and recommendations.
Overall the
response was extremely positive. The
Homelessness project also finalised a partnership with the Penrith Youth
Accommodation Interagency Network and the Department of Community Services to
deliver anti-racism training for the Network in the first half of 2006 to
improve service delivery to Indigenous clients by local youth supported
accommodation providers.
*****
TERM ACHIEVEMENT 7.4 (CDM) |
ACCESS HAS INCREASED FOR
COMMUNITIES THAT FACE BARRIERS TO USING SOCIAL SERVICES AND FACILITIES. |
This will require improved
co-ordination in delivering initiatives to support and encourage fairness of
access to Council and other social facilities and services to identified
groups. |
CONTEXT/ISSUES:
An important component of
Council’s civic leadership is supporting the engagement and contribution of its
residents to a cohesive community, one where the people of the City have access
to the services and opportunities needed to enjoy a fulfilling quality of life.
This Term Achievement
addresses the particular barriers that people from culturally and
linguistically diverse (CALD) backgrounds and people with a disability often
experience when accessing the social services and facilities that can assist in
supporting quality of life outcomes.
People of Culturally and
Linguistically Diverse Background
Over twenty thousand
residents in the Penrith LGA were born in a non-English speaking country. This is approximately 13% of the total
population. Because of the migration
and settlement patterns in Penrith over 20% of the population over 65 years of
age in Penrith is born in a non-English speaking country. This has clear implications for service
provision to the older population of the City.
More recently emerging
culturally and linguistically diverse populations include refugees from Bosnia,
Afghanistan, Sri Lanka, Ethiopia, Iraq and Sudan.
Some of these residents face
barriers to their participation in everyday civic life and a co-ordinated
approach is required to deliver initiatives that support access and equity to
services. Settlement support services
are predominantly funded by the Department of Immigration, Multicultural and
Indigenous Affairs (DIMIA).
Because Penrith LGA’s
culturally and linguistically diverse population are from many different
countries the City does not have many ethno-specific services, sporting
associations/clubs, and welfare groups. This increases the need for mainstream
services to be accessible and provide culturally appropriate programs.
Council plays a leadership
role in supporting service access and equity as well as ensuring its own
services are accessible to people of culturally and linguistically diverse
backgrounds.
To achieve the diverse
cultural experiences that are an important component of Council’s vision of a
cosmopolitan City, it is important that Council, through its civic leadership
role, facilitate opportunities for showcasing of the City’s diverse communities
and cultures. There are clear synergies here with Issue 8 (Cultural
Development), Issue 12 (Magnetic Places) and Issue 23 (Visitors to the City).
People with a Disability
Australian Bureau of
Statistics data from its National Household Survey of Disability, Ageing and
Carers (1998) indicates that in any large population one in twenty people have
a disability. 87% of those with a
disability experience specific restrictions in core activities, schooling or
employment. The rate of disability increases with age – from 4% for children
0-4 years old to 84% for people aged 85 and over.
Funding for support services
for people with a disability comes principally from the Federal and NSW
governments. Services include
accommodation, respite care, home help, home maintenance, community transport,
carer support, specialised equipment subsidies and day care. A number of these services are located in
the Community Connections. There are often long waiting lists for assessments
to determine delivery of a service. Services themselves are invariably
allocated to those most in need.
Council, through its
co-ordinating role, facilitates the identification of priority issues for
action by service networks and, in some cases, advocacy. The local Community
Care Forum interagency plays a key role in this.
In 2003 Council adopted a
Disability Action Plan (DAP) as it was recognised that access to facilities,
services and life opportunities can be improved for people with disabilities
through a strategic and planned approach.
Recommendations in the DAP
included the employment of a Disability Access Officer for a period of three
years to oversee the implementation of the Plan, and that a new Plan should be
developed each three years.
Council’s Disability Access
Committee also plays a strategic role in providing advice to Council on
ensuring that its policies, and practices take into account access for people
with physical and intellectual disabilities.
Access for people with a disability presents particular challenges to
Council and this Committee will continue to play an important advisory role.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term
Achievement includes the multicultural access and disability access
functions. A number of partnership
initiatives were delivered in the period to improve access to services by
residents from culturally and linguistically diverse background and support
broader community cohesion. These
initiatives included a second Introduction to Islam workshop with over 40
service provider participants, a successful Refugee Week activity involving
service providers, refugees and other community members and an orientation
visit to Penrith Library by frail aged residents from the local Spanish and
Filipino communities. All of these initiatives contributed to enhanced service
delivery for people from culturally and linguistically diverse backgrounds.
Partnership and
service co-ordination for residents from culturally and linguistically diverse
background was supported through participation in Penrith Migrant
Interagency. Council’s three year
Disability Action Plan continues to be implemented with further disability
access improvements scheduled including the staged implementation of Tactile
Ground Surface Indicators in the Penrith City Centre and St Marys Town
Centre.
Successful
Councillor disability access awareness training was held during the period. The
St Marys Town Centre Access map was also launched. These disability access
initiatives also contributed to leading edge access responses across the
organisation through the leverage provided by the Disability Access Improvement
Program. Three Disability Access
Committee meetings were held and advice was provided to Council on many items
including the accessibility provisions of the State Seniors Living Policy,
Disability Awareness training for Councillors and staff, the Disability Access
Improvement Program and progress in the implementation of the Disability Action
Plan.
The Committee
also had community representatives at Council’s Open Day to demonstrate
enhanced access technology at the workplace and in Penrith library. International Day for People with a
Disability events focused on partnerships and included Penrith Library,
disability service providers and community members contributing to enhanced
service responses to people with a disability.
*****
TERM ACHIEVEMENT 7.5 (LPM) |
COUNCIL’S PLANNING APPROACH
TO THE PROVISION OF HOUSING ACROSS THE CITY ADDRESSES THE SUPPLY, CHOICE,
AFFORDABILITY, ECONOMIC, SOCIAL DIVERSITY AND WORKPLACE LOCATION NEEDS OF THE
COMMUNITY. |
This will necessitate
improved levels of research on housing needs with targeted responses being
pursued through partnerships with the Department of Housing, Landcom and key
industry networks. |
CONTEXT/ISSUES:
Of the 407 square kilometres
that make up the Penrith City Council area, 18% (73 km2) is urban, and the
majority of that (about 61 km2) is residential.
Contemporary planning
initiatives at both State and local government level reinforce the need for
containing urban growth, preserving the rural edge, and conserving and
encouraging the long-term viability and character of Penrith’s Rural Lands.
These initiatives included Penrith’s Residential Strategy, which was adopted by
the Council in 1997. The Strategy was primarily a response to continuing
population growth, seeking to manage the effects of that growth in a way that
is compatible with local environmental character, and with expectations
expressed by the City’s residential communities.
The Residential
Strategy identified that expected population growth up to 2021, based on
Department of Planning (DoP) projections of 206,000 population, would require
around 19,000 new dwellings. That demand included consideration for additional
population due to natural increase, and net inward migration, as well as new
household formation amongst existing population. The Strategy concluded that
there was capacity to accommodate this projected growth within existing and
currently planned release areas.
More recently, the research
undertaken by Bill Randolph suggests that as incoming residents will be living
in smaller households, there may be an overall shortfall in the number of
dwellings proposed in the Strategy. He has also indicated that a more
‘fine-grained’ approach to planning the City’s future and redeveloping
residential areas will be needed, to ensure that diversity in housing types
(and communities) is actively facilitated.
The State Government’s
planning reforms, and emerging Metropolitan Strategy, are also requiring
increasing urban consolidation responses around public transport nodes
(railways) and along urban corridors. The provision of housing that meets the
needs of older people and those with disabilities is also a significant issue,
particularly as the over-55 age group is one of the fastest growing demographic
groups in the City of Penrith.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The Strategy was
primarily a response to continuing population growth, seeking to manage the
effects of that growth in a way that is compatible with local environmental
character, and with expectations expressed by the City’s residential
communities. The Residential Strategy
identified that expected population growth up to 2021, based on Department of
Planning (DoP) projections of 206,000 population, would require around 19,000
new dwellings. That demand included
consideration for additional population due to natural increase, and net inward
migration, as well as new household formation amongst existing population.
The Strategy
concluded that there was capacity to accommodate this projected growth within
existing and currently planned release areas.
More recently, the research undertaken by Bill Randolph suggests that as
incoming residents will be living in smaller households, there may be an
overall shortfall in the number of dwellings proposed in the Strategy. He has also indicated that a more
‘fine-grained’ approach to planning the City’s future and redeveloping
residential areas will be needed, to ensure that diversity in housing types
(and communities) is actively facilitated.
The State
Government’s planning reforms, and emerging Metropolitan Strategy, are also
requiring increasing urban consolidation responses around public transport
nodes (railways) and along urban corridors.
The provision of housing that meets the needs of older people and those
with disabilities is also a significant issue, particularly as the over-55 age
group is one of the fastest growing demographic groups in the City of
Penrith. This Term Achievement will be
realised over the next four years by a focus on continuing research on housing
trends and needs throughout the City, developing a policy framework to respond
to emerging issues, and reviewing the adopted Residential Strategy. This will assist in delivering a range of
affordable and accessible housing options, which meets the needs of the
existing and future population.
Whilst the
proposed review of the Residential Strategy itself has not yet commenced, there
are a number of activities, currently underway, that will inform this major
project. These include our
participation in the Sub Regional Planning process (which will identify
anticipated dwelling targets for the City) and also involvement in an Urban
Renewal Study, being undertaken in partnership with WSROC and other Councils,
and managed by Bill Randolph at the University of New South Wales.
*****
ISSUE 8: CULTURAL
DEVELOPMENT (DS)
Longer Term
Goal: The
City of Penrith is the cultural hub of Western Sydney.
DIRECTOR COMMENTS ON THIS
ISSUE:
The City’s three
cultural icons: Joan Sutherland
Performing Arts Centre (JSPAC), Penrith Regional Gallery and the Lewers Bequest
(PRG) and Railway Street Theatre (RST), have undergone major change both in a
capital sense and at the management/operations level in recent times. The JSPAC Extensions project has
concluded. A new management structure
is in place and Council has increased its level of financial assistance to
reflect the expanded Centre operations.
Focus in the time ahead will be working with the JSPAC management to
address the structures/arrangements that need to be in place to ensure the
expanded facility has the best platform to realise the significant
opportunities the extensions provide.
The first stage of the PRG extensions is complete. The second stage, which comprises new
capital improvements and building conservation work, made possible by a
significant grant from the NSW Government, is about to commence.
There is a
critical action in the current Management Plan to further integrate the City’s
principal cultural facilities to maximise community benefit. There is a body of work reasonably well
advanced by Council’s Working Party, to achieve this. A report for Council’s consideration is expected in the near
future. The City’s cultural profile
continues to be raised.
An ongoing target
for the Library Service is to improve the Library book collection’s quality and
quantity, enhance electronic services and provide a variety of promotional
activities. The Library collection has
been enhanced through the application of Section 94 funds and increased funds
from general revenue. Work is underway
to develop and then implement a Library Strategic Plan to add value to the
service.
Options have been
reviewed and a potential program developed for the production of further
volumes of the History of Penrith. A
method of funding the writing, editing and publishing for the next volume needs
to be resolved for the project to continue.
Council has
consistently provided a merit regional Library Service over the period. There have been ongoing enhancements to the
service to ensure currency and a continuing high level of acceptance and use by
the community. The Library Service
remains a flagship operation of the organisation.
A Masterplan for
the Penrith Valley Cultural Precinct (PVCP) has been adopted and selective
implementation of that Masterplan commenced.
It is Council’s vision that the PVCP will be the hub and city focus for
a range of community-based arts and cultural groups. This is a major project with an implementation timeframe over a
number of years along with resourcing implications. There has been slippage in progressing this project. Dedicated resources will achieve an
advancement of the project over the 2005-2009 Strategic Program.
A draft Penrith
City Cultural Planning Framework is complete.
The framework will deliver a planned and strategic approach to cultural
development in the City. The
integration and implementation of the strategies arising from the framework
come with currently unfunded resourcing challenges. A report for Council’s consideration is expected in the near
future.
TERM ACHIEVEMENT 8.1 (CDM) |
THE CITY IS WIDELY
RECOGNISED AS A CENTRE OF CULTURAL DIVERSITY, EXCELLENCE AND ACCESS. |
This will be achieved
through the implementation of the Cultural Plan and the integration of
cultural development across the organisation. Partnerships will be formed and projects will be undertaken
with local and regional groups, including regional media where appropriate,
to contribute to the cultural diversity of the City. The continuing delivery of a quality Public
Library Service is an important function of this program. |
CONTEXT/ISSUES:
The NSW Department of Local Government Cultural
Planning Guidelines state -
‘Culture in its widest sense is about what matters
to people and communities… local cultural planning deals with these unique
values and experiences, it is a way of helping Councils integrate and focus
their efforts in all the areas that affect the quality of people’s lives. It is
a way of linking those efforts with broader management plans and strategies.’
Penrith
City is maturing and, as the most important and influential City in outer
western Sydney, is positioning itself to fully realise the national and
international potential of the City. Cultural planning and development assists
in defining our community. It assists in creating spaces that the communities
of Penrith value as expressions of their identity.
Cultural development is one of the tools that
Council can utilise in order to realise the potential of the City both for
residents and for visitors. Cultural planning will provide opportunities for
individuals and community groups to be included and represented in the image of
Penrith, encouraging confidence in local identity and provide new and
innovative ways for residents to participate in decision-making and civic life.
The
Library Service is a key cultural asset and plays an integral role in the
social and economic development within the city. The development of a
‘strategic plan’ will assist Council in identifying and addressing existing barriers
to access to this service as well as doing a realistic analysis of the capacity
of the library service to meet existing and future demand. Access to
information technology, particularly through a city’s libraries, is recognised as a key equity issue
for communities as the growing economic implications of the information
revolution and the pivotal role it can play in the success of local cultural
and other industries is better understood. Council’s Libraries have an
important role in a learning city, one which can adapt to new market challenges
and opportunities.
Libraries function to
enhance social interaction and trust and foster a sense of equity within the
community in which they are placed, which in turn contributes to social capital
and cultural development. These characteristics make libraries an ideal focus
for harnessing community input into cultural regeneration, as well as offering
Council a pathway to communicate with hard to reach communities.
This
term achievement is a challenge to Council, focusing attention on the
aspirations of the local community to participate in a diverse range of
cultural activities. This Term
Achievement will be achieved through finalising and implementing a plan for cultural
development as well as a ‘strategic plan’ to enhance library services. Both of
these plans will have prioritised actions and will sit within a framework,
acknowledging the significant activities, such as the library service that
Council already undertakes in terms of cultural activities in the local
community.
Key elements of
this Term Achievement will be delivered over the next four years, notably the
finalisation of the Cultural Planning Framework will be delivered in the first
year of this Strategic Plan. However this term achievement is an ongoing
aspiration. It is a broader achievement
that is part of a strategic program that will need to be staged over the next
decade and beyond. Delivery of the actions resulting from the Cultural Planning
Framework and the Library Services ‘Strategic Plan’ will be largely dependent
on additional resourcing.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Work has
progressed on the City-wide Cultural Planning Framework with a presentation to
Council in August and Council endorsement of submitting an application for a
50% funding contribution from the NSW Ministry of the Arts for a Cultural
Development Co-ordinator. The framework
will deliver a planned and strategic approach to cultural development in the
City with actions for Council and key partners identified. Work has also progressed in the Penrith
Valley Cultural Precinct with consultant reports on the scope of works being
assessed. In addition the specific
space and equipment needs of a number of cultural and community organisations
in the precinct as well as those that might be located there have been
confirmed.
*****
TERM ACHIEVEMENT 8.2 (FOM) |
THE CULTURAL ASSETS OF THE
CITY HAVE BEEN INTEGRATED TO ESTABLISH ITS REPUTATION AS A CREATIVE
PLACE. |
This program is based on
completing major extensions to two regional cultural facilities (Joan
Sutherland Performing Arts Centre and Penrith Regional Gallery) and
establishing a Community Arts Precinct at St Marys. A strategy of better integrating and promoting the principal
cultural assets of the City will continue. |
CONTEXT/ISSUES:
The City can
boast about its three cultural icons, namely the Joan Sutherland Performing
Arts Centre, The Penrith Regional Gallery and Lewers Bequest and the Q Theatre.
Major change both in a capital sense and at the management/operational level
are at various stages of completion. In
moving forward on these programs there will be a significant step forward in
redressing the cultural imbalance and inequity that has existed between
metropolitan Sydney and the outer west.
No longer will our community have to travel long distances to afford
themselves the opportunity to experience cultural influences that are provided
by these facilities.
In addition to these
significant cultural facilities there is an opportunity to establish smaller,
isolated cultural precincts across the City.
These may centre around a group neighbourhood centre or residential
park. It could involve, not only
physical elements, but a variety of cultural programs. The City-wide cultural plan will give
Council some lead in this regard.
Until now each of these
facilities has operated independently of each other. Council identified potential benefits from an operational
viewpoint and broadly to the community if these facilities were integrated in some
manner. The way in which this is to be
achieved will need to be thoroughly investigated and there will be the need to
include a range of stakeholders in this process.
Merely combining
the management structures may not be the answer. An innovative approach is
required to ensure that it gains support in its broadest sense and also to
ensure that the integrity and cultural significance of those facilities is not
lost in the transition. This approach
has not been undertaken before and would have application far beyond our City
boundaries.
The cultural well being of
the community is influenced in a number of ways. The City’s cultural assets offer one such experience. There are others and these will emerge through
the development and implementation of Council’s City-wide cultural planning
framework.
Ongoing interaction and
consultation with the City’s community is vital to sustaining a vibrant and
creative City.
Over the next four years
this Term Achievement will be achieved by completing the major extensions to
two regional cultural facilities within the City and establishing a cultural
precinct at St Marys. A strategy of
better integrating and promoting the principal cultural assets of the City will
continue.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The City and its
communities are enriched by the City's cultural assets, each of which is
undergoing change. The JSPAC extensions
have been completed and officially opened.
An expanded cultural program and management structure has been put in
place at the Centre. The Centre now
includes a larger drama theatre space replacing the outdated Q Theatre
building.
The PRG & LB
is preparing for its capital upgrade with documentation completed and the
selection process for a preferred builder underway. A scope of new work is proposed in addition to a much needed
conservation program on the historical buildings at the Gallery site. Different parts of Council are undertaking activities
across the LGA on an individual and unstructured basis. The City-wide cultural planning framework
has been completed. Strategies will be
developed which will bring a better and more coordinated focus to activities
across the City.
Potential
benefits have been identified in integrating the principal cultural facilities in
the City. A Councillor working
party and representatives from those
facilities have endorsed the principle of the formation of an integrated entity
and have developed a draft new structure to support that new entity. A program of stakeholder consultation has
commenced.
*****
ISSUE 9: RECREATION
AND LEISURE (DS)
Longer
Term Goal: Accessible and usable recreation facilities and services meet the needs of
the community.
DIRECTOR COMMENTS ON THIS
ISSUE:
The Peoples
Lifestyle Aspirations and Needs Study (PLANS) was completed during the previous
Strategic Program. It reviewed
recreation and cultural facilities needs for the City. As a result of PLANS and an Open Space
Action Plan, Council can now prioritise and progressively implement actionable
steps to deliver the open space and recreation needs across the City. A draft S94 Plan has been developed and
publicly exhibited which will assist with funding to deliver the required works
over time.
Significant
improvement works have been taking place across existing recreation facilities
throughout the City. The Parks
Improvement and S94 Programs have generally been undertaken on schedule. Consultation has occurred with a range of
sporting user groups with an emphasis to optimise the use of the City’s
facilities where possible. This is in
keeping with the Term Achievement aim of involving the community in determining
future directions.
The Penrith
Football Stadium Extensions project was further advanced, new Skate Park
facilities at St. Clair and Glenmore Park were advanced and the Parks
Improvement Program continued. The time
ahead will bring a focus to developing a priority program to provide additional
recreation facilities for the City (including more local and regional active
open space) and to actively pursue partnerships to optimise recreation and
leisure opportunities across the City.
TERM ACHIEVEMENT 9.1 (FOM) |
THE CITY’S RECREATION AND
LEISURE FACILITIES AND SERVICES MEET ITS NEEDS AND ARE MORE OPTIMALLY USED. |
This will be achieved by
involving the community in determining levels of service and programs, and in
facility and delivery management.
Stakeholders will be encouraged to provide a variety of programs to
ensure use of facilities is maximised. |
CONTEXT/ISSUES:
The PLANS (People’s Lifestyle Aspirations and
Needs Study) aspirational research indicated clear community priorities
regarding the relative importance of improvements to recreational
facilities. The top five priorities for
improving the City’s recreation areas and facilities includes –
~ nature reserves and
waterways (49%)
~ playgrounds (43%)
~ parks (43%)
~ walking and cycle paths
(41%)
~ aquatic centres/pools
(30%)
Demographics trends indicate an ageing population,
both in Penrith and Australia wide.
While the City’s population in general is ageing, there are also
substantial numbers of younger families with children, particularly within the
new urban areas of the City. It is
important to plan for the existing and predicted recreation and leisure needs
of the community.
The PLANS Aspirational Research indicated
significant (and growing) community participation in informal passive
recreation activities (such as walking, picnics, and socializing with
friends). Quality passive recreation
spaces are needed to meet the needs of the City’s diverse communities, and also
recognise the increasing accessibility needs of our ageing population. Active open space is also needed, however,
to encourage health through physical activity, and to cater for the growth in
identified sports.
The adopted Recreation and Cultural Facilities
Strategy, developed from the PLAN Study, makes recommendations regarding the
provision, embellishment and management of the City’s open space, sports
grounds and facilities, and services and programs. It recommends the
development of high quality, multi-purpose recreational precincts that provide
a range of active and passive recreational activities within accessible areas
of the City, and identifies the need to improve the quality of the City’s open
space and facilities, to better reflect and meet the needs and abilities of the
City’s communities.
Many of the City’s recreation and leisure
facilities are shared by a range of interests, often without the knowledge of
each other. Better integrating those
groups and individual programs would have significant operational efficiencies
and utilization of those facilities. Ensuring these facilities reflect the
contemporary sporting and community interests needs is important. Council is best placed to coordinate that
interaction and to achieve maximum outcome, dedicated resources would assist.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Clear community
priorities for recreation and leisure needs have been demonstrated through the
comprehensive research completed by Council (PLANS) which lead to the adoption
of a Recreation and Cultural Facilities Strategy. An agreed program of implementation of that strategy has
commenced, which includes the redevelopment of the Penrith Football Stadium,
advancement of new skate park facilities at St Clair and Glenmore Park, and
implementation of an expanded parks improvement program across the City in the
open space areas. A Pathway Action Plan
has commenced. Strategies and programs
have been introduced to achieve enhanced utilisation for sporting groups at
Ched Town Reserve at Glenmore Park and Jamison Park for Nepean Soccer.
*****
ISSUE 10: PLANNING
AND PROVIDING FOR THE NEEDS OF
CHILDREN (DS)
Longer Term
Goal: Families
and children are valued and supported to enable
them to contribute to the economic and social well being of the City.
DIRECTOR COMMENTS ON THIS
ISSUE:
Children’s
Services programs and operations are focussed towards promoting and supporting
families and children to enable them to contribute to the economic and social
well being of the City. Engaging with
the community, advocating and lobbying with all levels of government to remain
focussed on the strategic direction remains a strong goal.
The Penrith City
Children’s Services Co-operative continues forward strongly in the task of
managing Council’s Children’s Services direct services operations. The Co-operative has finalised strategic
directions for the next few years. This
will inform Council’s budget process. A
centralised financial model is now operational and is providing enhanced
benefits to the overall service. There
are emerging resourcing issues to be addressed to enable the Co-operative to
function as effectively as possible.
Some of these issues are being addressed at this time. An Operations Manager has been appointed for
a 3 year term, a dedicated Finance Services position and Human Resource
position (temporary) are in place.
Council’s
successful Traineeship Program (with TAFE) across the majority of Council’s centres
has added value to the overall program.
An emerging challenge in the years ahead will be to ensure centre
compliance with changing legislative requirements across all facilities.
Encouragingly,
most categories of Children’s Services are on track in terms of utilisation
rates. Some fluctuation continues to be
experienced in B & A and the Mobile Pre-School which is consistent with the
nature of these services. As a service
type, B&A/OOSH is not operating as a financially viable operation. B&A/OOSH is heavily subsidised by
Pre-School and Long Day Care. This has
been acceptable in the short term but is not sustainable in the long term. The Co-operative is currently examining this
challenge. Customer satisfaction rates
measured through surveys are exceeding targets. Affordability of access to Children’s Services is an ongoing
issue for the Co-operative. A
continuing position for Council has been to vigorously advocate and lobby for
appropriate government support of Children’s Services fee structures and
improved funding distribution and levels at every opportunity. This is ongoing. The lack of a National planning framework for the distribution of
Child Care Benefits in Long Day Care is also impacting on supply and demand
factors for the service.
Demand continues
to grow and waiting lists for babies and toddlers increase steadily in many
suburbs. However, there is an
oversupply of places for 3 – 5 year olds.
Ongoing issues are the provision and cost of places for infants and
pre-school users and also the provision of funded OOSH places in new suburbs
and where service gaps exist. The Out
of School Hours Bus Fleet Replacement Program has been advanced. This program sees all of Council’s OOSH
services having access to a fleet bus to enhance their services. Children’s Services continues to be provided
by Council to assist family employment choices and to maximise children’s
potential. At this time, actions are
generally on target in meeting the challenge of planning and providing for the
needs of children across the City.
There is
acknowledged slippage with Tamara and Erskine Park Child Care Centres extension
projects. These are expected to be back
on track in a short time. Possible
government funding withdrawal threatens the continuation of several valuable
programs. Council was the preferred
tenderer for the Inclusion Support Agency to support the access of children
with additional needs in Federally funded children’s services across the region
(Penrith, Blue Mountains and Hawkesbury LGA’s) from next month. This is seen to be recognition of the
quality of the services provided by Council.
The time ahead
will see a primary focus on completion of an extensive Capital and Operating
Projects program, advancement of Glenmore Park Child and Family Precinct
Project, introduction of economies that can be brought to the overall Service,
the sustaining (and where possible) enhancement of utilisation levels for all
service types and the continuation of successful partnerships with a range of
relevant stakeholders.
Recognition is
also evidenced by partnerships with Macquarie University (STAR programs to
participate in their Disability Access Research project) and University of
Western Sydney (their Professional Experience Research project).
Council’s longer-term
goal to ensure that families and children are valued and supported to enable
them to contribute to the economic and social well being of the City remains
foremost in both the Co-operative and Department’s agendas.
TERM ACHIEVEMENT 10.1 (CSM) |
SERVICES ARE PROVIDED TO
MEET THE DIVERSE NEEDS OF FAMILIES AND TO SUPPORT THE DEVELOPMENT OF
CHILDREN. |
This involves
research and planning, consultations and advocacy with others, to identify
and facilitate the provision of a broad range of services that reflect
community preferences and contemporary professional standards. This will
inform advocacy for standards of care, recreation and education. This program
includes strategies to ensure equity of access and programs, built on
relationships that acknowledge cultural and generational connections, which
support positive outcomes tor families and children. |
CONTEXT/ISSUES:
In 2000 Council
adopted a Statement of Purpose recognising that experiences in early childhood
have a profound impact on outcomes for children and the development of social
capital within the City. Council committed to providing and facilitating the
provision of programs and services for children across the City. This term
achievement focuses on assessing and improving equitable and accessible
experiences and facilitating equity in outcomes for children across the City.
Consistent with the directions of Federal and State Governments, programs and
services should also focus on strengthening families as an intervention
strategy to improve outcomes for children and to build the capacity of our
community, families being a major segment of the population. Issues to be
addressed include improving health, literacy and family capacity through a
range of programs.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
In the context of
meeting community needs children’s services provides a variety of 41 children’s
programs which include: 709 Places in long day care; 225 places in Preschools;
410 places in Before and after school care; 275 places Vacation care; 29 places in Occasional care; 26 places in
Mobile preschool and one mobile playvan service. Over 4000 children have attended programs to the end of December
and it is expected that over 5,000 children will attend by the end of June
2006.
Council is
strongly committed to the provision of early and middle childhood care and
education for young children, to support enjoyment and development in childhood
whilst enabling children to reach their full potential. This along with support for parents builds a
stronger community and adds value to the City’s economy. This term achievement will be achieved by a
greater focus on research and analysis and the development of a City Wide
Strategy for Children. Such a strategy will enhance the programs and services
currently provided to support families and children.
Inclusion of
children with additional needs has been supported through the continuation of
SUPs prior to the hand over to the
ISA. OOSH integration has
reduced access support to two services due to funding constraints. The
STaR project has commenced at three centres providing increased support for the
inclusion of children with additional needs into long day care and providing
staff development as part of this research project.
The Family Links
project at Kindana is increasing family support networks in St. Clair. Reviews of service levels in South Penrith,
St Marys and Cranebrook are underway in the light of increased competition and
demographic changes. Mainstream Children's Services are slightly below planned
utilisation rates.
Resourcing
options were determined for the Penrith City Children's Services
Co-operative. Of significance two major
submissions were made to support the inclusion of children with additional
needs to NSW Department of Community Services and to the Commonwealth
Department of Family and Community Services.
The tender for the Commonwealth Inclusion Support Agency was successful
and the DOCS early intervention programme submission is progressing to stage
two in partnership with leading family support agencies. The first stage of actions to ensure
compliance with changed requirements of the NSW State Licensing regulations for
Children's Services was completed with training of staff. An extensive programme of facility upgrades
is well underway, with delays in some design components.
*****
ISSUE 11: COMMUNITY
SAFETY (DCO)
Longer
Term Goal: Communities feel confident about their safety.
DIRECTOR COMMENTS ON THIS
ISSUE:
The Penrith
Valley Community Safety Plan was adopted by Council in December 2002. The plan was prepared with assistance from
the Centre for Regional Research and Innovation at the University of Western
Sydney. The plan contained three main
tasks; the preparation of the Penrith Valley Crime and Safety Profile, review
of the existing Council Community Safety programs and the selection of
appropriate Community Safety Strategies.
The plan was
subsequently endorsed by the NSW Attorney General’s Department as a Safer
Community Compact to expire in December 2005.
The Attorney General’s Department recently extended the plan’s operation
to December 2006.
Work will
commence shortly on consultations with the community towards developing a new
Community Safety Plan for the period 2006 - 2009.
The Penrith
Valley Community Safety Partnership, which is a committee of Council and
includes Councillors, Council officers, Police, business and community
representatives and State Government authority representatives, will oversee
the development of the new plan.
The new plan will
address community safety issues and develop strategies to address these
issues. Crime Prevention through
Environmental Design (CPTED) initiatives will continue to be pursued and
provision of information and education of residents regarding personal and
community safety will also be a priority.
TERM ACHIEVEMENT 11.1 (AM) |
A COMMUNITY SAFETY PLAN
BUILDING ON A PARTNERSHIP WITH POLICE, THE COMMUNITY, AND OTHER STAKEHOLDERS
IS IN PLACE AND SUPPORTED BY COUNCIL’S PROGRAMS. |
The community Safety Plan
will address identified priority issues to improve safety and security across
the City. Social and situational issues will be addressed. |
CONTEXT/ISSUES:
The Penrith Valley Community
Safety Plan has been in place since its adoption in December 2002. Council prepared the plan in conjunction
with the Centre for Regional Research and Innovation from the University of
Western Sydney. The Penrith Valley Community Safety partnership contributed to
the development of the plan.
The development of the plan
consisted of three main tasks including:
· The preparation
of the Penrith Valley Crime and Safety Profile.
· Reviewing the
existing Community Safety programs in Penrith City Council.
· The selection of
appropriate Community safety Strategies.
The plan was subsequently
endorsed by the NSW Attorney General Department as a Safer Community Compact
under Part 4 of the Act (Protection and Parental Responsibility 1997) from
December 2002 to December 2005. Council has recently endorsed that a 12-month
extension to the plan be sought from the Attorney General’s Department.
Overseeing the development
and implementation of the plan is the Penrith Valley Community Safety
Partnership. The Partnership is a committee of Council and members include
Councillors, Council Officers, Police, Business and Community Representatives
and representatives from State Government authorities.
The objectives of the
partnership are to:
· Identify
Community Safety Issues and develop and prioritise strategies to combat these
issues.
· Integrate the
concept of community safety throughout the member organisations and the city.
· Monitor the
implementation of and review on a regular basis the Penrith Valley Community
Safety Plan.
The Community
Safety Plan was developed to address five key areas. They include:
1. Personal Safety: All forms of
personal safety with particular emphasis on Domestic Violence.
2. Antisocial Behaviour: Malicious damage, assault and offensive conduct.
3. Fear of Crime: Fear of crime in Penrith
particularly including the perception of drug usage
and assault
4. Issues Affecting People
and Places: Community safety issues that
are specific to different
locations and different communities.
5. Theft of or from a
Vehicle: Theft of or from vehicles in
CBD precincts and related car parks.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The current
Community Safety Plan was adopted as a Community Safety Compact by the NSW
Attorney General's (AG's) Department in December 2002 and was due to expire in
December 2005. Council approved an
application to the AG's Department for a 12-month extension of the plan and
this was accepted by the AG's in late 2005.
A round of
Community Consultations will commence in April for the development of the new
Community Safety Plan, incorporating emerging trends and issues to be addressed
for the city, during the period December 2006 to December 2009.
The Penrith
Valley Community Safety Partnership, a committee of Council, has proven to be
successful in building on partnership approaches to crime prevention and community
safety issues across the Local Government Area. A number of new initiatives have been developed in the first two
quarters of 2005/06 to address strategies contained within the plan. These include "Report It - Don't Ignore
It", formation of the Partnership sub group to develop a Penrith Citywide
Graffiti Minimisation Strategy and the implementation of Alcohol Free Zones in
a number of locations across the city for a three-year period.
A number of
existing strategies continue to be supported including Domestic Violence
Information Stand and Website; Graffiti Removal Information Pack; HOST's Pack
(safe party pack) and Park Smarter campaigns.
Funding bids were submitted to both the NSW and the National Attorney
General's Departments for new projects.
Funding was also received from the Nation Motor Vehicle Theft Reduction
Council to implement "Operation Bounce Back".
*****
ISSUE 12: MAGNETIC
PLACES (DS)
Longer
Term Goal: Town Centres, local centres and community meeting places are attractive and vibrant.
DIRECTOR COMMENTS ON THIS
ISSUE:
The goal of this
program is for town centres, local centres and community meeting places to be
attractive and vibrant. This program is
linked to the development and refinement of the Penrith City Centre and St.
Marys Town Centre Strategies currently on public exhibition. These draft strategies include a range of
revitalisation initiatives, some of which also emphasise partnerships with City
business groups and the broader community.
Presentations to
a wide range of stakeholder organisations in both Centres have taken
place. This body of work (with further
research) will lead to an accepted strategic direction for those Centres in
meeting Council’s aim for them to be appealing places for people. There are also linkages between this Issue
and Issue 13, Established Neighbourhoods.
Through an agreed and staged program of revitalisation, improvement and
enhancement local centres and community meeting places will increasingly become
magnetic places and attractors for community activities and capacity building.
Marketing
initiatives and a range of physical improvements have been delivered to a
number of community neighbourhood centres.
These are felt to have assisted in raising the awareness and usage of
the City’s neighbourhood facilities.
The time ahead
will focus on participating in Neighbourhood Centres Week, continuing capital
improvements at selected centres, supporting and contributing to a number of
community events and planning and delivering Council’s program of events.
TERM ACHIEVEMENT 12.1 (CDM) |
PENRITH CITY CENTRE AND ST
MARYS TOWN CENTRE ARE APPEALING PLACES TO PEOPLE SEEKING SATISFYING SOCIAL
AND CULTURAL EXPERIENCES. |
The City's Centres should
be vibrant and exciting places that provide residents, visitors and workers
with a range of different experiences.
The Centres should provide places and areas to meet friends, for
recreation and contemplation, for entertainment and leisure, for business activities
and work. They should reflect the
diversity of the City's communities and be welcoming for all. This will be achieved through engaging the
City's communities in cultural and other planning processes to establish a
shared identity and integrated vision for the Centres. |
CONTEXT/ISSUES:
This Term
Achievement recognises that the social and cultural elements of the City’s two
major Centres (Penrith and St Marys) are vital to their vitality and long-term
economic viability.
The Cultural
Planning Framework will assist Council and the community in defining the
‘Penrithness’ of the City Centres.
Penrith’s culture is more than the arts; it is about a lived experience
of Penrith’s places and time. The
Cultural Plan will focus on what is special about Penrith/St Marys and its
people and how its past and present can inform its future. What is distinctive
about Penrith and St Marys is then a potential resource for the development and
regeneration of the Penrith City Centre and the St Marys Town Centre.
This Term Achievement is
supported by other elements of the Strategic Program, in particular, the
completion of the expanded Joan Sutherland Performing Arts Centre and its new
programs, and the development of the Cultural Precinct at St Marys. These places will offer cultural experiences
to residents and visitors in those two major business centres.
The City Centres’
Review process will enable the development of a framework to guide the future
direction, role and operation of the Penrith City Centre and St Marys Town
Centre. The Review formally commenced
in December 2003, and is expected to be at least a two-year project, with draft
planning controls prepared by December 2005.
The Review has
been divided into two stages, with the first stage identifying the existing
situation regarding the land use, economic and social systems in each Centre,
and broad community and key focus consultations. There have been separate
Visioning Workshops for Penrith and St Marys, involving interested community,
business and other key stakeholders.
The second stage has involved further detailed analysis, and the
development of Strategies, together with draft planning controls, for each of
the Centres.
The Strategies
will position Penrith City Centre as the principal retail, commercial, cultural
and social centre of the City and a key focus within the region, and will
identify both Centres as vibrant, attractive and safe places to live, learn,
play, shop, socialise, visit and conduct business.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
As part of the
Social Services and Community Organisations Accommodation Needs Strategy
consultations have occurred with over 120 community and cultural organisations
that are located in the St Marys Town Centre and Penrith City Centre. With
other research being undertaken by the consultants these consultations will
assist Council in developing a strategic response to ensuring that the two
Centres continue to fulfil their vital social service and capacity building
role. Council has given presentations
on the Centres Strategies to the stakeholder business groups in the two Centres
including the St. Marys Town Centre Association and the Penrith City Centre
Association. Discussions have also been held with the Penrith City Centre
Association on enhancing the appearance of the retail and service precincts
through improved signage, street furniture, and graffiti management.
*****
TERM ACHIEVEMENT 12.2 (FOM) |
LOCAL CENTRES, COMMUNITY
MEETING PLACES AND PROMINENT MEETING PLACES ARE INCREASINGLY VALUED AND
RECOGNISED BY COMMUNITIES AS A FEATURE OF THEIR NEIGHBOURHOODS, OR AS A
FEATURE OF THE CITY. |
Regular community
celebrations occur in our prominent meeting places. This will be achieved with the support of local business
owners, community groups and residents. |
CONTEXT/ISSUES:
Local community precincts
which often include a community centre, shopping facility and schools are
considered the central focus for local residential areas.
As a consequence of society
today and pressures upon us they are sometime not valued and utilised as much
as they may have been when first established.
Other contributing factors such as a change in the demographic makeup of
local suburbs can impact on usage levels of some centres.
These community
hubs are only effective with the participation of local residents. Under optimum operating conditions these
community hubs can have a positive economic, social and cultural impact on the
surrounding communities they serve.
Central to this is the
ability of facilities to meet identified needs of local communities. This can be achieved by coordination of a
range of community development programs, services and facilities within those
neighbourhoods.
The management structure
chosen for a particular centre will depend on local circumstances including the
willingness of councils, service providers, community organisations and
individuals to be involved in management. There is no perfect management
structure suitable for all Centres. The needs of the local community will
change over time and may require changes in management arrangements.
The management structures
should encourage wide user and community involvement while allowing for
sufficient service provider and council support.
This can all be achieved by
supporting and promoting events at neighbourhoods, by improving communication
with the community and by highlighting the value of these facilities. There is
also the need to actively recruit local community managements committees and
ensure adequate training and support is provided. Seek out opportunities for volunteers.
Events and
celebrations are becoming an important part of Council and the community’s
calendar. The provision of dedicated resources to securing and promoting events
has resulted in a growing program of events taking place within the city and
the development of strong networks with a range of sporting, cultural and event
organisers.
Increased community
expectations that Council will take a lead role in the number and quality of
events within the City, which include those where Council has a coordinating
role and those which are supported by Council but led by others.
Drawing from its experience
from the 2000 Olympics, the city is becoming better placed to respond to major
events. The new and planned sporting
and cultural venues are equipped to accommodate high quality events of national
and international significance.
Council will need to
position itself to resource this challenge.
The development of a coordinated approach through the development of an
events strategy is required.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Successful,
effective and vibrant community hubs can only be achieved with the active
participation of the local residents with local meeting places. A scope of physical improvements at a number
of targeted community centres has been completed. A structured marketing program has been introduced. Both these initiatives have resulted in an
increased profile, awareness and usage of the City's neighbourhood
facilities. Events, festivals and
celebrations are an important element of the City's communities well
being. Council officers continued to
support those community lead occasions held during this period, e.g. Penrith
Valley Festival and St Marys Spring Festival.
Further support, assistance and advice have been provided to a range of
smaller more localised community events.
*****
ISSUE 13: ESTABLISHED
NEIGHBOURHOODS (DS)
Longer
Term Goal:
Established neighbourhoods are revitalised and people have pride in the community in
which they live.
DIRECTOR COMMENTS ON THIS
ISSUE:
This program has
a goal to revitalise established neighbourhoods to ensure that people have
pride in their community, the place they live in. There is a particular and focussed initiative underway in
achieving an integrated ‘whole of organisation’ approach to this issue. The issue involves a significant number of
Departments in terms of their particular outcomes and deliverables. The program strives to achieve an equitable
provision of facilities and services throughout the City. There is a recognised disparity between
facilities and services available to longer established neighbourhoods compared
to the most recently developed release areas.
This program relies heavily on the development and support of strong
enduring partnerships with principal stakeholders, ongoing consultation with
the community, and Council leadership to deliver the program.
It is relevant to
note the successful partnership with Department of Housing that has delivered
benefit to the communities of Cranebrook and North St. Marys in recent
times. For example, the Department of
Housing has made a significant financial contribution to the new North St.
Marys Neighbourhood Centre opened in August 2005. This partnership is ongoing and will identify further joint
neighbourhood renewal initiatives in the City.
As part of the current review of the Neighbourhood Renewal Program a
Policy Framework applying to the present program areas will be presented to
Council in the time ahead. In addition
the proposed actions identified in the Framework will significantly advance
Council’s response to this Issue.
A major City
Youth Week festival will be held in Cranebrook in April. This complements a range of other
partnership initiatives over the last six months in both Cranebrook and North
St. Marys. The benefits and improved
social outcomes that can be delivered to a particular community/neighbourhood
by all stakeholders working together in an integrated and committed way are
clear.
TERM ACHIEVEMENT 13.1 (CDM) |
ESTABLISHED NEIGHBOURHOODS ARE REVITALIZED AND PEOPLE HAVE PRIDE IN
THE COMMUNITY IN WHICH THEY LIVE. |
This program will include
a policy framework that identifies Council or Government responsibility for
the adequacy of infrastructure, community safety, social services and
facilities. |
CONTEXT/ISSUES:
The Neighbourhood
Renewal program has been developed as a planned response to what Council
identified as the increasing disparity between the infrastructure and services
available to support local communities in the older established suburbs of the
City compared to that available in the release areas developed since the
1980s. The availability of Section 94
funds has obviously contributed to enhanced local infrastructure in new release
areas.
The Program has been in
place for five years and in that time has achieved considerable outcomes for
residents in the Cranebrook and North St Marys areas. These outcomes have
focused on infrastructure improvements as well as bringing an enhanced
co-ordination of response to social issues. There are still a number of
identified actions to be progressed in these two areas.
Some results have been
achieved in the Werrington/Cambridge Park area particularly with regard to the
Shopping Strip Improvement Program, community safety audits and improvements
and other physical infrastructure work but the future of that particular
initiative is unsure pending the finalisation of the policy and research
framework for the Neighbourhood Renewal Program.
A challenge for the
Neighbourhood Renewal Program has been understanding and measuring the impact
of the initiative undertaken as well as developing a clear plan for
implementation and completion. Some
overseas experience indicates that in particularly disadvantaged areas, a
neighbourhood renewal focus and its related physical, employment and social
components, may be required for between 5–20 years. The British model for
‘neighbourhood regeneration’ states that an aim of the program is that no one
should be disadvantaged by where they live.
Clearly Council does not
have the resource capacity to continue to engage in further areas without a
clear exit strategy in the areas already underway.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The Neighbourhood
Renewal Program evaluation is well advanced and will provide Council with a
strategic approach to responding more effectively to the particular needs of
the established areas of the City. In particular the evaluation will also
provide clear directions on the Neighbourhood Renewal Program for the duration
of the current Strategic Program. The evaluation will be presented to Council
in the third quarter of 2005/06.
Enhanced public
domain maintenance responses continued to be delivered in North St Marys and
Cranebrook. Resealing of laneways and new footpath and kerb and gutter were
also completed around the new North St Marys Neighbourhood Centre. Neighbourhood Renewal work continued in
North St Marys and Cranebrook. The new
North St Marys Neighbourhood Centre was opened by the Mayor of the day,
Councillor Jackie Greenow. Enhanced
local service provision commenced in the period with local youth activities,
outreach counselling and related support provided by St Marys Community Health
Centre, and enhanced family support programs.
Council’s Mobile
Playvan is also providing a service one afternoon a week with high levels of
utilisation. The Centre was also
successful in receiving a CDSE grant for a playground at the new Centre. The
Centre's preschool also received support from Council to purchase resources for
children from a culturally and linguistically diverse background. In Cranebrook support has been provided to
local partners in developing a business plan for the Metropolitan Technology
Centre (MTC). The MTC was also nominated by the Department of Housing for a
Premier’s Public Sector award. Assistance was also provided to the Aboriginal
Youth mentoring project in Cranebrook High, the Phoenix family group, the
Fusion Youth Xmas party BBQ, and the Koori Mums support group. The Neighbourhood
Advisory Board also achieved the reintroduction of evening bus services through
the estate.
*****
ISSUE 14: MANAGING
DEVELOPMENT (DCP)
Longer Term
Goal: Quality
outcomes are achieved in the redevelopment of our
established suburbs and local centres.
DIRECTOR COMMENTS ON THIS
ISSUE:
This issue is seeking
quality outcomes in the redevelopment of established areas and local
centres. Council has commenced a
two-year program of review and consolidation of the City’s planning controls
and strategies. Relevant to this issue
a review of the Council’s current Residential Strategy will be conducted. This will commence in October 2006. Amongst other things, it will review the
extent to which redevelopment has created affordable, satisfying, safe and
sustainable living environments and cohesive communities. Consultation with residents, developers and
government agencies will be key elements of the Residential Strategy Review.
Further residential analysis
and study is planned to occur later this year.
Council is also participating in the Sub Regional Planning framework
process, which will define the quantum and form of housing that the City will
be asked to deliver under the Metropolitan Strategy.
The research undertaking by
Bill Randolph and presented to Council in August 2005, provides demographic and
household formation trends, together with over viewing residential development
patterns since the adoption of current housing policies.
Further analysis of urban
development trends and census data is being facilitated by Council’s
acquisition of new demographic profiles for the City.
The Neighbourhood Renewal
Program Review has been substantially completed. Its findings and the recommendations for a more integrated
approach to local level place management of established areas are being
examined.
A project which will trial
new approaches to urban redevelopment is being developed as an outcome from the
Council’s partnership with the Department of Housing. This approach will see the development of a Masterplan for
revitalisation of the physical and social environment of the Glossop Street
precinct.
TERM ACHIEVEMENT 14.1 (DAM) |
REDEVELOPMENT OF EXISTING
AREAS CONTRIBUTES TO SAFE, SUSTAINABLE, AFFORDABLE AND SATISFYING LIVING
ENVIRONMENTS AND COHESIVE COMMUNITIES. |
This will be achieved by
supporting community structures and engaging the community in the design of
new neighbourhoods with agreed levels of services and facilities. |
CONTEXT/ISSUES:
The City has undergone
significant redevelopment in recent years following the adoption of the
Residential Strategy in 1997. Whilst this redevelopment of existing
neighbourhoods is in accordance with the strategy, its pace has been faster
than anticipated. Communities in areas such as Werrington, Cambridge Park and
Oxley Park have raised strong concern about the impact and extent of this type
of development.
Whilst the residential
strategy development included extensive consultation, anecdotal evidence
suggests that there is limited understanding in the community of its
implications. Residents have regularly raised concerns about the impact of
in-fill development, particularly the higher densities, and claim to have no
knowledge of the residential strategy. The recent review of the villa style development
policies reflected this with forum in excess of 100 residents all claiming no
knowledge of the strategy.
This term achievement
significantly incorporates the need to work in partnership with the local
community to foster understanding of the reasons why established areas are
re-developing. Ongoing engagement with communities in suburbs zoned for
redevelopment is proposed. This will not only involve explanation of the
context and importance of redevelopment in the overall growth of the City, but also
input into social and cultural strategies that will support these communities.
The proposed social and
cultural strategies should respond to the social and related needs of the
established as well as more recently arrived residents. Given that medium density housing usually
has higher proportions of rental households than detached housing, leading the
development and implementation of social capital building initiatives is an
ongoing challenge.
To assist the defining and
developing of the social/cultural strategies, it is important that Council have
an enhanced understanding of the demographics of households who occupy the
newer medium density housing. This
includes household composition, tenure, length of occupation, where the
household has moved from, principal reason/s for moving, and the next likely
lifestyle/housing choice.
This additional targeted
research would also inform the preparation of a new Residential Strategy. It is important that the development of the
strategy is informed by consultation but also be grounded in the dynamics of
population growth, demographic change, household choice and the renewal of
aging housing stock. Council’s goal of
supporting cohesive communities is also a key consideration.
The development and
implementation of responsive and creative place-based social and cultural
strategies is heavily dependent upon successful partnerships with both
government agencies and local community, cultural and youth development
organisations. In some cases Council’s
priorities may not match those of its potential partners.
Currently there are no
resources to support the delivery of cultural strategies.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
An initial
consultation has occurred with the first of a series of anticipated meetings
with residential progress associations. A program of consultative meetings will
need to be developed to engage other community and resident associations to
assist in the delivery of this task.
The research
undertaken by Bill Randolph and presented to Council in August indicates that
increasingly new household formation will be characterised by fewer people.
This finding will assist in the review of the Residential Strategy. The
Randolph research also recommends a more "fine-grained" approach will
be needed to planning the City's future including in redeveloping residential
areas to ensure that the diversity and sustainability of housing types and
communities is actively facilitated.
The web-based
demographic profiles developed by Profile.id for Council provide a more
accessible series of suburb data profiles to Council staff and the broader
community. This initiative will assist Council in continuing to monitor aspects
of urban development and make the appropriate responses as 2006 Census data becomes
available in 2007.
The Neighbourhood
Renewal Program Review being undertaken by Elton Consulting has identified that
to achieve Council's Strategic Program in relation to the established areas of
the City additional focus in Council's services will be required. This will be
reported to Council in the third quarter.
Council continues
to support the work of the Neighbourhood Advisory Board in Cranebrook and to
assist in establishing a Service Providers Network covering the older suburbs
of Kingswood, Kingswood Park and Penrith.
TERM ACHIEVEMENT 14.2 (DAM) |
NEW HOUSING IN ESTABLISHED
AREAS IS COORDINATED BY COMPREHENSIVE NEIGHBOURHOOD PLANS DEVELOPED IN
PARTNERSHIP WITH THE LOCAL COMMUNITY AND DEVELOPMENT INDUSTRY. |
That will be supported
through fostering of improved communication with local communities to
facilitate understanding of the reason for planning for diversity of housing
choice. |
CONTEXT/ISSUES:
The extent of
redevelopment in many suburbs has caused great concern to existing communities.
In some cases the redevelopment has been ad hoc and inconsistent with the
existing streetscape and character of some neighbourhoods.
The impact of residential
duplication in the established areas has resulted in a decline in overall
amenity and seen new development lack innovation. Piecemeal development does
not related to other land and stifles connectivity and a more structured
approach to residential infill which seeks to achieve the better urban
communities, stronger links with the strengths already established in the local
areas and a sense of identity that is easy recognizable to the community.
Council has requested a
better approach for existing neighbourhoods that are being redeveloped. It is intended to develop a clear set of
guidelines that will shape and guide new development so that existing areas are
not simply transformed into more of the same but take on character that is
representative of the real strengths and introduce sound urban design outcomes.
The character of Penrith is
made up of a mixture of smaller neighbourhoods and communities. In order to
develop neighbourhood plans that identify the individual strengths and desired
outcomes of these areas a concerted consultation process will be required.
The development of
neighbourhood plans in partnership with the local community and other
stakeholders to coordinate redevelopment is proposed. This will elevate the
planning of neighbourhoods zoned for the residential use to a more defined
level. Neighbourhoods will need to be selected based on priorities to be
established and on partnership opportunities that arise. The development of a neighbourhood plan
approach should run in tandem with the Citywide Local Plan process and delivery
of a Citywide Development Control Plan.
There is a need for these neighbourhood plans to be given statutory
credibility to assist in implementation.
The initial target area is
the precinct between the St Marys CBD and Glossop Street. The Department of
Housing has significant ownership in this area and has indicated a willingness
to form a partnership. Cambridge Park is another area identified as a priority
because of high levels of community concern about recent development.
When
neighbourhood plans are finalised there will be a need for ongoing monitoring
and refinement to ensure objectives are met.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council met with
the Department of Housing (DoH) in January, which was in response to the
Memorandum of Understanding set up with Council and DoH. There was acceptance that DoH and Council
collaborate on the physical and social environment of the Glossop Street
precinct with the view to developing a masterplan. It was agreed that working groups would set up between Council and
DoH, which then report on to the Steering Committee.
*****
ISSUE 15: NEW
RELEASE AREAS (DCP)
Longer Term
Goal: New
areas provide well planned, serviced and cohesive
living and working environments.
DIRECTOR COMMENTS ON THIS
ISSUE:
Considerable effort has been
directed toward planning for the City’s ten new urban release areas. Development is occurring in the Erskine Park
Employment Area, Waterside and Claremont Meadows Stage 2. The other areas continue to advance through
their planning phases.
Council’s Strategic Plan
defines our aspirations for the new release areas. Sustainable, safe and
satisfying living and working environments are being planned. This requires detailed investigations and
study. This work, together with
‘cooling’ of the housing market and the complexity of co-ordinating
multi-ownership estates, has slowed the release of new allotments.
Council has set new
benchmarks have been set for Release Areas’ sustainability, and one of the
consequences is that government authority’s and other’s policies or strategic
positions do not yet align with this i.e. there are challenges in designing for
water recycling and telecommunications innovation in release areas. These difficulties are being pursued with
agencies.
Equally, new approaches are
being taken to Release Areas’ job supply.
Employment and economic development strategies are being developed for a
number of the estates. Valuation of
jobs and the movement of that value into off-site employment initiatives is a
new area of investigation.
Housing strategies are being
informed by the research work Council has undertaken to define the demographic
profile of the future. Developers are
being challenged to cater for the housing needs of the future as distinct from
what is marketable today.
Council has advocated, in
its submissions to recent metropolitan planning policies, for a documented and
funded government infrastructure strategy which addresses the needs within the
City. These needs emerge as a result of
our own growth and that in adjoining areas.
Infrastructure delivery
plans are being developed for each release area. Regrettably, Council has been unsuccessful to date in achieving a
government commitment to a number of key infrastructure items ie UWS Rail
Station, the Erskine Park Employment Area Link Road and the Werrington
Arterial.
TERM ACHIEVEMENT 15.1 (EPM) |
COHESIVE COMMUNITIES ARE
FORMED BASED ON SUSTAINABLE, SAFE AND SATISFYING LIVING AND WORKING
ENVIRONMENTS. |
This will
require a more comprehensive addressing of social, economic and environmental
issues and will be influenced by a mix of housing, infrastructure facilities
and services that are delivered to meet the needs of diverse neighbourhoods. |
CONTEXT/ISSUES:
Council’s urban
release area program currently comprises nine urban release areas, a strategic
employment precinct (the Erskine Park Employment Area (EPEA)) and an education
precinct (Werrington Enterprise, Living and Learning (WELL) Precinct) in the
Penrith LGA. These release areas and
precincts play a vital role in providing more residential housing and
employment lands in Penrith.
Council completed a
Residential Strategy for the City of Penrith in 1997, which was favourably
received by Department of Infrastructure, Planning and Natural Resources
(DIPNR). It confirmed that that our
expected population growth for the following 20 years (some 45,000 people) can
be accommodated within existing and currently planned release areas, without
resorting to new residential areas located in outer lying rural precincts.
The Residential Strategy
identified the need to provide in the order of 20,000 new homes to house the
City’s population growth over this time.
It proposes that some two-thirds of new home, around 13,000 dwellings,
would be accommodated in new release areas, a number of which are included in
the Government’s Metropolitan Development Program.
We are currently advancing
the planning for 10 new urban release areas across the City. Those are:
- ADI Site
- Penrith Lakes
- Lakes Environs
(Waterside)
- North Penrith
Army Land
- Werrington
Signals Site
- South Werrington
Urban Village
- Caddens Release
Area
- Claremont Meadows
Stage 2
- Glenmore Park
Stage 2
- Erskine Park
Employment Area
Council’s
Strategic Plan and the adopted Sustainability Blueprint for Urban Release Areas
outlines an approach to new release areas which seeks to form cohesive
communities based on sustainable, safe and satisfying living and working
environments. A priority for our planning for new release areas is to ensure
that they deliver quality urban environments and that they foster the
establishment of sustainable new communities.
The cohesiveness
of those communities will be established by taking a ‘triple bottom line
approach’ which focuses on and integrates the social, economic and
environmental imperatives. That will
draw together the core principles of long-term economic and social security,
delivering new job opportunities, providing a diversity of housing including
affordable housing, maintenance of intrinsic biodiversity and natural values, creating
quality and safe public domains which are designed for durability and
adaptability, ensuring the early delivery of community services and facilities
and working with those communities as they emerge to ensure important
interactions and structures are established and opportunities for cultural
development are pursued, reducing resource consumption and minimizing waste,
saving water and energy. This will necessarily focus our planning response on
the early provision of contemporary infrastructure, community services and
retail facilities.
Recent urban
growth management studies have confirmed the emerging complexity of Penrith’s
urban structure as the City matures. The next twenty years’ growth is predicted
to be at least as strong as past twenty years in terms of new housing. Penrith is not “settling down”, but will
continue to be a dynamic and growing community. Demands for high quality services will continue.
Critical to this term achievement is the
securing of services and facilities to meet the needs of those new communities.
This aspect has a strong interrelationship with TA’s 4.3, 4.4 and 5.1.
More certainty is required
to ensure the timely and effective delivery of appropriate physical
infrastructure, community services and facilities as those new release areas
develop. The securing of those strategies from developer/landowners at the
“front end” of the strategic planning process has however resulted in delays to
the implementation phase of the release areas concerned, due to intricate negotiations
with landowner/developers as well as government agencies in the securing of
optimal environmental, access, employment and housing outcomes.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council's Residential Strategy identified the
need to provide in the order of 20,000 new homes to house the City’s population
growth up to 2022. It proposes that
some two-thirds of new homes, around 13,000 dwellings, would be accommodated in
new release areas, a number of which are included in the Government’s
Metropolitan Development Program.
Council is
currently advancing the planning and delivery of 10 new urban release areas
across the City. Plans are complete and
development is now under way in Erskine Park Employment Area, Waterside (Lakes
Environs) and Claremont Meadows Stage 2.
North Penrith Army Land has been rezoned and the DCP adopted. The ADI Site REP has been gazetted and
comments recently made on its first amendment and we are finalising assessment
of the first development site in Penrith being the Dunheved Employment Precinct
Plan.
Penrith Lakes REP
amendment is being finalised for exhibition by DoP. An LEP and DCP have been adopted for the Werrington Signals
Site. Planning studies are commencing
for the South Werrington Urban Village and Caddens Release Area and the WELL
Precinct studies are nearing completion.
A draft LEP is under preparation for Glenmore Park Stage 2. Design processes have advanced for the new
Glenmore Park Child and Family Precinct and the extensions to the existing
Claremont Meadows Community Centre to provide for new social services to
support communities in those areas.
*****
TERM ACHIEVEMENT 15.2 (EPM) |
STRATEGIES ARE IN PLACE FOR
NEW RELEASE AREAS TO DELIVER JOBS THAT MATCH INCOMING WORKFORCE PARTICIPANT
NUMBERS. |
This will be
achieved through implementation of employment strategies for each release
area. |
CONTEXT/ISSUES:
Council has
pursued a range of strategic opportunities to foster economic development and
create new job opportunities for our community.
In
planning for new release areas, localised opportunities for employment are
being pursued to create economic well being, socially cohesive communities and
to minimise the need for commuting – especially car-based. Council’s policy is for new jobs, both on
and off-site, to be created which at least match incoming residential workforce
participants in each release area. Local /home-based employment enriches the
community and family lifestyle through giving reason for local goods and
services, social interaction and hence a vibrant living community.
Council’s urban
release area program currently comprises nine urban release areas, a strategic
employment precinct (the Erskine Park Employment Area (EPEA)) and an education
precinct (Werrington Enterprise, Living and Learning (WELL) Precinct) in the
Penrith LGA. These release areas and
precincts play a vital role in providing more residential housing and
employment lands in Penrith. The
opportunity exists for each of the release areas to create different employment
goals and opportunities given the local circumstances, the commercial
activities which are being planned in them, their geographic location and their
unique characteristics and settings.
That will require emphasis to be placed with the strategic direction
each release area Employment Strategy enunciates and identifies as the focus
for job delivery.
Council is
mindful of the need to facilitate new and expanding employment opportunities as
far as its responsibilities allow. In
new urban release areas Council’s policy is that employment and economic
activity occurs in a sustainable fashion, and is balanced with social and
environmental objectives.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council’s policy
is for new jobs, both on and off-site, to be created which at least match
incoming residential workforce participants in each release area. Local /home-based employment opportunities
are being pursued in these new urban developments to enrich community and
family lifestyle. Employment and
economic development strategies are currently being pursued for Glenmore Park
Stage 2, the ADI Dunheved Employment Precinct and the WELL Precinct to increase
the local job to workforce ratio.
*****
TERM ACHIEVEMENT 15.3 (EPM) |
NEW RELEASE AREAS PROVIDE
FOR A DIVERSITY OF HOUSING OPPORTUNITIES, INCLUDING AFFORDABLE HOUSING,
CONSISTENT WITH EMERGING COMMUNITY NEEDS AND WHICH FACILITATES THE
DEVELOPMENT OF DIVERSE NEIGHBOURHOODS. |
This will
require partnerships with the development industry and key Government
agencies to determine the emerging housing needs and to effectively plan for
and deliver a range of housing options to effectively respond to those needs. |
CONTEXT/ISSUES:
In the planning for our new release areas, we are
seeking to create diverse communities by providing a range of lot and housing
types across a site, to provide a range of housing which can be adapted over
time to meet changing household requirements, such as aging population, to
provide opportunities for density and mix of uses that reduce car dependency
and promote efficient land use and to provide affordable housing opportunities
across the site.
Council’s urban
release area program currently comprises nine urban release areas, a strategic
employment precinct (the Erskine Park Employment Area (EPEA)) and an education
precinct (Werrington Enterprise, Living and Learning (WELL) Precinct) in the
Penrith LGA. These release areas and
precincts play a vital role in providing more residential housing and
employment lands in Penrith.
Recent research conducted by Bill Randolph’s Urban Frontiers Group
highlights the changing demographics of our current and future
communities. That body of work
identified the need to provide continued housing supply and to ensure that new
housing is diverse and adaptable and meets the needs of the community. New housing should recognize the trend for
reduced household sizes and the continuing increase in one and two person
household formation. Importantly, the
Randolph work also identified a growing geographic segregation of the
population across the city on the basis of household type. This has been largely driven by
concentrations of higher density of housing around town centres and transport
nodes and the high proportion of those dwellings in the rental market. Importantly, a spread of housing densities
across new urban areas will be required to reduce the propensity for social
polarization.
The Randolph
study also acknowledged the relatively ‘affordable’ housing market Penrith has
enjoyed compared to other parts of Sydney, however our city is not immune to
continuing growth pressures and the economic up-swing which has lead to
pressures on the existing property market.
A quotient of affordable housing is being sought for each new release
area, to at least a minimum of 3% of all residential allotments being proposed
in an estate. This housing provision is
not limited to social housing, but also other lower cost housing which would
appeal to a wide cross-section of future communities.
Adaptable housing designs are encouraged which cater for household
change over time and to provide a range of dwelling densities/locations that
facilitate walking and cycling and reduce car dependency. Home-based business
opportunities should also be optimised.
A range of partnerships with key agencies such as with the recent MOU
entered into with Landcom and the Department of Housing afford an opportunity
for new housing models to be established in the City which can benchmark new
ways of meeting the community’s changing housing needs. The HIA and UDIA are
also potential partners in such projects.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Housing
strategies that reflect a diverse housing mix to meet the projected demographic
profile of our future urban communities are being prepared for Glenmore Park
Stage 2, including affordable housing opportunities. Housing opportunities are being explored in the WELL Precinct and
discussions have continued with PLDC in regard to the opportunities Penrith
Lakes will hold for a variety of quality housing forms. Housing strategy, including siting and
design guidelines has been adopted for the Waterside (Lakes Environs)
development which is now underway.
TERM ACHIEVEMENT 15.4 (EPM) |
TIMELY DELIVERY OF SERVICES
TO NEW RELEASE AREAS IS BEING SECURED. |
This will be
achieved through the formulation and implementation of infrastructure
delivery plans for each release area with assignment of responsibility to
either Council, Government or the development sector. |
CONTEXT/ISSUES:
Recent urban
growth management studies have confirmed the emerging complexity of Penrith’s
urban structure as the City matures. The next twenty years’ growth is predicted
to be at least as strong as past twenty years in terms of new housing. Penrith is not “settling down”, but will
continue to be a dynamic and growing community. Demands for high quality services will continue. These are responded to at Term Achievement 4.3,
4.4 and 5.1 in the wider city context.
The Residential Strategy
identified the need to provide in the order of 20,000 new homes to house the
City’s population growth over this time.
It proposes that some two-thirds of new home, around 13,000 dwellings,
would be accommodated in new release areas, a number of which are included in
the Government’s Metropolitan Development Program. We are currently advancing the planning for these areas across
the City. The remainder, around 7,000
dwellings, is proposed to be provided within established urban areas, including
a number of town centres.
Council’s urban
release area program currently comprises nine urban release areas, a strategic
employment precinct (the Erskine Park Employment Area (EPEA)) and an education
precinct (Werrington Enterprise, Living and Learning (WELL) Precinct) in the
Penrith LGA. These release areas and
precincts play a vital role in providing more residential housing and
employment lands in Penrith.
Council’s adopted
Sustainability Blueprint for Urban Release Areas establishes a priority for the
planning of new release areas to ensure the delivery of quality, sustainable
urban environments and cohesive communities.
This will necessarily focus our planning response on the early provision
of contemporary infrastructure, social services and retail facilities to match
the community’s needs as it grows.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
This Term
Achievement will be achieved through the formulation and implementation of
infrastructure delivery plans for each release area with assignment of
responsibility to either Council, Government or the development sector. Plans are currently being prepared for
Glenmore Park Stage 2 release, Penrith Lakes and ADI Dunheved Employment
Precinct.
Major
infrastructure is establishing in Erskine Park Employment Area, including the
Lenore Lane upgrade which is scheduled to be complete in April next year. Unfortunately, Council has not been
successful in persuading Government to commit to its share of funding in
relation to the delivery of major transport facilities and Council will need to
continue to lobby for these outcomes.
Importantly, social infrastructure to support emerging communities must
also be delivered in a timely manner and in this regard plans are advancing for
the upgrades of child care centres at Cranebrook and Erskine Park, with
construction commenced at the Grays Lane Centre. Investigations on social facility requirements for a number of
the major release areas are also advancing.
*****
THIS PAGE IS INTENTIONALLY LEFT BLANK
THE CITY IN ITS ENVIRONMENT
The natural environment
which all people share provides the fundamental resources for life – air,
water, energy, land and biological diversity. The City of Penrith like all
major human settlements, impacts on those natural systems.
Penrith Council’s charter
inv sts it with a duty to act as a custodian of the local environment.
That environment is complex
comprising natural, rural and urban elements. To secure the City’s sustainable
future these must be managed in a balanced way that adds to its quality of life
and economic productivity, without depleting those critical natural systems or
the City’s natural and cultural heritage.
The City has several
particularly significant environmental assets that require special care and
attention. The Nepean River runs through the City. It contains a critical
component of the river’s catchment, including areas of bushland that contain
much of the Sydney region’s original biodiversity. The health of the Nepean is
crucial to a sustainable Sydney region.
Council will act to protect
the catchment by how it conducts its own activities, how it regulates the
activities of others and through its advocacy to secure a comprehensive plan
for the catchment’s management, prepared and supported by communities, business
and government acting together.
Penrith’s built environment
continues to expand. That must happen without harm to the local environment.
The best knowledge and techniques must be employed in a carefully managed way
to ensure this.
The rural areas of the City
must contribute to the character and appeal of Penrith Valley. Their use and
development must not compromise that appeal.
Globally, the depletion of
non renewable resources, particularly water and fossil fuels, will impact on the
capacity of all cities and societies to function into the future. Proper
management of these resources must be addressed now. Council, in striving for a
sustainable City, will lead and influence its
communities, businesses and governments to adopt prudent, responsible energy
and water management practices. Council’s own programs and approaches will
provide leading examples to the City.
ISSUE 16: NATURAL
CATCHMENT ASSETS (DCP)
Longer Term Goal: Natural areas
are protected and rehabilitated as viable environments
and the Hawkesbury-Nepean River Catchment is restored to health.
DIRECTOR COMMENTS ON THIS
ISSUE:
Council has built and
maintained strong partnerships with the Hawkesbury River County Council and the
Hawkesbury Nepean Catchment Management Authority. The CMA is preparing a catchment action plan to direct and
prioritise ‘blueprint’ actions. Council
contributed to and commented on the action plan. It is becoming apparent, however, that greater and more urgent
attention is needed by all levels of government if the environmental wellbeing
of the City’s waterways is to be safeguarded.
There is insufficient
acknowledgement of the profound impacts to the River as a result of the cross
catchment transfer of river flows for use as Sydney’s water supply. This is severely compromising the health of
the river because of the compromised environmental flows.
Also, the distinct impacts
imposed by the metropolitan portion of the catchment are not sufficiently
recognised. There is a need for improved
regional responses as the river does not recognise local government
boundaries. All of these are suggestive
that different river management approaches might be warranted.
Under the enhanced
environmental program a diverse range of catchment management based activities
were undertaken. Bushcare and
stormwater works, environmental auditing, on-site sewerage management, water
recycling initiatives and release areas catchment planning are just some
examples. Greater focus has been given
to stormwater education to complement the stormwater infrastructure program.
Management of aquatic weeds
in the Hawkesbury/Nepean River remains a challenge. Council continues to fund weed management activities, support the
County Council and lobby for a long-term sustainable management response.
Good progress is being made
to restore areas of community bushland in accordance with detailed Plans of
Management. Council’s bush regeneration
staff have focussed on riverbank areas at Tench Reserve, Cassola Place, Knapsack
Creek and Werrington Creek. With strong
support from Council, bushcare volunteers continue to make good progress in the
restoration of other local bushland reserves.
A strong partnership has developed with Greening Australia who are
storing vegetation along the South Creek corridor and Werrington Creek.
A strong partnership with
Sydney Water is ensuring the effective delivery of the Wallacia/Mulgoa sewerage
scheme. Effective communication
strategies have ensured that the community is informed and ready for the
commencement of the scheme. Significant
health, environmental and social outcomes are expected as these communities
connect to the scheme in the next year.
Council has maintained its
strong support for the Western Sydney Alliance that continues to actively
campaign for an end to the reservation of Badgerys Creek airport site.
Compliance programs have
targeted illegal landuse activities that have significant environmental
input. Particular emphasis has been
given to controlling illegal clearing of vegetation and land filling of land in
rural areas.
Work has commenced to develop partnerships and long term strategies to
improve air quality in the region.
TERM ACHIEVEMENT 16.1 (EHM) |
THE CITY’S BIOLOGICAL DIVERSITY IS BEING
PROTECTED AND CONSERVED THROUGH THE IMPLEMENTATION OF A BIODIVERSITY
CONSERVATION AND BUSHLAND MANAGEMENT STRATEGY. |
This will involve appropriate management regimes for
natural areas and an engagement of the City’s communities in biodiversity
conservation and protection. |
CONTEXT/ISSUES:
A healthy natural environment is essential for healthy
communities. The natural ecosystems in
our environment provide the fundamental resources for life – air, water, land
and energy. Biological diversity (or
biodiversity) is also necessary to maintain the quality of the air and water,
to regulate climate, cycle nutrients, and assimilate wastes.
The City’s natural environment provides Penrith with a
unique character, and a variety of natural landscapes in which the urban and
rural areas have developed. The
publicly accessible natural areas are also very important to the City’s
residents and visitors, in pursuing a range of leisure activities.
Both urban and rural development affects the natural
environment, with urban development encroaching on existing areas of
biodiversity, taking over productive rural lands, generating more traffic, and
polluting waterways, the land and the air.
Rural development impacts on the natural environment primarily through
land degradation, pollution of the bushland areas and the waterways, and
encroaching on existing areas of biodiversity.
Future urban growth and development in the City,
combined with these current threatening processes, will continue to put
pressure on Penrith’s natural environment.
Biodiversity is under threat from loss and fragmentation of habitat
through clearance of native vegetation, the impact of pollutants, human impacts
on water resources, salinity and soil degradation, introduced species and
diseases, weed invasion, inappropriate fire regimes, and firewood collection.
Council adopted the Biodiversity Strategy in 2004, to
guide the protection and conservation of the City’s biological diversity. It is focused at the local government and
community level, with practical actions to achieve specific objectives.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
The conservation
and protection of biodiversity, and the effective management of natural areas
is a continuing activity. The
identification of a City-wide system of reserves has commenced, with the City's
significant vegetation areas now mapped.
Bushcare works continued, with a focus on Tench Reserve, Clissold
reserve, Bellbird reserve, and Werrington Creek, and community consultations
progressed for a plan of management for Weir Reserve. Council continues to have
a strong working relationship with local Bushcare and Landcare groups. The noxious weed eradication program for
Council's open space areas continued in conjunction with the Hawkesbury River
County Council.
*****
TERM ACHIEVEMENT 16.2 (EHM) |
THE HEALTH OF THE RIVER
SYSTEM IS BEING IMPROVED THROUGH THE IMPLEMENTATION OF A COMPREHENSIVE
CATCHMENT MANAGEMENT STRATEGY. |
This responds to the
delivery of improved water quality initiatives, community education programs,
the effective management of sewerage impacts, including sewering of rural
villages and advocacy for a coordinated approach to catchment management
consistent with the recommendations of the Blueprint. |
CONTEXT/ISSUES:
Council’s longer-term goal
is that “Natural areas are protected and rehabilitated as viable environments
and the Hawkesbury-Nepean River Catchment is restored to health.”
Council has
strong commitments to protect and restore the health of the Hawkesbury Nepean
River and its catchment in conjunction with other Local, State and Federal
Government agencies who share responsibility. The Hawkesbury Nepean is a river
of national significance, which is highlighted by the fact that it delivers 80%
of all drinking water for the greater Sydney Metropolitan area. It waters also
helps to generate 70% of the goods and services produced in NSW and agriculture
in the catchment generates in excess of $1 billion per year in revenue.
The health of the Hawkesbury
Nepean is in decline in many areas due to a number of factors including reduced
flows due to water extractions and the impacts of urban development and runoff.
The indicators of this include algal blooms, excessive growth of aquatic weeds
and reduced number of native fish stocks.
The primary response will be
through the delivery of Council’s Catchment Management Strategy. This strategy
was formed by the integration of the four main stormwater management plans for
the City, combined with the Catchment Blueprint for the river. This strategy
proposes long-term actions to improve the quality of stormwater and more
broadly the health of the Hawkesbury Nepean River. This strategic program will
target higher priority initiatives in the strategy. Effective monitoring of the
implementation of the strategy will be important.
A key delivery
platform is through the Enhanced Environmental Program (EEP), which is funded
by the special rate levy. This program provides a range of increased services
including stormwater infrastructure, bushland management, biodiversity protection,
sustainability initiatives, water health monitoring and educational programs.
This program is funded over a ten-year period until 2012.
The Catchment Management
Strategy also plays a key role in integrating all actions and activities by
Council and others that lead to overall improvements in the health of the
river. These actions include things such as maintenance of stormwater
infrastructure, street sweeping, the litter patrol, the RID Squad, education,
water conservation and erosion control compliance on development sites.
Aquatic weeds pose a
significant threat to the health of the River. Council will be challenged to
provide additional resources to this task and will need to work in partnership
with the Catchment Authority and the Hawkesbury River Country Council.
The better management and
delivery of improved sewerage services is needed to reduce the significant
impact of sewerage in the rural regions of the city. This will involve the full
implementation of Council’s on-site sewerage management strategy and lobbying
for services to be provided to rural villages. The communities of Mulgoa and
Wallacia will need assistance to ensure the early implementation of the
sewerage scheme by Sydney Water in these areas.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
A diverse range
of activities was undertaken that will collectively lead to improvement in the
health of the river and its catchment. The Enhanced Environmental Program (EEP)
is the primary delivery tool and funds many of the programs. Further stormwater
management plans have been developed based on detailed catchment audits and
subsequent benefit analysis. These have guided the priority for the
construction of stormwater infrastructure to treat and improve stormwater
quality. Other activities have included expanded water quality monitoring,
control of aquatic weeds, environmental assessment of businesses to minimise
pollution and creek rehabilitation work.
Council has
continued its strong partnership with the Hawkesbury Nepean Catchment Management
Authority and the Hawkesbury River County Council. Significant input has been
made into the development of a catchment action plan and river health strategy
by the CMA. The On-Site Sewerage
Management program has continued to reduce the impact of effluent disposal in
rural areas of the City via a
combination of both audits and education. The Wallacia/Mulgoa sewerage scheme
is well advanced. Council is working closely with Sydney Water to ensure the
early and effective implementation of the scheme with residents.
*****
TERM ACHIEVEMENT 16.3 (EHM) |
EFFECTIVE LANDUSE
MANAGEMENT POLICIES, REGULATORY PRACTICES AND CONTROLS ARE BEING IMPLEMENTED
TO PROTECT THE ENVIRONMENT. |
This will involve programs
that educate the community and which regulate development or activities that
have the potential to harm the environment, including dry land salinity, or
impact on air quality. |
CONTEXT/ISSUES:
Council’s longer-term goal
is that “Natural areas are protected and rehabilitated as viable environments
and the Hawkesbury-Nepean River Catchment is restored to health.”
A range of programs and
activities will be necessary to protect the City’s Environment. This will
involve the development and review of policy responses, regulatory controls and
education programs.
Priority needs to be given
to the completion of and implementation of a salinity management strategy.
Other important programs will include the auditing of commercial developments
for compliance with environmental standards, the continued campaign to prevent
a second Sydney Airport at Badgerys Creek and management of noise impacts.
Education programs need to
be enhanced to increase community understanding and engagements in protecting
the City’s environment.
Monitoring and reporting
will be an important aspect of this program. This includes the SOE report and
broader reporting initiates for a future State of Sustainability Report.
Air quality is known to be
poor in Penrith and Western Sydney in general. This strategic program compels
Council to take a more active role in strategies to improve air quality in
support of regional initiatives.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
A range of
programs was implemented focussing on improving the environment of the City and
raising awareness. Environmental assessments of commercial and industrial
premises were undertaken with the aim of preventing potential pollution and
promoting best practice environmental management.
Council remains
actively involved in the campaign by the Western Sydney Alliance to oppose the
potential second Sydney Airport at Badgerys Creek. The campaign has focussed on
having the reservation of the site removed from legislation to remove the
uncertainty for the community.
Initial research
has been undertaken as the first step in the development of strategies and a
framework to improve air quality in the region. This has included consultation
with other potential partners. The
sustainability education program has focussed on raising awareness about water
conservation and greenhouse gas emissions. Two new Sustainability Streets have
started including Blackwell Public School.
*****
ISSUE 17: SUSTAINABLE
RESOURCE MANAGEMENT (DCP)
Longer Term Goal: The City
conducts itself as a leading environmental practitioner
through prudent consumption o resources and reduced resource disposal.
DIRECTOR COMMENTS ON THIS
ISSUE:
This issue commits Council
to a leadership role in its actions and advocacy for sustainability
initiatives.
Pursuit of this ideal has
been exceptional with sustainability principles becoming increasingly embodied
in Council’s actions and practices.
A quarterly Management Plan
and Greenhouse Gas Reduction Plan were adopted in December 2005. These identified savings opportunities for
both Council and the community.
Auditing of the water usage patterns for Council’s buildings has
occurred and, using EEP funds, every Council building has been upgraded with
simple water saving devices. The next
phase involving the installation of more specialised water saving devices has
commenced.
Work commenced on the
development of water and energy savings plans.
These are in response to the Government direction. The Water Plan will deal with Council’s ten
highest water usage sites.
Work continued on the development
of Sustainability Indicators. These
will see sustainability integrated further into Council’s operations,
decision-making tools and the Strategic and Management Plans framework. A particular benefit emerging form the
Sustainability Indicators will be the community engagement opportunities which
emerge from the publication and transparent expression of our commitment to
sustainability.
Commitments to waste
reduction and sustainable practices in tendering and purchasing are also being
developed.
Council’s application to the
sustainability blueprint for urban release areas and BASIX at DA, subdivision
and plan-making phases are compelling developers to integrate environmental
initiatives into their developments.
By utilising the Eastern
Creek processing facility 48% of the City’s domestic waste collected by Council
has been diverted from landfill this year.
The planned March 2006 implementation of a co-mingled recycling service
will also improve the City’s recycling capacity.
TERM ACHIEVEMENT 17.1 (EHM) |
Water and energy conservation
strategies are being implemented |
Council’s commitment to
sustainability in managing its assets and through partnerships with key
government and development industry partners. |
CONTEXT/ISSUES:
Our ecological footprint is the impact our lifestyle
has on the earth’s natural resources.
It is based on the area needed to grow crops, the pasture land needed to
grow animal products, the forest to grow timber and paper products, seas and
estuaries to grow seafood and absorb pollutants, the bushland to absorb carbon
dioxide, the land needed to support roads and buildings, and the natural
resources such as air, water, and energy each person uses.
Human activities, particularly the burning of fossil
fuels, contribute significantly to the release of greenhouse gases. Households are responsible for the
generation of over half of Australia’s energy-related greenhouse gas emissions,
largely through domestic electricity use and motor vehicle use. The increasing levels of greenhouse gases in
the atmosphere are contributing to changes in global and local climate
patterns, global warming and rising sea levels.
Development is
affecting both the quality and quantity of our water, resulting in erosion,
pollution, exotic and noxious weed growth, evaporation rates, the amount of
water infiltrating to ground water, and a significant disturbance to the
ecological balance and the City’s local freshwater ecosystems. The impacts of climate change are apparent
in increasing times of drought across the country, and the decreasing rain
levels leading to a significant reduction in Sydney’s water supplies. Despite some limited ‘per capita’ reduction
in water consumption, overall water consumption increases concurrently with
continuing population growth and urban expansion.
Waste significantly affects the City’s natural
environment. Impacts of waste include
the environmental, social and economic impacts of landfill, the impacts of
littering on land and water quality, and the effects of illegal dumping (orphan
waste) on the City’s biodiversity.
Waste can pollute the land, air and water if not managed properly.
The volume of waste is a major pressure on
the environment, particularly in and adjacent to major population centres. It represents a significant and unnecessary
over consumption of resources. Disposal
of waste to landfill can result in the leaching of contaminates into soil and
groundwater, and the emission of unwanted gases into the air.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
A Water
Management Plan 'Water Way' and Greenhouse Gas Reduction Plan ‘Carbon Neutral’
were adopted by Council in December.
The Plans identify actions that the City's communities and the Council
can undertake to manage water use, reduce overall energy consumption and
increase the use of sustainable energy.
Energy and water conservation activities continue in response to the
'Every Drop Counts' program, and Council's Energy Performance Contract.
Intensive
preparations for the mandatory Water Savings Plan and Energy Savings Plan are
being carried out. Sustainability
Street and other education programs have assisted including an Energy Efficient
Light Globe Giveaway at the Civic Centre and through Council's Child Care
Centres. A partnership has been entered into with Ecosmart to look at water and
energy conservation within small to medium sized business within our Council
area. Lobbying has continued with Sydney Water for the development of a
recycled water scheme from Penrith STP.
*****
TERM ACHIEVEMENT 17.2 (WCPM) |
WASTE TO LANDFILL AND
INDISCRIMINATE DUMPING ARE SIGNIFICANTLY REDUCED AND RESOURCE RECOVERY IS
OPTIMISED. |
Need to examine reduction
of waste at source, increasing recycling component and use of technology to
convert waste to a useable product. Indiscriminate dumping can be addressed
by education, RID Squad and Council’s Rangers. |
CONTEXT/ISSUES:
This Term Achievement is
seen as tackling two significant issues in the City, being: the reduction of domestic waste being taken
to landfill; and the amount of waste being dumped on private property and
public land.
Waste is being seen as a
resource, which can be utilised for other means, including: energy creation; high and low-grade compost;
and importantly reuse and recycling of the product.
This term achievement has a
sustainability focus, and as such the principles of Councils Sustainability
Action Plan should be adopted wherever possible.
Technologies are not
available to convert all waste to useable products. Reuse of materials, recycling, mulching and composting of garden
and food wastes (organics), and the use of alternative waste technologies (AWT)
are seen as methods that can reduce the quality of waste being sent to
landfill.
At this time, there has been
limited success for AWTs in Australia, and it appears that they output is a low
grade product, in both mulch, and product for further recycling.
Mulching and composting of
garden waste has been utilised as a method to convert waste that would
otherwise be sent to landfill to a useable product.
There is some doubt that
there are sufficient markets to utilise the total volume of green waste that
would be generated by all Councils if the chance to introduce such a service.
Garden waste can be improved by the addition of food waste to make a more
saleable product. The technology to process food and garden organics are being
developed.
Council currently sends
approximately 80% of its domestic waste to landfill; the remaining volume is
recycled.
The NSW Strategy for waste
reduction and resource recovery identifies that the target of total waste being
recovered from the waste stream is 66%, by2014.
There are many options that
can be taken to divert waste from landfill, and careful consideration needs to
be undertaken to ensure that Council utilises a sustainable method. The development of a Waste Strategy for the
reduction of domestic waste in Penrith in necessary to identify the overarching
goals and potential systems that can be utilised.
The impacts of such a
Strategy, in regard to resourcing, cannot be determined until it has been
developed and costed. However, it is
evident from other councils that increasing the recovery of recyclable material
and reprocessing of waste to other usable forms will result in an increase in
cost.
Council’s current
waste contracts expire in 2006/07 and new contracts need to be prepared, in
line with the adopted Waste Strategy.
A key component
to achieving the KPI’s of the waste Service is Councils education program. This
program currently focuses on the wider community and, primary schools. Waste
education programs will need to be amended and possibly increased (at least for
the short term) to achieve the desired outcomes to any change to the current
waste service.
The illegal dumping of waste
on private and public property is a significant issue in the LGA.
The regulation of this issue
is primarily actioned by the Regional Illegal Dumping (RID) squad. The RID squad is supported financially by
the Department of Environment and Conservation. Should the RID squad be
discontinued there would be resourcing implications for Council to continue
with this regulatory program.
The RID squad has been
successful in reducing the amount of waste being illegally dumped in the LGA.
There ha been a reduced number of waste dumping incidents that are of a
significant size, and the nature of illegal dumping has changed from primarily
Commercial and Industrial to residential since the inception of the squad.
This may be attributed to
the fact that previously the significance of the C&I waste dumping
incidents far outweighed the domestic waste dumping incidents. With the reduction of C&I incidents the
domestic waste dumping has become more to exposed.
A review of the size of the
problem in the LGA is required and the possible implementation of
new/additional strategies is required to reduce this problem.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council has
adopted a domestic waste strategy which identifies the staged implementation of
programs to significantly reduce domestic waste to landfill. A co-mingled
recycling service is due to be implemented in March 2006, which will provide
residents with an increased capacity to recycle. 13,473 tonnes of domestic
waste has been processed through the Eastern Creek UR-3R waste processing
facility this year, of which WSN Environmental Services have advised that 80%
has been diverted from landfill. On this basis 48% of domestic waste (including
recycling) has been diverted from landfill to date this year.
Council continues
to participate in the Regional Illegal Dumping (RID) Squad, targeting the
illegal disposal of waste. Waste that is illegally dumped is required to be
removed by the offender and diverted to a suitable waste disposal facility.
Illegally dumped waste adjacent to residential premises is removed by Council's
Waste contractors and Asset Management staff prior to further accumulations
occurring.
*****
TERM ACHIEVEMENT 17.3 (CM) |
COUNCIL
LEADS OUR CITY BY EXAMPLE AND THROUGH ADVOCACY BY IMPLEMENTING SUSTAINABILITY
INITIATIVES. |
This will focus on
reducing consumption of natural resources including fossil fuels and
promotion of sustainable behaviour through engagement with the City’s
organisations communities and business groups. |
CONTEXT/ISSUES:
In 1999, Council adopted the Sustainable Penrith program, acknowledging
the emerging international view that a healthy future for our environment, our
economy and our society can only be achieved by balancing the pressures and
demands of these three elements. The Sustainable Penrith Action Plan adopted in
December 2003 is Council’s plan of action towards a sustainable future for our
City. The Plan is based on the United
Nations Environment Program (UNEP) Principles for Sustainable Cities. The UNEP
Principles are also now incorporated in the Strategic Plan.
Council has been an active member of the International Council for
Local Environmental Initiatives (ICLEI), through its involvement in the Cities
for Climate Protection™ Program (CCP), and various pilot programs for issues,
including Water, Energy and Transport.
These programs provide information, guidance and systems to assist
Council and the City’s communities work towards a more sustainable future.
The Sustainable Penrith program developed initially through a strong
emphasis on community awareness and education, for which Penrith City has
received considerable recognition. The current focus of the program, whilst
maintaining community awareness and education, requires a stronger focus on
Council’s role as a leader and facilitator – ensuring Council’s own activities,
decision-making process and operations demonstrate that commitment to
sustainability that Council is encouraging in the City’s communities.
Leadership must involve taking Sustainability from the margins to the
mainstream. We must harness our dynamism, innovation and determination and turn
obstacles into opportunities. Rising
fuel costs, increased air pollution, the threat of global warming and climate change,
and the focus on sustainability, presents many opportunities for Council in
providing leadership to the City.
Within Council, ‘Sustainable
Penrith’ will ensure that the principles of sustainability are incorporated in
the vision, goals, strategies, systems and processes of this organisation. Within the community, the strategy should be
seeking to ensure that the principles of sustainability are incorporated in the
decision-making, planning and implementation of any business, environmental,
social or other activities.
MANAGER’S
COMMENTS ON TERM ACHIEVEMENT PROGRESS:
Council’s
leadership has been demonstrated through a continuing range of actions and
advocacy aimed at reducing the consumption of natural resources. Key elements
of these programs are commented on below. Current initiatives include Sydney
Water’s 'Every Drop Counts', and Council's Energy Performance Contract, and
these have been enhanced by the development and adoption of new Water and
Energy Action Plans for the City.
An extra
challenge has been added by the requirements notified by the State Government
in December for additional local government water and energy plans - these in
the short term will divert resources from Council’s adopted strategies. A key
focus of the Sustainable Penrith Action Plan in 2005-06 is the implementation
of a Sustainability Indicators system for the City and Council. This will be
based on the UNEP Principles adopted by Council and assisted by our partnership
with ICLEI and the Sustainability Reporting Alliance (refer to TA33.2).
Best practice
research is a critical component of our Sustainability program. The
Sustainability Steering Committee continues to encourage opportunities for
enhancing the integration of sustainability, including endorsement of
Guidelines for the Sustainability Revolving Fund. Targets have been set for a
more sustainable Council vehicle fleet from 2006 onwards. Council is also
working in partnership with ICLEI to trial the Sustainable Transport Survey and
Program.
The appointment
of a new Sustainable Design Advisor was deferred due to staff vacancies to
manage the position - this will now be remedied. Progress of Council’s
Greenhouse Strategy initiatives was delayed by the withdrawal of a supplier for
energy-efficient water heaters - this element of the program must be recast.
The promotion of sustainable production and consumption, and sustainable
procurement, is an ongoing activity in working across Council as an
organisation and with our communities.
Preliminary
research regarding 'best practice' approaches to sustainable procurement has
been undertaken. Council recently joined the Department of Environment and
Conservation's Buy Recycled Alliance, to participate in waste avoidance,
reduction and sustainable practices in tendering and purchasing. Collaborative
partnerships with the City’s communities, organisations and business groups
have been developed through the Sustainability Street program, which has now
successfully 'graduated' the City's first two participating streets. An
additional two streets are ready to start in 2006.
A successful
Energy Efficient Light Globe pilot program was carried out in partnership with
Origin Energy and further opportunities are being explored. A partnership has
been entered with Ecosmart to look at water and energy conservation will
provide an exciting opportunity for small to medium sized business. Partnership
with Sydney Water in the 'Every Drop Counts' program continues and has been
invaluable in the intensive preparations for the new mandatory Water Savings
Plan and Energy Savings Plan.
*****
ISSUE 18: BUILT ENVIRONMENT (DCP)
Longer Term Goal: The built
environment delivers quality living and
working environments with ecological responsibility.
DIRECTOR COMMENTS ON THIS
ISSUE: